A-2 Prepare plastered surface of all internal faces of m2 210.13 245.00 51481.85
wall & Soffit apply one coat of primer and two
coats of emulsion paint of approved colour
A-3 Prepare plastered surface of all external faces of m2 223.76 283.00 63324.08
wall apply one coat of primer and two coat of
wither shield paint of approved colour.
A-4 Prepare surface and paint door, fanlight, m2 144.56 345.00 49873.20
window with vanishing with polyurethane
varnish matt after washing down and sand
preparing in 2 coat .
Total carried to Summary 184679.13
B – CEILING WORK
B-1 Supply and fixing internal ceiling out of 4'x 4' m2 130.87 3742.00 489715.54
asbestos sheets with 2''x 2'' and 2''x 4'' class 2
treaded timber member (including other item)
Total Carried to summery 489715.54
SUMMARY
Ground Floor
.................................................