Sei sulla pagina 1di 3

Requirement of Compact 200 Bridge ( 40 Meters Span ) with MLC 80

Project
Highways , forestry, Disaster & Emergency Department
Potential Client
Date 11 Mar 2020

Commercial Review:

1. Background to the enquiry, how it was identified and how it has developed:

There is a potential need of having steel structure bridges in many sites of Pakistan. We
want to introduce your system with all out support already available through your local
representation of JAFFAR BROTHERS. We send a query as it was not know that you
have local support available through your website. Your local staff followed and briefed us
about your company and way of working in an excellent manner. We look forward to work
and extend our cooperation in future as well.

2. 2. Scope of works:
Installation, Maintenance, Inspection of already held stock and training support. Future
collaboration with Mabey in procurement of Mabey product and efforts to look forward for
opportunity of joint collaboration in bridging systems

3. 3. When is the quotation required?


4. As soon as Possible

5. Programme

Bridge installation at various site if it becomes a cost effective option in prevailing Chinese
competitors

6. 5. What is the ‘effective’ date for the order estimated to be?


After detailed study of your proposal

7. Likely route to order (e.g. tender / negotiated):

Tender

8. Delivery (e.g. destination port, CIF?, inland location DDU / DDP?, shippers-owned or liner
containers)

Islamabad / Karachi

Page 1 of 3
9. Terms and Conditions of Sale: F.O.R (Local Currency Basis)

FOR

10. Details of the Competition, is there any preference for MBL:

Yes , Chinese Bridging Companies and Local developer

Technical Review:

Total Bridge Length, Bridge type if any:

Span Arrangement (e.g. single span, multiple spans acceptable, any restrictions (must have a
central span of x metres):

Roadwidth:

11. Footwalks required? One, two? Internal or external? Width (1.0m / 1.5m)?

Two external 1.0 Meter

12. Loading (e.g. HA, HS25, Logging Truck, CAT Dump Truck – any special vehicles?):

MLC 80

13. Anticipated design life (e.g. 1, 5, 20, 60 years etc.):

60 yrs

Page 2 of 3
14. Number of heavy vehicles per day (e.g. > 30t or > 40t or the CAT Vehicle):

Above 80 Tons about 200 vehicles per day

Installation method (cantilever launched, craned in, etc.):

Cantilever launched / craned methods depending on site situation and terrain


Site advice required?
Yes

Page 3 of 3

Potrebbero piacerti anche