Sei sulla pagina 1di 3

R4.NOUEISS TCE.

M4-107-07 TCE CONSULTING ENGINEERS LIMITED SECTION : D


ENQ. SPEC. NO. DATA SHEET A
TCE. AIR DRYING PLANT SHEET : 1 OF 2

REFRIGERATED TYPE
1. DESIGNATION : AIR DRYING PLANT 25. DESIGN CODES : ASME SEC VIII DIV 1
FOR AND TEMA C

AIR-TO-AIR HEAT EXCHANGER


26. CORROSION ALLOWANCE : 3/1.5 mm
2. NUMBER REQUIRED : 27. SHELL : SA 106 GR B / IS 2002 GR 2
3. TAG NUMBERS : 28. TUBES : COPPER/ADMIRALITY BRASS
LARENEG

AS PER BS EN 1057 (NOTE 2)


4. OPERATION : CONTINUOUS / 29. TUBE SHEET : IS 2002 GR 2 / SA 105
INTERMITTENT Hrs/DAY 30. BAFFLE PLATES : IS 2062 GR B /
5. LOCATION : INDOOR / OUTDOOR IS 2002 GR 2
6. INLET AIR QUALITY : OIL FREE OR OIL 31. MOISTURE SEPARATOR :
CONTAMINATED COMPRESSED AIR CENTRIFUGAL TYPE WITH DEMISTER
7. APPLICABLE CODE : IS 11989 PAD AND AUTOMATIC DRAIN TRAP
8. 32.
DESIGN DATA

9. DESIGN CAPACITY (FAD) :


33. CONTROL SIGNAL LAMPS FOR
M3/Hr
10. OPERATING PRESSURE :
POWER, CONTROL SUPPLY ON
Kg/cm²(g)
(NOTE 3)CONTROLS

11. DESIGN PRESSURE :


34. SWITCHES/PUSH BUTTONS FOR
Kg/cm²(g)
12. MAXIMUM ALLOWABLE PRESSURE 34.1 COMPRESSOR ON / OFF
DROP ACROSS AIR DRYING PLANT : 34.2 ACKNOWLEDGE/RESET/ TEST
Kg/cm² 34.3 AUTO/MANUAL CHANGEOVER
13. AIR INLET TEMPERATURE :
SELCTOR SWITCH
C
14. AIR OUTLET TEMPERATURE :
35. ANNUNCIATION SYSTEM
C
15. OUTLET AIR DEW POINT (NOTE 1) : 36.
MISCELLANEOUS

15.1 AT ATMOSPHERIC PRESSURE :


37. BY PASS ARRANGEMENT FOR THE
C
15.2 AT OPERATING PRESSURE : PLANT REQUIRED : YES /
C NO
16. QUALITY OF COOLING WATER (CW) : 38. ALL THE VALVES, SPECIALITIES,
REFER TCE. INSTRUMENTS AND ACCESSORIES AS
17. CW INLET TEMPERATURE :
PER ENCLOSED P&ID TCE.
C
18. MAXIMUM ALLOWABLE CW OUTLET : REQUIRED (NOTE 3)
TEMPERATURE :
39. COUNTER FLANGES FOR ALL THE
C
19. CW INLET PRESURE :
CONNECTIONS AT BATTERY LIMITS
Kg/cm²(g)
20. MAXIMUM ALLOWABLE CW WITH NUTS, STUDS, BOLTS, GASKETS
PRESSURE DROP : AND WASHERS REQUIRED : YES /
Kg/cm² NO
21. CONTROL POWER SUPPLY :
40. FLANGES : AS PER
V
22. P&I DIAGRAM NO. : TCE.
41. FOUNDATION BOLTS REQUIRED :
23. PIPING : REFER PIPING MATERIAL YES / NO
SPECIFICATION (PMS) TCE. 42. ERECTION BY CONTRACTOR : YES/NO
43. ERECTION SUPERVISION BY
CONTRACTOR : YES /
24.
NO
REV.NO. PPD. BY : JOB NO. CLIENT:
DATE CHD. BY : TCE.
REV. BY DATE : PROJECT:
FILE NAME : DA10707R4.DOC TCE
FORM NO. 330 R1
TCE.M4-107-07 TCE CONSULTING ENGINEERS LIMITED SECTION : D
ISSUE NO. R4

ENQ. SPEC. NO. DATA SHEET A


TCE. AIR DRYING PLANT SHEET : 2 OF 2

REFRIGERATED TYPE

INSPECTIONTESTS AND
44. PRIMER : RED OXIDE/ EPOXY 54. TCE.M4-904 AND / OR TCE.M4-185-01
44.1 NUMBER OF COATS : AND TCE.M4-185- OR TCE.M4-186-32
44.2 DRY FILM THICKNESS PER COAT : (NOTE 4)

µ 55.
PAINTING

45. FINISH PAINT : SYNTHETIC ENAMEL/ 56. DESIGN CAPACITY (FAD) :


EPOXY / (+) M3/Hr
45.1 NUMBER OF COATS : () M3/Hr
45.2 DRY FILM THICKNESS PER COAT : 57. OUTLET AIR DEW POINT AT
µ ATMOSPHERIC PRESSURE :
46. (+) C
PERFORMANCE GUARANTEES
SPARES AND MAINTENANCE TOOLS SPECIFICATIONSCOMPANION

47. RECIPROCATING LIQUID CHILLING () C


PACKAGES : TCE.M4-122-
58. PRESSURE DEW POINT AT OUTLET :
04
48. REFRIGERATION PIPING : (+) C
TCE.M4-122-14 () C
49. INSULATION : TCE.M4-104-
59. AIR PRESSURE DROP ACROSS THE
03
PLANT : (+)
50. INSTRUMENTATION :TCE.M4-107-IC-02
Kg/cm²
51. () Kg/cm²
52. REFER TCE.M4-907 60. TOTAL POWER CONSUMPTION PER
CYCLE : (+)
53. ESSENTIAL SPARES
KW
()
53.1
KW
COST LOADING

53.2 61. TOTAL POWER CONSUMPTION/CYCLE:


53.3 Rs. / KW
53.4 62.
53.5 63.
53.6 64.
VENDORSLIST OF SUB-
65. VALVES &
SPECIALITIES
66. AUTO DRAIN TRAPS
67. DEW POINT METERS
68. CONTROL PANEL AND INSTRUMENTS : REFER

69.

NOTES
1. THE FLOW THROUGH THE AIR DRYING PLANT MAY VARY. HOWEVER, THE SPECIFIED AIR
DEW POINT TEMPERATURE SHALL BE ACHIEVED FOR ANY FLOW UPTO DESIGN CAPACITY.
2. EXCEPT FOR EDDY CURRENT TESTING.
3. ONLY MINIMUM REQUIREMENTS HAVE BEEN INDICATED. FOR DETAILS REGARDING
INSTRUMENTATION AND CONTROLS, REFER ENCLOSED TCE.M4-107-IC-02.
4. FOLLOWING ADDITIONAL TESTS INDICATED AS ‘B’ IN TCE.M4-186-32 SHALL ALSO BE CARRIED
OUT WHEN TCE.M4-186-32 IS APPLICABLE :

REV.NO. PPD. BY : JOB NO. CLIENT:


DATE CHD. BY : TCE.
REV. BY DATE : PROJECT:
FILE NAME : DA10707R4.DOC TCE FORM NO.
330 R1

Potrebbero piacerti anche