ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09 0.14
14 4103 522-V-103 AMINE REGENERATOR-I REBOILER FORECAST 0.00
CONDENSATE POT
ACTUAL 0.14
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
15 4103 522-V-203 AMINE REGENERATOR-II REBOILER FORECAST
CONDENSATE POT
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
16 4103 522-V-105
AMINE SUMP DRUM FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
17 4103 522-V-104
HYDROCARBON SKIM OFF VESSEL-I FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
18 4103 522-V-204
HYDROCARBON SKIM OFF VESSEL-II FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
19 4103 522-V-108
ACID FLARE KNOCKOUT DRUM FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09
20 4103 520-V-101 SOUR WATER SURGE DRUM-1 FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
520-V-102 SINGLE STAGE STRIPPER REBOILER
21 4103
COND DRUM FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
520-V-103
22 4103 SOUR WATER BLOW DOWN DRUM FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
521-V-201
23 4103 SOUR WATER SURGE DRUM-II FORECAST
ACTUAL
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
521-V-202 IST STAGE REBOILER CONDENSATE
24 4103
DRUM FORECAST
ACTUAL
3 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.40% SCHEDULE 27-Jan-09 17-Feb-09 14-Mar-09 28-Mar-09
521-V-203
25 4103 IIND STAGE REBOILER COND DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-001
26 4104 ARU ACID GAS KO DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-002
27 4104 SWS I ACID GAS KO DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-003
28 4104 SWS II ACID GAS KO DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-004
29 4104 FUEL GAS KO DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-005
30 4104 WHB STEAM DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
525-V-005
31 4104 WHB STEAM DRUM FORECAST
ACTUAL
0.66% SCHEDULE
524-LZ-005
32 4104 FIRST SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
525-LZ-005
33 4104 FIRST SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
524-LZ-006
34 4104 SECOND SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
525-LZ-006
35 4104 SECOND SEAL LEG FORECAST
ACTUAL
4 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.66% SCHEDULE
524-LZ-007
36 4104 THIRD SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
525-LZ-007
37 4104 THIRD SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
524-LZ-008
38 4104 FOURTH SEAL LEG FORECAST
ACTUAL
0.66% SCHEDULE
525-LZ-008
39 4104 FOURTH SEAL LEG FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-201
40 4104 RICH MDEA DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-202
41 4104 REGENERATOR OVHD DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-203
42 4104 LP CONDENSATE DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-204
43 4104 MDEA SUMP DRUM FORECAST
ACTUAL
0.40% SCHEDULE 4-Apr-09 25-Apr-09 21-May-09 4-Jun-09
524-V-205
44 4104 MDEA PREPARARTION DRUM FORECAST
ACTUAL
0.83% SCHEDULE
524-LZ-001
45 4106 REACTION FRUNACE FORECAST
ACTUAL
0.83% SCHEDULE
525-LZ-001
46 4106 REACTION FRUNACE FORECAST
ACTUAL
5 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
524-R-101
47 4105 HYDROGENATION REACTOR FORECAST
ACTUAL
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
48 4105 525-R-101 HYDROGENATION REACTOR FORECAST
ACTUAL
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
524-R-001
49 4105 FIRST STAGE REACTOR FORECAST
ACTUAL
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
525-R-001
50 4105 FIRST STAGE REACTOR FORECAST
ACTUAL
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
524-R-002
51 4105 SECOND STAGE REACTOR FORECAST
ACTUAL
1.67% SCHEDULE 6-Mar-09 26-Mar-09 22-Apr-09 6-May-09
525-R-002
52 4105 SECOND STAGE REACTOR FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-101A/B
53 4201 RICH / LEAN AMINE EXCHANGERS FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-105A/B
54 4201 LEAN AMINE WATER COOLER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-103A/B
55 4201 AMINE REGERATOR-I REBOILER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-201A/B
56 4201 RICH / LEAN AMINE EXCHANGERS FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-205A/B
57 4201 LEAN AMINE WATER COOLER FORECAST
ACTUAL
6 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
522-E-203A/B
58 4201 AMINE REGERATOR-II REBOILER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
520-E101A/B SINGLE STAGE FEED / BOTTOM
59 4201
EXCHANGERS FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
520-E-102A/B
60 4201 SINGLE STAGE STRIPPER REBOILER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
520-E-104A/B SINGLE STAGE STRIPPED WATER
61 4201
COOLER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-201A/B
62 4201 IST STAGE FEED MIX COOLER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-202A/B IIND STAGE FEED / BOTTOM
63 4201
EXCHANGER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-203A/B IST STAGE FEED / BOTTOM
64 4201
EXCHANGER FORECAST
ACTUAL
0.64% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-204
65 4201 IST STAGE STRIPPER REBOILER FORECAST
ACTUAL
0.64% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-206
66 4201
IIND STAGE STRIPPER REBOILER FORECAST
ACTUAL
1.38% SCHEDULE 2-Mar-09 20-Mar-09 15-Apr-09 29-Apr-09
521-E-208A/B
67 4201 IIND STAGE TRIM WATER COOLER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-102
68 4202 HYDROGENATION COOLER FORECAST
ACTUAL
7 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
525-E-102
69 4202 HYDROGENATION COOLER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-002
70 4202 FIRST SULFUR CONDENSER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
525-E-002
71 4202 FIRST SULFUR CONDENSER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-004
72 4202 SECOND SULFUR CONDENSER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
525-E-004
73 4202
SECOND SULFUR CONDENSER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-006
74 4202 FINAL SULFUR CONDENSER FORECAST
ACTUAL
0.64% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
525-E-006
75 4202 FINAL SULFUR CONDENSER FORECAST
ACTUAL
1.38% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-201A/B
76 4205 RICH/LEAN MDEA EXCHANGERS FORECAST
ACTUAL
0.69% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-202
77 4202 LEAN MDEA TRIM COOLER FORECAST
ACTUAL
0.69% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
524-E-203
78 4202 MDEA REGENERATOR REBOILER FORECAST
ACTUAL
0.69% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
79 4206 524-E-001 WASTE HEAT REBOILER FORECAST
ACTUAL
8 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.69% SCHEDULE 1-May-09 20-May-09 15-Jun-09 29-Jun-09
80 4206 525-E-001 WASTE HEAT REBOILER FORECAST
ACTUAL
1.11% SCHEDULE 26-Jan-09 21-Feb-09 19-Mar-09 10-Apr-09
522-T-101
81 4301 AMINE TANK FORECAST
ACTUAL
1.11% SCHEDULE 26-Jan-09 21-Feb-09 19-Mar-09 10-Apr-09
520-T-101
82 4301 SOUR WATER STORAGE TANK-I FORECAST
ACTUAL
2.22% SCHEDULE 26-Jan-09 21-Feb-09 19-Mar-09 10-Apr-09
521-T-201A/B
83 4301 SOUR WATER STORAGE TANK-II FORECAST
ACTUAL
1.11% SCHEDULE 11-Mar-09 6-Apr-09 2-May-09 25-May-09
524-T-201
84 4301
MDEA STORAGE TANK FORECAST
ACTUAL
1.11% SCHEDULE
85 4302 524-T-001 DEGASSING & STORAGE PIT FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
AMINE REGENERATOR-I OVHD
86 4203 522-A-102
CONDENSER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
87 4203 522-A-104 LEAN AMINE AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
AMINE REGENERATOR-II OVHD
88 4203 522-A-202
CONDENSER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
89 4203 522-A-204 LEAN AMINE AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
90 4203 520-A-103 SINGLE STAGE PA AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
91 4203 521-A-205 IST STAGE STRIPPER PA AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 18-Dec-08 17-Jan-09 23-Feb-09 7-Mar-09
92 4203 521-A-207 IIND STAGE PA AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
93 4204 524-A-101 WATER AIR COOLER
9 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
93 4204 524-A-101 WATER AIR COOLER FORECAST
ACTUAL
10 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
94 4204 525-A-101 WATER AIR COOLER FORECAST
ACTUAL
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
95 4204 524-A-001 LP STEAM CONDENSER FORECAST
ACTUAL
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
96 4204 525-A-001 LP STEAM CONDENSER FORECAST
ACTUAL
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
97 4204 524-A-202 REGENERATOR OVERHEAD COOLER FORECAST
ACTUAL
0.69% SCHEDULE 10-Feb-09 12-Mar-09 17-Apr-09 1-May-09
98 4204 524-A-201 LEAN MDEA COOLER FORECAST
ACTUAL
0.70% SCHEDULE
99 4107 522-C-101 AMINE REGENERATOR-I FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
100 4107 522-C-201 AMINE REGENERATOR-II FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
SINGLE STAGE SOUR WATER
101 4107 520-C-101
STRIPPER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
102 4107 521-C-201 1STSTAGE SOUR WATER STRIPPER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
103 4107 521-C-202 2ND STAGE SOUR WATER STRIPPER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
104 4107 524-C-101 QUENCH TOWER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
105 4107 525-C-101 QUENCH TOWER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
106 4107 524-C-201 MDEA ABSORBER FORECAST
INTERNALS
ACTUAL
0.70% SCHEDULE
107 4107 525-C-201 MDEA ABSORBER
INTERNALS
11 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
107 4107 525-C-201 MDEA ABSORBER FORECAST
INTERNALS
ACTUAL
12 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
0.70% SCHEDULE
108 4107 524-C-202 MDEA REGENERATOR FORECAST
INTERNALS
ACTUAL
0.00% SCHEDULE
524-LZ-001/
109 4801
525-LZ-001
REACTION FURNACE FORECAST
ACTUAL
2.32% SCHEDULE 26-Mar-09 2-Apr-09 24-Apr-09 30-Apr-09
524-LZ-002/
110 4802
525-LZ-002
INCINERATOR PACKAGE FORECAST
ACTUAL
0.00% SCHEDULE
524-E-001/
111 4803
525-E-001
WASTE HEAT BOILER FORECAST
ACTUAL
13 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
I J K L M N
Discipline : Static STATUS AS OF : 20-Sep-08
TO BE CHANGED AS
ISSUE PO/PR TO UNPRICED PR
INFORMED ISSUE ENQUIRY RECEIVE BIDS EVALUATION RELEASE LOI
VENDOR TO OWNER
CAT WTG. %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION Wtd Value STATUS REMARKS
Bulk / N-Bulk PROGRESS PROGRESS
5% 25% 50% 10% 5% 5%
5% 30% 80% 90% 95% 100%
524-E-101/525- 3.84% SCHEDULE
E-101,
112 4804
524-E-003/525-
ELECTRIC HEATER FORECAST
E-003,
524-E-005/525-
E-005
ACTUAL
0.66% SCHEDULE
524-LZ-003/
113 4805
525-LZ-003
REACTION FURNACE BURNER FORECAST
ACTUAL
0.30% SCHEDULE
114 4806 ------ REFRACTORY FORECAST
ACTUAL
0.00% SCHEDULE
115 4807 524-T-001 PIT COILS FORECAST
ACTUAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
14 of 105
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
Discipline : Rotary
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
Discipline : Piping
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
Discipline : Electrical
Discipline : Electrical
Discipline : Electrical
Discipline : Electrical
ACTUAL
TOTAL
ORDERING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
Discipline : Instrumentation
Discipline : Instrumentation
Discipline : Instrumentation
TOTAL 100.00
LEGENDS :
25.00% 100%
Cumm. % Progress
Plan Cumm Actual Cumm
20.00% 80%
70%
Monthly % Progress
15.00% 60%
50%
10.00% 40%
30%
5.00% 20%
10%
0.00% 0%
Procurement Control Index
20-May-11
20-Aug-11
20-Nov-10
20-Nov-11
20-Dec-10
20-Sep-11
20-Dec-11
20-Feb-11
20-Jun-11
20-Feb-12
20-Mar-11
20-Mar-12
20-Jan-11
20-Apr-11
20-Jan-12
20-Oct-11
20-Jul-11
SR.
DISCIPLINE WTGS STATUS
NO.
10
11
12
13
14
15
16
17
1
9
51.82% Plan 0.00% 0.00% 0.67% 4.63% 10.60% 19.51% 30.82% 43.13% 52.22% 58.70% 68.18% 77.47% 84.87% 90.45% 93.96% 97.36% 100.00%
1 Civil Actual 0.00% 0.00% 0.12% 0.30% 4.54% 7.42% 18.00% 22.22% 26.44% 29.66% 29.68% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
15.93% Plan 0.00% 0.00% 0.00% 5.40% 15.21% 25.99% 36.84% 47.55% 56.67% 65.95% 75.63% 86.39% 96.32% 99.51% 99.51% 99.51% 99.51%
2 Structural Fabrication / Erection Actual 0.00% 0.00% 0.00% 0.00% 1.04% 3.65% 6.12% 8.21% 12.30% 16.12% 18.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
29.17% Plan 0.00% 0.00% 0.00% 1.83% 4.47% 8.73% 14.21% 22.78% 32.98% 44.26% 57.92% 72.41% 85.29% 95.71% 100.00% 100.00% 100.00%
3 Piping Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.40% 0.87% 1.68% 2.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
2.08% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.97% 3.38% 13.91% 33.04% 55.26% 80.39% 100.00% 100.00%
4 Electrical Works Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
1.00% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 4.14% 13.79% 27.59% 50.42% 79.39% 100.00% 100.00% 100.00%
5 Instrument Works Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
100.00% Plan Cumm 0.00% 0.00% 0.34% 3.80% 9.22% 16.80% 25.99% 36.57% 45.71% 53.90% 64.49% 75.60% 85.40% 92.59% 96.39% 98.55% 99.92%
Actual Cumm 0.00% 0.00% 0.06% 0.16% 2.52% 4.43% 10.37% 12.94% 15.91% 18.43% 19.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast Cumm 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TOTAL
Monthly Plan 0.00% 0.00% 0.34% 3.45% 5.42% 7.58% 9.19% 10.59% 9.14% 8.19% 10.58% 11.11% 9.80% 7.19% 3.80% 2.17% 1.37%
Monthly Actual 0.00% 0.00% 0.06% 0.09% 2.36% 1.91% 5.94% 2.57% 2.97% 2.52% 0.57% 0.00% 0.00% 0.00% 0.00% 0.00%
Monthly Forecast 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
100.00% SCHEDULE
0.00 FORECAST
0.00 SCHEDULE
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 9-May-09 22-Aug-09 15-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10 0.00
1 4101 522-C-101
AMINE REGENERATOR-I FORECAST
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 15-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10 0.00
2 4101 522-C-201
AMINE REGENERATOR-II FORECAST
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 15-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10 0.00
3 4101 520-C-101 SINGLE STAGE SOUR WATER FORECAST
STRIPPER
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 15-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10 0.00
4 4101 521-C-201
1STSTAGE SOUR WATER STRIPPER FORECAST
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 15-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10 0.00
5 4101 521-C-202
2ND STAGE SOUR WATER STRIPPER FORECAST
ACTUAL 0.00
SCHEDULE 29-Apr-09 12-Aug-09 6-Mar-10 18-Mar-10 2-Apr-10 3-May-10 0.00
6 4102 524-C-101
QUENCH TOWER FORECAST
ACTUAL 0.00
SCHEDULE 29-Apr-09 12-Aug-09 6-Mar-10 18-Mar-10 2-Apr-10 3-May-10 0.00
7 4102 525-C-101
QUENCH TOWER FORECAST
ACTUAL 0.00
SCHEDULE 29-Apr-09 12-Aug-09 6-Mar-10 18-Mar-10 2-Apr-10 3-May-10 0.00
8 4102 524-C-201
MDEA ABSORBER FORECAST
ACTUAL 0.00
SCHEDULE 29-Apr-09 12-Aug-09 6-Mar-10 18-Mar-10 2-Apr-10 3-May-10 0.00
9 4102 525-C-201
MDEA ABSORBER FORECAST
ACTUAL 0.00
SCHEDULE 29-Apr-09 12-Aug-09 6-Mar-10 18-Mar-10 2-Apr-10 3-May-10 0.00
10 4102 524-C-202
MDEA REGENERATOR FORECAST
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10 0.00
11 4103 522-V-101
RICH AMINE FLASH DRUM FORECAST .
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10 0.00
12 4103 522-V-102 AMINE REGENERATOR REFLUX DRUM- FORECAST
1
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10 0.00
13 4103 522-V-202 AMINE REGENERATOR REFLUX DRUM- FORECAST
II
ACTUAL 0.00
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10 30-Dec-99
14 4103 522-V-103 AMINE REGENERATOR-I REBOILER FORECAST 30-Dec-99
CONDENSATE POT
ACTUAL 30-Dec-99
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
15 4103 522-V-203 AMINE REGENERATOR-II REBOILER FORECAST
CONDENSATE POT
ACTUAL
61 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
16 4103 522-V-105
AMINE SUMP DRUM FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
17 4103 522-V-104
HYDROCARBON SKIM OFF VESSEL-I FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
18 4103 522-V-204
HYDROCARBON SKIM OFF VESSEL-II FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
19 4103 522-V-108
ACID FLARE KNOCKOUT DRUM FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
20 4103 520-V-101 SOUR WATER SURGE DRUM-1 FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
520-V-102 SINGLE STAGE STRIPPER REBOILER
21 4103
COND DRUM FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
520-V-103
22 4103 SOUR WATER BLOW DOWN DRUM FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
521-V-201
23 4103 SOUR WATER SURGE DRUM-II FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
521-V-202 IST STAGE REBOILER CONDENSATE
24 4103
DRUM FORECAST
ACTUAL
SCHEDULE 9-May-09 22-Aug-09 13-Jan-10 28-Jan-10 12-Feb-10 15-Mar-10
521-V-203
25 4103 IIND STAGE REBOILER COND DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-001
26 4104 ARU ACID GAS KO DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-002
27 4104 SWS I ACID GAS KO DRUM FORECAST
ACTUAL
62 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-003
28 4104 SWS II ACID GAS KO DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-004
29 4104 FUEL GAS KO DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-005
30 4104 WHB STEAM DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
525-V-005
31 4104 WHB STEAM DRUM FORECAST
ACTUAL
SCHEDULE
524-LZ-005
32 4104 FIRST SEAL LEG FORECAST
ACTUAL
SCHEDULE
525-LZ-005
33 4104 FIRST SEAL LEG FORECAST
ACTUAL
SCHEDULE
524-LZ-006
34 4104 SECOND SEAL LEG FORECAST
ACTUAL
SCHEDULE
525-LZ-006
35 4104 SECOND SEAL LEG FORECAST
ACTUAL
SCHEDULE
524-LZ-007
36 4104 THIRD SEAL LEG FORECAST
ACTUAL
SCHEDULE
525-LZ-007
37 4104 THIRD SEAL LEG FORECAST
ACTUAL
SCHEDULE
524-LZ-008
38 4104 FOURTH SEAL LEG FORECAST
ACTUAL
SCHEDULE
525-LZ-008
39 4104 FOURTH SEAL LEG FORECAST
ACTUAL
63 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-201
40 4104 RICH MDEA DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-202
41 4104 REGENERATOR OVHD DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-203
42 4104 LP CONDENSATE DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-204
43 4104 MDEA SUMP DRUM FORECAST
ACTUAL
SCHEDULE 4-Jun-09 18-Sep-09 27-Feb-10 15-Mar-10 30-Mar-10 30-Apr-10
524-V-205
44 4104 MDEA PREPARARTION DRUM FORECAST
ACTUAL
SCHEDULE
524-LZ-001
45 4106 REACTION FRUNACE FORECAST
ACTUAL
SCHEDULE
525-LZ-001
46 4106 REACTION FRUNACE FORECAST
ACTUAL
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
524-R-101
47 4105 HYDROGENATION REACTOR FORECAST
ACTUAL
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
48 4105 525-R-101 HYDROGENATION REACTOR FORECAST
ACTUAL
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
524-R-001
49 4105 FIRST STAGE REACTOR FORECAST
ACTUAL
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
525-R-001
50 4105 FIRST STAGE REACTOR FORECAST
ACTUAL
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
524-R-002
51 4105 SECOND STAGE REACTOR FORECAST
ACTUAL
64 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 6-May-09 20-Aug-09 18-Jun-10 4-Jul-10 19-Jul-10 19-Aug-10
525-R-002
52 4105 SECOND STAGE REACTOR FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-101A/B
53 4201 RICH / LEAN AMINE EXCHANGERS FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-105A/B
54 4201 LEAN AMINE WATER COOLER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-103A/B
55 4201 AMINE REGERATOR-I REBOILER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-201A/B
56 4201 RICH / LEAN AMINE EXCHANGERS FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-205A/B
57 4201 LEAN AMINE WATER COOLER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
522-E-203A/B
58 4201 AMINE REGERATOR-II REBOILER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
520-E101A/B SINGLE STAGE FEED / BOTTOM
59 4201
EXCHANGERS FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
520-E-102A/B
60 4201 SINGLE STAGE STRIPPER REBOILER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
520-E-104A/B SINGLE STAGE STRIPPED WATER
61 4201
COOLER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-201A/B
62 4201 IST STAGE FEED MIX COOLER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-202A/B IIND STAGE FEED / BOTTOM
63 4201
EXCHANGER FORECAST
ACTUAL
65 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-203A/B IST STAGE FEED / BOTTOM
64 4201
EXCHANGER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-204
65 4201 IST STAGE STRIPPER REBOILER FORECAST
ACTUAL
SCHEDULE 23-May-09 22-Aug-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-206
66 4201
IIND STAGE STRIPPER REBOILER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 30-Dec-09 11-Jan-10 26-Jan-10 26-Feb-10
521-E-208A/B
67 4201 IIND STAGE TRIM WATER COOLER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-102
68 4202 HYDROGENATION COOLER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
525-E-102
69 4202 HYDROGENATION COOLER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-002
70 4202 FIRST SULFUR CONDENSER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
525-E-002
71 4202 FIRST SULFUR CONDENSER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-004
72 4202 SECOND SULFUR CONDENSER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
525-E-004
73 4202
SECOND SULFUR CONDENSER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-006
74 4202 FINAL SULFUR CONDENSER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
525-E-006
75 4202 FINAL SULFUR CONDENSER FORECAST
ACTUAL
66 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-201A/B
76 4205 RICH/LEAN MDEA EXCHANGERS FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-202
77 4202 LEAN MDEA TRIM COOLER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
524-E-203
78 4202 MDEA REGENERATOR REBOILER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
79 4206 524-E-001 WEST HEAT REBOILER FORECAST
ACTUAL
SCHEDULE 29-Jun-09 29-Sep-09 1-Mar-10 12-Mar-10 27-Mar-10 27-Apr-10
80 4206 525-E-001 WEST HEAT REBOILER FORECAST
ACTUAL
SCHEDULE 10-Apr-09 21-Aug-09 21-Oct-09 9-Nov-09 24-Nov-09 25-Dec-09
522-T-101
81 4301 AMINE TANK FORECAST
ACTUAL
SCHEDULE 10-Apr-09 21-Aug-09 21-Oct-09 9-Nov-09 24-Nov-09 25-Dec-09
520-T-101
82 4301 SOUR WATER STORAGE TANK-I FORECAST
ACTUAL
SCHEDULE 10-Apr-09 21-Aug-09 21-Oct-09 9-Nov-09 24-Nov-09 25-Dec-09
521-T-201A/B
83 4301 SOUR WATER STORAGE TANK-II FORECAST
ACTUAL
SCHEDULE 25-May-09 3-Oct-09 12-Feb-10 4-Mar-10 19-Mar-10 19-Apr-10
524-T-201
84 4301
MDEA STORAGE TANK FORECAST
ACTUAL
SCHEDULE
85 4302 524-T-001 DEGASSING & STORAGE PIT FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
AMINE REGENERATOR-I OVHD
86 4203 522-A-102
CONDENSER FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
87 4203 522-A-104 LEAN AMINE AIR COOLER FORECAST
ACTUAL
67 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
AMINE REGENERATOR-II OVHD
88 4203 522-A-202
CONDENSER FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
89 4203 522-A-204 LEAN AMINE AIR COOLER FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
90 4203 520-A-103 SINGLE STAGE PA AIR COOLER FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
91 4203 521-A-205 IST STAGE STRIPPER PA AIR COOLER FORECAST
ACTUAL
SCHEDULE 4-Jun-09 22-Aug-09 16-Jan-10 27-Jan-10 11-Feb-10 14-Mar-10
92 4203 521-A-207 IIND STAGE PA AIR COOLER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 24-Mar-10 8-Apr-10 9-May-10
93 4204 524-A-101 WATER AIR COOLER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 24-Mar-10 8-Apr-10 9-May-10
94 4204 525-A-101 WATER AIR COOLER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 27-Jan-10 11-Feb-10 14-Mar-10
95 4204 524-A-001 LP STEAM CONDENSER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 24-Mar-10 8-Apr-10 9-May-10
96 4204 525-A-001 LP STEAM CONDENSER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 24-Mar-10 8-Apr-10 9-May-10
97 4204 524-A-202 REGENERATOR OVERHEAD COOLER FORECAST
ACTUAL
SCHEDULE 25-May-09 12-Aug-09 12-Mar-10 24-Mar-10 8-Apr-10 9-May-10
98 4204 524-A-201 LEAN MDEA COOLER FORECAST
ACTUAL
SCHEDULE
99 4107 522-C-101 AMINE REGENERATOR-I FORECAST
INTERNALS
ACTUAL
68 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT
5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
PROGRESS PROGRESS
BULK BULK MATERIALS
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
60% 10% 20% 10%
60% 70% 90% 100%
SCHEDULE
100 4107 522-C-201 AMINE REGENERATOR-II FORECAST
INTERNALS
ACTUAL
SCHEDULE
SINGLE STAGE SOUR WATER
101 4107 520-C-101
STRIPPER FORECAST
INTERNALS
ACTUAL
SCHEDULE
102 4107 521-C-201 1STSTAGE SOUR WATER STRIPPER FORECAST
INTERNALS
ACTUAL
SCHEDULE
103 4107 521-C-202 2ND STAGE SOUR WATER STRIPPER FORECAST
INTERNALS
ACTUAL
SCHEDULE
104 4107 524-C-101 QUENCH TOWER FORECAST
INTERNALS
ACTUAL
SCHEDULE
105 4107 525-C-101 QUENCH TOWER FORECAST
INTERNALS
ACTUAL
SCHEDULE
106 4107 524-C-201 MDEA ABSORBER FORECAST
INTERNALS
ACTUAL
SCHEDULE
107 4107 525-C-201 MDEA ABSORBER FORECAST
INTERNALS
ACTUAL
SCHEDULE
108 4107 524-C-202 MDEA REGENERATOR FORECAST
INTERNALS
ACTUAL
SCHEDULE
109 GENERAL CO-ORDINATION FORECAST
ACTUAL
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
69 of 105
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
SCHEDULE 0.00
PIPE, CARBON STEEL ,
1 AYHA101A PIPE FORECAST
SEAMLESS - 1ST ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, CARBON STEEL ,
2 AYHA101B PIPE FORECAST
SEAMLESS - 2ND ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, CARBON STEEL ,
3 AYHA101C PIPE FORECAST
SEAMLESS - 3RD ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, CARBON STEEL , WELDED
4 AYHA102A PIPE FORECAST
- 1ST ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE , CARBON STEEL ,
5 AYHA102B PIPE FORECAST
WELDED - 2ND ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, CARBON STEEL , WELDED
6 AYHA102C PIPE FORECAST
- 3RD ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
7 AYHA201A PIPE FORECAST
( SMLS ) -1ST ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
8 AYHA201B PIPE FORECAST
( SMLS ) -2ND ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
9 AYHA201C PIPE FORECAST
( SMLS ) -3RD ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
10 AYHA202A PIPE FORECAST
( WELDED ) -1ST ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
11 AYHA202B PIPE FORECAST
( WELDED ) -2ND ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, STAINLESS STEEL
12 AYHA202C PIPE FORECAST
( WELDED ) -3RD ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, ALLOY STEEL (SMLS) -1ST
13 AYHA301A PIPE FORECAST
ORDER
ACTUAL 0.00
SCHEDULE 0.00
PIPE, ALLOY STEEL (SMLS)
14 AYHA301B PIPE
-2ND ORDER
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG.
%
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS PROGRES REMARKS
BULK MATERIALS PROGRESS
BULK S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
TOTAL
LEGENDS :
MR : Material Requisition
TBE : Technical Bid Evaluation
PR : Purchase Requisition
MANUFACTURING CONTROL INDEX
PROJECT NAME :
PMC : TOYO Engineering India Ltd.
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
5% 5% 5% 25% 40% 5% 5% 5% 5%
ACTUAL
CAT 5% 10% 15% 40% 80% 85% 90% 95% 100% WTG. ACTUAL %
SR. NO REQUISITION NO. ITEM NO. ITEM DESCRIPTION BULK/ NON- Wtd (%) STATUS REMARKS
BULK MATERIALS PROGRES PROGRESS
BULK
S
FINAL
FABRICATION &
DISPTACH RECEIPT AT SITE DOCUMENTATIO
TESTING
N
LEGENDS :
1-Aug-16
1-May-17
1-Nov-16
1-Dec-16
1-Sep-16
1-Feb-16
1-Mar-16
1-Jun-16
1-Feb-17
1-Mar-17
1-Jan-16
1-Apr-16
1-Jan-17
1-Apr-17
1-Oct-16
1-Jul-16
SL
DISCIPLINE WTGS STATUS
NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100.00% Plan 0.00% 0.00% 0.34% 3.80% 9.22% 16.80% 25.99% 36.57% 45.71% 53.90% 64.49% 75.60% 85.40% 92.59% 96.39% 98.55% 99.92%
1 Construction Actual 0.00% 0.00% 0.06% 0.16% 2.52% 4.43% 10.37% 12.94% 15.91% 18.43% 19.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Forecast
J
100.00% O
Plan Cumm 0.00% 0.00% 0.34% 3.80% 9.22% 16.80% 25.99% 36.57% 45.71% 53.90% 64.49% 75.60% 85.40% 92.59% 96.39% 98.55% 99.92%
B
Actual Cumm 0.00% 0.00% 0.06% 0.16% 2.52% 4.43% 10.37% 12.94% 15.91% 18.43% 19.00%
N
O
OVERALL CONSTRUCTION .Forecast Cumm 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS 6Monthly Plan 0.00% 0.00% 0.34% 3.45% 5.42% 7.58% 9.19% 10.59% 9.14% 8.19% 10.58% 11.11% 9.80% 7.19% 3.80% 2.17% 1.37%
1
2
8
Monthly Actual 0.00% 0.00% 0.06% 0.09% 2.36% 1.91% 5.94% 2.57% 2.97% 2.52% 0.57%
Monthly Forecast 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42370 42856
SNO ACTIVITY UOM SCOPE WTG Man Hour / TOTAL MAN Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12
Unit HOURS TO BE
SPENT/EARN
ED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 TPI MT 45,000 3.96% 9.0 405000 Cum Plan 0 0 0 4,524 9,881 14,964 20,310 25,131 28,702 32,869 37,036 41,798 45,000 45,000 45,000 45,000 45,000
Plan % 0.00% 0.00% 10.05% 21.96% 33.25% 45.13% 55.85% 63.78% 73.04% 82.30% 92.88% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 4,000 7,260 9,260 10,675 12,692 31,704 31,704
Actual % 0.00% 0.00% 0.00% 0.00% 8.89% 16.13% 20.58% 23.72% 28.20% 70.45% 70.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Cutting & Marking MT 45,000 15.86% 36.0 1620000 Cum Plan 0 0 0 4,524 9,881 14,964 20,310 25,131 28,702 32,869 37,036 41,798 45,000 45,000 45,000 45,000 45,000
Plan % 0.00% 0.00% 10.05% 21.96% 33.25% 45.13% 55.85% 63.78% 73.04% 82.30% 92.88% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 1,287 3,103 4,900 6,458 9,658 10,928 13,726
Actual % 0.00% 0.00% 0.00% 0.00% 2.86% 6.90% 10.89% 14.35% 21.46% 24.28% 30.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Fit Up MT 45,000 15.86% 36 1620000 Cum Plan 0 0 0 4,524 9,881 14,964 20,310 25,131 28,702 32,869 37,036 41,798 45,000 45,000 45,000 45,000 45,000
Plan % 0.00% 0.00% 10.05% 21.96% 33.25% 45.13% 55.85% 63.78% 73.04% 82.30% 92.88% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 468 2,657 4,738 6,271 9,771 10,934 12,128
Actual % 0.00% 0.00% 0.00% 0.00% 1.04% 5.90% 10.53% 13.94% 21.71% 24.30% 26.95%
4 Welding /Fabrication MT 45,000 15.86% 36 1620000 Cum Plan 0 0 0 4,524 9,881 14,964 20,310 25,131 28,702 32,869 37,036 41,798 45,000 45,000 45,000 45,000 45,000
Plan % 0.00% 0.00% 10.05% 21.96% 33.25% 45.13% 55.85% 63.78% 73.04% 82.30% 92.88% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 198 2,487 4,538 6,271 7,885 9,380 11,366
Actual % 0.00% 0.00% 0.00% 0.00% 0.44% 5.53% 10.08% 13.94% 17.52% 20.84% 25.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Grit Blasting / Primer App MT 45,000 8.81% 20 900000 Cum Plan 0 0 0 1,143 5,310 10,071 13,643 19,060 23,821 27,988 32,512 37,274 42,571 45,000 45,000 45,000 45,000
Plan % 0.00% 0.00% 2.54% 11.80% 22.38% 30.32% 42.35% 52.94% 62.20% 72.25% 82.83% 94.60% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 0 388 1,246 2,107 4,475 5,383 5,462
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.86% 2.77% 4.68% 9.94% 11.96% 12.14%
6 Erection MT 43,300 33.90% 80 3464000 Cum Plan 0 0 0 0 3,358 8,156 12,954 17,824 22,634 26,940 31,617 35,875 41,153 43,300 43,300 43,300 43,300
Plan % 0.00% 0.00% 0.00% 7.76% 18.84% 29.92% 41.16% 52.27% 62.22% 73.02% 82.85% 95.04% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 0 0 45 115 563 1,151 1,629
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.10% 0.27% 1.30% 2.66% 3.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Grating / handrails Erection MT 1,700 2.16% 130 221000 Cum Plan 0 0 0 0 0 0 0 0 0 0 0 500 1,065 1,700 1,700 1,700 1,700
Plan % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 29.41% 62.65% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 0 0 0 0 0 0 0
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Painting MT 45,000 3.08% 7 315000 Cum Plan 0 0 0 0 3,300 7,300 11,300 15,880 20,380 24,280 28,180 32,280 36,280 37,800 37,800 37,800 37,800
Plan % 0.00% 0.00% 0.00% 7.33% 16.22% 25.11% 35.29% 45.29% 53.96% 62.62% 71.73% 80.62% 84.00% 84.00% 84.00% 84.00%
Cum Actual 0 0 0 0 0 388 388 1,088 3,456 5,383 5,383
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.86% 0.86% 2.42% 7.68% 11.96% 11.96% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Fire Proofing SQM 298 0.29% 100 29750 Cum Plan 0 0 0 0 0 0 0 0 0 0 50 125 200 298 298 298 298
Plan % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16.81% 42.02% 67.23% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 0 0 0 0 0 0 0
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Roof Sheeting SQM 4,500 0.22% 5 22500 Cum Plan 0 0 0 0 0 0 0 0 500 1,500 2,500 3,500 4,000 4,500 4,500 4,500 4,500
Plan % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 11.11% 33.33% 55.56% 77.78% 88.89% 100.00% 100.00% 100.00% 100.00%
Cum Actual 0 0 0 0 0 0 0 0 0 0 0
Actual % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
OVERALL STRUCTURAL 10217250 % Plan Cum 0% 0% 0% 5% 15% 26% 37% 48% 57% 66% 76% 86% 96% 100% 100% 100% 100%
% Actual Cum 0% 0% 0% 0% 1% 4% 6% 8% 12% 16% 19% 0% 0% 0% 0% 0% 0%
Monthly Plan 0% 0% 0% 5% 10% 11% 11% 11% 9% 9% 10% 11% 10% 3% 0% 0% 0%
Monthly Actual 0% 0% 0% 0% 1% 3% 2% 2% 4% 4% 2% -19% 0% 0% 0% 0% 0%