Sei sulla pagina 1di 9

ENVA WATER TECHNOLOGIES PVT. LTD.

Feel the real experience


PLOT No.

TECHNO-COMMERCIAL PROPOSAL FOR


EFFLUENT TREATMENT PLANT BASED ON
MBBR Technologies

(Capacity – 20m3/day)

SUBMITTED TO CLIENT;
RINAC INDIA LTD.
Kolkata

SUBMITTED BY;

ENVA WATER TECHNOLOGIES PVT. LTD.


Bhubaneswar

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

Ref. No – EWTPL/RIL/0463/19-20 Date – 19:03:20

ANNEXURES

Our offer consists of following annexure:

ANNEXURE - 1 : TECHNICAL DETAILS

A. DESIGN BASIS
B. TREATMENT SCHEME
C. TREATMENT PROCESS DESCRIPTION

ANNEXURE - 2 : SCOPE OF SUPPLY AND WORK

A. SCOPE OF SUPPLIES
B. SCOPE OF WORK
C. BATTERY LIMITS
D. EXCLUSIONS LIST

ANNEXURE - 3 : COMMERCIAL SCHEDULE

A. COMMERCIAL TERMS AND CONDITIONS


B. PRICE AND TERMS OF PAYMENT

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

ANNEXURE -1: TECHNICAL DETAILS

A. DESIGN BASIS

 Flow rate: 20m3/day


 Operation Time: 16 hrs.
 Nature of Effluent: Effluent from Brewery Plant.
 Mode of disposal of treated water: To Sewage Treatment plant.

Based on our experience, we have considered the above mentioned inlet conditions for
design purpose. Customer to recheck & notify in case of any changes before placement
of order.

Characterization of Wastewater:

Sr. No. Parameters Characteristic


Incoming Effluent Treated Effluent
A) Ph 4.7- 8.0 7.0 – 8.0

B) Suspended Solid <375 mg/l Less than 50 mg/l

C) BOD <800 mg/l Less than 50 mg/l

D) Oil & Grease <50 mg/l Less than 10 mg/l

E) COD <1700 mg/l Less than 250 mg/l


Note:
Treated water quality is subject to inlet raw effluent parameters. Any large change in
inlet parameters may effect and change treated effluent quality.

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

B. TREATMENT SCHEME

Air blower

M
P.TS B S.TS
B C
R C
RAW T
WATER O&G

I/L
BS
EQT

TREATED
SDB WATER TO STP

C. TREATMENT PROCESS DESCRIPTION

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

Screening
Influent is received into the screening chamber by gravity. Screen
provided will remove all floatables and big size material such as
plastic bottles, glasses, stones, etc., which may creates operational
problems clogging and higher head lost, which may lead to
overflow of the tanks.

Oil and Grease Trap


Effluent generated includes higher concentrations of oil and
grease in it. It needs to be removed before biological treatment
as it otherwise may cause problems for biological treatment.
Usually, a small civil construction tank or a pre-fab MSEP tank
with a baffle wall is provided. The oil and grease removed by
gravity floats to the surface, which is removed manually or by
an oil skimmer.

Equalization Tank
Influent generation is abnormal in a process plant. For any biological system needs constant
feed for bacteria to work efficiently. It is usually economical to use a flow equalization tank
to meet the peak discharge demand. A typical equalization tank has a suitable capacity to
accommodate the abnormal flow. The tank is generally of civil construction by client.

Biological Treatment
The main pollutants in the influent are represented in the form of
Biological Oxygen Demand (BOD) and Chemical Oxygen Demand
(COD). The bacterial ability to synthesize the organic matter to
harmless end products like carbon dioxide and water molecules is
utilized to treat the influent.
The bio-reactions are carried out in controlled environment in the
moving bed bio-reactor. The MBBR comprises of a tank, fitted with
aeration grid/ diffuser and filled with PP media. The bacterial
activity needs dissolved oxygen, to synthesize the organic matter.
This is supplied by passing air in form of small bubbles. The air is
passed at the bottom of the tank, so that complete volume of tank is
utilized. Oxygen dissolves in liquid, which can now be used by the
bacteria.

Sedimentation
Sedimentation is also known as clarification, has a working
mechanism based on the density between suspended solid and
water, allowing SS with larger particle sizes to more easily settle
down. Hence a secondary clarifier in the form of a tube settler is
provided. The settled mass is to drained and discarded as sludge.

Sludge Handling System (Optional)

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

The residue that accumulates in effluent treatment plants is called sludge. Treatment and
disposal of sludge are major factors. The sludge from the Reactors and Tube settler is
removed from the bottom of the tanks and transferred for further disposal to sludge drying
bed.

ANNEXURE -2: SCOPE OF SUPPLY & WORK

A. SCOPE OF SUPPLIES

EQUIPMENTS SPECIFICATION MAKE MOC QTY

BAR SCREEN 20 KLD ETPL SS 1 NO

EFFLUENT FEED PUMP NON-CLOG PUMP 0.37 KIRLOSKAR/EQV. CI 2 NO.


KW
AIR BLOWER POSITIVE AKASH/ EQV. CI 2 NO.
DISPLACEMENT TWIN
LOBE ROOT TYPE
AIR BLOWERS MOTOR 1.5 KW CG/EQV. CI 2 NO.

ALUM DOSING PUMP 0-4 LPM E-DOSE/ EQV. PP 1 NO.

NAOH DOSING PUMP 0-4 LPM E-DOSE/ EQV. PP 1 NO.

ALUM DOSING TANK SUITABLE ETPL APPROVED PVC 1 NO.

NAOH DOSING TANK SUITABLE ETPL APPROVED PVC 1 NO.


MBBR MEDIA 400 M2/M3 TECPRO/EQV. PP 1 LOT

DIFFUSERS TUBULAR TYPE TECPRO/EQV. EPDM 1 LOT.

TS MEDIA CHEVRON TYPE TECPRO/EQV. PP 1 LOT


ICPW EFFLUENT LINE SUITABLE FINOLEX/SUPREME UPVC 1 LOT
/EQV.
ICPW AIR LINE & SLUDGE SUITABLE TATA/ EQV. MS 1 LOT
LINE
CONTROL PANEL SUITABLE L&T/ SIEMENS SUITAB 1 SET
LE
LEVEL SWITCH FLOATY TYPE D.K. INSTRU./ EQV. PP 2 NOS.

O&G T-PIPE SUITABLE ETPL PVC 1 NO.

AIR DISTRIBUTION SYSTEM SUITABLE ETPL MSEP/U 1 LOT


FOR EQT & MBBR PVC
SLUDGE TRANSFER PUMP NON-CLOG PUMP 0.37 KIRLOSKAR/EQV. CI 1 NO.
KW

B. SCOPE OF WORK

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

 Design, Supply, Testing, Erection and Commissioning of Effluent Treatment Plant


(ETP) excluding all civil & structural works.
 Drawings for civil works to be provided by ETPL if needed by the client.
 P&I drawing will be provided.
 All foundation and civil works to be carried out by the client.
 Training can be provided to the operator of the ETP from the client’s side.

C. BATTERY LIMITS

1. Raw Effluent : At the inlet of Screening Pit.


2. Treated water : At the outlet of CCT.
3. Sludge : At the drying bed.
4. Power : At the inlet of Control Panel.

D. EXCLUSION LIST

1. All civil works including structural design, constructions of tanks, foundations, drains,
supports of all types, platforms, drain channels and plants building (if required).
2. Electrical work such as incoming to panel, earthing & illumination.
3. All piping & supports outside our battery limit. Sewage pumping and piping up to our Bar
Screen Chamber & piping from outlet of ACF will be in customer scope.
4. The plant works in manual mode/ automation.
5. All consumable ( chemicals, oil, Greece, lubricants) even in commissioning stage including
the first charge also.
6. Material Unloading & Storing facility. Client has to arrange the material nearer to the site
at the time of erection & commissioning.
7. Site security and safe custody of materials.
8. All sheds, covers and boundary walls for the ETP are excluded from ETPL’s responsibility.
9. All water and or wastewater sample testing charges before, during and after
commissioning of the ETP has to be borne by the client.
10. Water and Power supply during commissioning as per design specification.
11. Testing and inspection of the equipment at site.
12. Laboratory facilities including necessary instruments, chemicals and staff (if required).
13. All supplies and services not specifically mentioned as part of our offer.

ANNEXURE -3: COMMERCIAL SCHEDULE

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

A. COMMERCIAL TERMS AND CONDITIONS

DELIVERY
We shall design, manufacture and supply the equipment within 2 - 3 WEEKS. The above
delivery period shall be reckoned from the date of receipt of advance and commercially and
technically clear purchase order, whichever is later.

WARRANTY FOR EQUIPMENT


All our equipment is thoroughly inspected before dispatch and therefore can be depended
upon for long and trouble free service. Our liability in respect of any defect or failure in the
equipment supplied and commissioned by us or any loss, injury or damage attributable
therefore shall be limited to making good by replacement or repairs, provided the
equipment is operated and maintained in accordance with our instructions and arise totally
from proven faulty design, materials or workmanship. This warranty shall be valid for a
period of 12 months from the date of commissioning of the equipment or 18 months from
the date of last invoiced dispatch, whichever is earlier.

WAREHOUSING CHARGES
Should dispatches be delayed on our purchaser's instructions or any other reason
attributable to Purchaser, warehousing expenses shall be payable by the Purchaser @2% of
the consignment value per month or part thereof.

VALIDITY
Unless previously revoked, our offer shall be valid for 30 days from the date of this proposal.

GENERAL
Any condition or other matters pertaining to this offer not expressly stipulated will be a
matter of mutual discussions and agreement at the time of accepting the order.

RETURN OF EXCESS MATERIAL


In order to facilitate the Installation & Commissioning, we sometimes send extra material
while dispatching the material. After the installation is over, we reserve the option to take
back such material.

ERECTION & COMMISSIONING


The installation period shall be @ 2 to 3 weeks after readiness of civil work & availability of
site. Commissioning shall require to continuous availability of Water, Power & Chemicals.

B. PRICE AND TERMS OF PAYMENT

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com
ENVA WATER TECHNOLOGIES PVT. LTD.
Feel the real experience
PLOT No.

Our most competitive price for the Design, engineering, Supply, Erection & Commissioning of
the Plant as described in the offer with shall be as follows:
Rs. 4, 75,000.00 (Rupees Four Lakhs Senty Five Thousand Only)

PRICE BASIS:
 Taxes extra as applicable on the above price.
 Transportation charges will be extra at actual.
Please Note: If there are any statutory variations/implications in taxes and duties before the
expiry of delivery date, the same will be to your account.

TERMS OF PAYMENT

 40% of the total value of the order to be paid as advance along with the technically and
commercially clear purchase order.
 Balance 55% of the total value of the order to be paid along with full value of all taxes,
duties and other levies against readiness of material for dispatch and submission of
Performa invoice prior to dispatch.
 5% to be paid against erection, commissioning & hand over of the system.

Thanking you,
Regards,

For. ENVA WATER TECHNOLOGIES

Kamala kanta Samal


+91-7894506604

Plot no: 174, District Center, C.S. Pur,


Bhubaneswar, Odisha. Tel: 0674-2747071, 7205044260
E-mail:info@envawater.com, Website: www.envawater.com