DETERMINATION OF RESPONSIVE AND NON-RESPONSIVE BIDDERS

Total number of bidders applied


BASIC ELIGIBILITY CRITERIA FOR TECHNICAL EVALUATION

Total number of responsive


Litigation Affidavit provided

Technical Design Evaluation

Total number of Non-


RECOMMENDATIONS
JV agreement on Original

Responsive Bidders
Status (standardization
certification and codes)

Photocopy of 2 % CDR
Valid PEC Registration

Blacklisting Affidavit
Estimated
Cost Total

EE 11 SOLAR

stamp paper

bidders
Form of Bid
Package (Million) / Masajid Firm PEC

provided
Region COMPANY / FIRM NAME

KPRA
STRN

SECP
Detail Required in each Category

NTN
PEC package
Category

TSK ENGINEERING INTL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package 01 Peshawar 295.358 M / C3 559 2 1 1


NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No RESPONSIVE

ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package 02 Mardan 164.323 M / C4 311 CITI TEK (PVT) LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 3 2 1

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-
RESPONSIVE

ENERTECH (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

SKY GREEN ENGINEERING C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes
a) Charsadda
Package 03 b) Nowshera 217.16 M / C3 411 RESPONSIVE 4 3 1
TSK ENGINEERING INTL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
ENERTECH (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

ALI HAIDER & BROTHERS C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

QRI CONSTRUCTION PVT LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
(LEAD FIRM)
RESPONSIVE
PAK RELIABLE ENGINEERING CO (SMC) PVT
Package 04 Swabi 112.54 M / C4 213 LTD (JV FIRM) C4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 6 5 1

ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

CITI TEK (PVT) LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-
RESPONSIVE

ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes Yes Yes RESPONSIVE

AKHUNDZADA ASSOCIATES C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

a) Abbottabad
Package 08 b) Haripur 162.209 M / C4 307 RENEWABLE POWER (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 5 4 1

NRTC CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-
RESPONSIVE

a) Mansehra
Package 09 b) Batagram 206.592 M / C3 391 AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON- 1 0 1
c) Torghar RESPONSIVE
d) Kohistan

Project Management Consultant under the Consultant Services Agreement TORs appendix -A item( a ) carried out the technical Evaluation of the Contractors and recommends the same for onwards
approval of the client.

Project Management Consultant also recommends the re-invitation of bids for package 09, where no bidder is technically qualified, for onward approval of the Client.

Evaluation Report Submitted Project Manager


by Ultimate Engineering Consultant Signature: _____________________
DETERMINATION OF RESPONSIVE AND NON-RESPONSIVE BIDDERS

BASIC ELIGIBILITY CRITERIA FOR TECHNICAL EVALUATION

Total number of Non-Responsive Bidders


Total number of responsive bidders
(standardization certification and codes)
JV agreement on Original stamp paper

Total number of bidders applied


Technical Design Evaluation Status
Blacklisting Affidavit provided

Litigation Affidavit provided

RECOMMENDATIONS
Valid PEC Registration

Photocopy of 2 % CDR
Estimated Cost Total

EE 11 SOLAR

Form of Bid
Package (Million) / Masajid in Firm PEC
Detail Region Required PEC each COMPANY / FIRM NAME Category

KPRA
STRN

SECP
NTN
Category package

MAK PUMPS PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

a) Swat
Package b) Buner 274.7524 M / 520 ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 3 2 1
05 c) Shangla C3

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE

MAK PUMPS PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package a) Malakand 149.00034 M /


06 b) Lower Dir C4 282 AKHUNZADA ASSOCIATES PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 3 2 1

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE

AKHUNZADA ASSOCIATES PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

QRI CONSTRUCTION PVT LTD


(LEAD FIRM) C3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Package a) Upper Dir 96.69171 M /
07 b) Chitral C4 183 RESPONSIVE 3 2 1
PAK RELIABLE ENGINEERING CO (SMC) PVT C4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
LTD (JV FIRM)

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE
TSK ENGINEERING INTERNATIONAL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package a) Bannu
10 b) Lakki Marwat 168.55003 M / 319 NRTC PVT LTD CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 3 2 1
c) Tank C4

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE

ALI HAIDER & BROTHERS ENGINEERING CO C3 Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes Yes Yes RESPONSIVE

RENEWABLE POWER PVT LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package a) Kohat 153.75567 M /


11 b) Hangu C4 291 ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 5 4 1
c) Karak

PESHAWAR PIPE & CONSTRUCTION PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE

TSK ENGINEERING INTERNATIONAL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

NRTC PVT LTD CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

Package 112.54281 M /
12 D. I. Khan C4 213 ASSOCIATED TECHNOL0GIES PVT LTD CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 5 4 1

SOLAR TECH PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No NON-RESPONSIVE

Project Management Consultant under the Consultant Services Agreement TORs appendix -A item( a )carried out the technical Evaluation of the Contractors and recommends
the same for onwards approval of the client

Evaluation Report Project Manager


Submitted by Barg Engineering Consultant Signature: _____________________
RECOMMENDATION OF THE RESULTS BY THE PROCUREMENT COMMITTEE

Total number of responsive bidders


BASIC ELIGIBILITY CRITERIA FOR TECHNICAL EVALUATION

Total number of Non-Responsive


Total number of bidders applied
Blacklisting Affidavit provided

Technical Design Evaluation


Litigation Affidavit provided

RECOMMENDATIONS
JV agreement on Original

Status (standardization
certification and codes)

Photocopy of 2 % CDR
Valid PEC Registration
Estimated
Total

EE 11 SOLAR

stamp paper

Bidders
Project Cost (Million)

Form of Bid
Contractor Masajid in Firm PEC
Consultants Region / COMPANY / FIRM NAME

KPRA
STRN

SECP
Package Detail each Category

NTN
Package Required PEC
package
Category

TSK ENGINEERING INTL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
Package 01 Peshawar 295.358 M / C3 559 2 1 1
NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
ASSOCIATED TECHNOL0GIES PVT
CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
LTD

Package 02 Mardan 164.323 M / C4 311 CITI TEK (PVT) LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 3 2 1

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
Engineering Consultants Package-1

ENERTECH (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

SKY GREEN ENGINEERING C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
a) Charsadda
Package 03 217.16 M / C3 411 4 3 1
b) Nowshera
TSK ENGINEERING INTL PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
Ultimate

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE

ENERTECH (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

ALI HAIDER & BROTHERS C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

QRI CONSTRUCTION PVT LTD


C3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
(LEAD FIRM)
RESPONSIVE
Package 04 Swabi 112.54 M / C4 213 PAK RELIABLE ENGINEERING CO 6 5 1
C4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
(SMC) PVT LTD (JV FIRM)

ASSOCIATED TECHNOL0GIES PVT


CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
LTD

CITI TEK (PVT) LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
MAK PUMPS PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

a) Swat ASSOCIATED TECHNOL0GIES PVT


274.7524 M / CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
Package 05 b) Buner 520 LTD 3 2 1
C3
c) Shangla
NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
Engineering Consultants Package-2

MAK PUMPS PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

AKHUNZADA ASSOCIATES PVT


a) Malakand 149.00034 M / C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
Package 06 282 LTD 3 2 1
b) Lower Dir C4

NON-
Barg

AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE

AKHUNZADA ASSOCIATES PVT


C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
LTD

QRI CONSTRUCTION PVT LTD


C3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
(LEAD FIRM)
a) Upper Dir 96.69171 M /
Package 07 183 RESPONSIVE 3 2 1
b) Chitral C4
PAK RELIABLE ENGINEERING CO
C4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
(SMC) PVT LTD (JV FIRM)

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE

ASSOCIATED TECHNOL0GIES PVT


CB Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes Yes Yes RESPONSIVE
LTD
Engineering Consultants Package-3

AKHUNDZADA ASSOCIATES C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

a) Abbottabad
Package 08 b) Haripur 162.209 M / C4 307 5 4 1
RENEWABLE POWER (PVT) LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
Ultimate

NRTC CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE

a) Mansehra
b) Batagram NON-
Package 09 206.592 M / C3 391 AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No 1 0 1
c) Torghar RESPONSIVE
d) Kohistan
TSK ENGINEERING
C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
INTERNATIONAL PVT LTD
a) Bannu
Package 10 168.55003 M / NRTC PVT LTD CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
b) Lakki Marwat 319 3 2 1
C4
c) Tank
NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
Engineering Consultants Package-4

ALI HAIDER & BROTHERS


C3 Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes Yes Yes RESPONSIVE
ENGINEERING CO

RENEWABLE POWER PVT LTD C3 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
a) Kohat
153.75567 M / ASSOCIATED TECHNOL0GIES PVT
Package 11 b) Hangu 291 CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 5 4 1
C4 LTD
c) Karak
Barg

PESHAWAR PIPE &


C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
CONSTRUCTION PVT LTD

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE
TSK ENGINEERING
C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE
INTERNATIONAL PVT LTD

NRTC PVT LTD CA Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

112.54281 M / ASSOCIATED TECHNOL0GIES PVT


Package 12 D. I. Khan 213 CB Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE 5 4 1
C4 LTD

SOLAR TECH PVT LTD C2 Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes RESPONSIVE

NON-
AQ BUILDERS PVT LTD C1 Yes Yes Yes Yes Yes Yes Yes Yes N/A No Yes No
RESPONSIVE

Recommendations By Procurement Committee:


(1) The Procurement Committee revisited, reviewed and re-examined the technical evaluation reports and unanimously recommended the financial bid opening of technically responive bidders for the following
packages:
Package-01 (i) M/S TSK Engineering Intl. Pvt Ltd
Package-02 (i) M/S Associated Technology Pvt Ltd (ii) M/S Cititek Pvt Ltd
Package-03 (i) M/S Enertech Pvt Ltd (ii) M/S Sky Green Engineering (iii) M/S TSK Engineering Intl Pvt Ltd
Package-04 (i) M/S Enertech Pvt Ltd (ii) M/S Ali Haider & Brother (iii) M/S QRI Construction Pvt Ltd (Lead) M/S Pak Reliable Engineering CO (SMC) Pvt Ltd (JV) (iv) M/S Associated Technologies Pvt Ltd (v) M/S Cititek Pvt Ltd
Package-05 (i) M/S MAK Pumps Pvt Ltd (ii) M/S Associated Technologies Pvt Ltd
Package-06 (i) M/S MAK Pumps Pvt Ltd (ii) M/S Akhunzada Associates Pvt Ltd
Package-07 (i) M/S Akhunzada Associates Pvt Ltd (ii) M/S QRI Construction Pvt Ltd (Lead) M/S Pak Reliable Engineering CO (SMC) Pvt Ltd (JV)
Package-08 (i) M/S Associated Technologies Pvt Ltd (ii) M/S Akhunzada Associates Pvt Ltd (iii) M/S Renewable Power Pvt Ltd (iv) M/S NRTC
Package-10 (i) M/S NRTC (ii) M/S TSK Engineering Intl Pvt Ltd
Package-11 (i) M/S Ali Haider & Brothers (ii) M/S Renewable Power Pvt Ltd (iii) M/S Associated Technologies Pvt Ltd (iv) M/S Peshawar Pipes & Construction Pvt Ltd
Package-12 (i) M/S TSK Engineering Intl Pvt Ltd (ii) M/S NRTC (iii) M/S Associated Technologies Pvt Ltd (iv) M/S Solar Tech Pvt Ltd

(2) The procurement committee also recommended to re-invite bids for contractor package No 9 (includes in consultant package No 3) on the basis that there was no technical qualified bidder left in the package
No 9 as M/S AQ builder was disqualified on the basis of non-compliance of technical criteria mentioned in the bidding documents.

The Procurement committee decided to forward the above two recommendations for consideration of the Management Committee and onward submission to the PEDO Board for further consideration and approval.

Director (Finance & Administration) Project Director (Solar) Director (Planning & Facilitation)
PEDO (Member) / Representative PEDO (Chairman) PEDO (Member) / Representative