TOWER 1 - UP TO PAINTING WORKS TOWER 2 - UP TO PAINTING WORKS

FLOOR
RAILINGS THREAD NOSING ZOCALO MASONRY WORKS (over all) RAILINGS THREAD NOSING ZOCALO MASONRY WORKS (over all)

1 2 3 1 2 3 1 2 3 1 2 3 1 2 1 2 1 2 1 2
12th 92% , 2-22-2020 85% , 3/1/2020 85% , 3/12/2020 90% , 2/22/2020 80% , 3/2/2020 80% , 3/17/2020 2/28/2020 80% , 3/7/2020 3/19/2020 2/28/2020 3/8/2020 3/22/2020 50% , 2/29/2020 50% , 2/25/2020 50% , 2/25/2020 3/3/2020 3/2/2020 3/15/2020 3/7/2020 3/21/2020
11th 92% , 2-22-2020 85% , 3/1/2020 85% , 3/12/2020 90% , 2-22-2020 80% , 3/2/2020 80% , 3/17/2020 2/28/2020 80% , 3/7/2020 3/19/2020 80% , 2-23-2020 3/9/2020 3/23/2020 50%, 2/28/2020 50% , 2/26/2020 50% , 2/25/2020 3/3/2020 2/29/2020 3/15/2020 3/7/2020 3/16/2020
10th 92% , 2-22-2020 85% , 3/2/2020 85% , 3/13/2020 90% , 2-22-2020 80% , 3/2/2020 80% , 3/18/2020 2/27/2020 80% , 3/6/2020 3/19/2020 80% , 2-23-2020 3/9/2020 3/23/2020 50% , 2/27/2020 50% , 2/26/2020 50% , 2/26/2020 3/4/2020 2/29/2020 3/14/2020 3/6/2020 3/16/2020
9th 92% , 2-22-2020 85% , 3/2/2020 85% , 3/13/2020 90% , 2-22-2020 80% , 3/3/2020 80% , 3/18/2020 2/27/2020 80% , 3/6/2020 3/20/2020 80% , 2-23-2020 3/10/2020 3/24/2020 50% , 2/27/2020 50% , 2/27/2020 50% , 2/26/2020 3/4/2020 2/28/2020 3/14/2020 3/6/2020 3/17/2020
8th 92% , 2-23-2020 85% , 3/2/2020 85% , 3/13/2020 90% , 2-23-2020 80% , 3/3/2020 80% , 3/19/2020 80% , 2-24-2020 80% , 3/5/2020 3/20/2020 80% , 2-23-2020 3/10/2020 3/24/2020 50% , 2/26/2020 50% , 2/27/2020 50% , 2/27/2020 3/5/2020 2/28/2020 3/13/2020 3/5/2020 3/17/2020
7th 92% , 2-23-2020 85% , 3/3/2020 85% , 3/14/2020 90% , 2-23-2020 80% , 3/3/2020 80% , 3/19/2020 80% , 2-24-2020 80% , 3/5/2020 3/20/2020 80% , 2-24-2020 3/11/2020 3/25/2020 50% , 2/26/2020 50% , 2/28/2020 50% , 2/27/2020 3/5/2020 2/27/2020 3/13/2020 3/5/2020 3/18/2020
6th 92% , 2-23-2020 85% , 3/3/2020 85% , 3/14/2020 90% , 2-23-2020 80% , 3/3/2020 80% , 3/20/2020 80% , 2-24-2020 80% , 3/4/2020 3/21/2020 80% , 2-24-2020 3/11/2020 3/25/2020 50% , 2/25/2020 50% , 2/28/2020 50% , 2/28/2020 3/6/2020 2/27/2020 3/12/2020 3/5/2020 3/18/2020
5th 92% , 2-23-2020 85% , 3/3/2020 85% , 3/14/2020 90% , 2-23-2020 80% , 3/4/2020 80% , 3/20/2020 80% , 2-24-2020 80% , 3/4/2020 3/21/2020 80% , 2-24-2020 3/12/2020 3/26/2020 50% , 2/25/2020 50% , 2/29/2020 50% , 2/28/2020 3/6/2020 2/26/2020 3/12/2020 3/4/2020 3/19/2020
4th 92% , 2-24-2020 85% , 3/4/2020 85% , 3/15/2020 90% , 2-24-2020 80% , 3/4/2020 80% , 3/21/2020 80% , 2-25-2020 80% , 3/4/2020 3/21/2020 80% , 2-24-2020 3/12/2020 3/26/2020 50% , 2/24/2020 50% , 2/29/2020 50% , 2/29/2020 3/7/2020 2/26/2020 3/11/2020 3/4/2020 3/19/2020
3rd 92% , 2-24-2020 85% , 3/4/2020 85% , 3/15/2020 90% , 2-24-2020 80% , 3/4/2020 80% , 3/21/2020 80% , 2-25-2020 80% , 3/3/2020 3/22/2020 80% , 2-24-2020 3/12/2020 3/27/2020 50% , 2/24/2020 50% , 3/1/2020 50%, 2/29/2020 3/7/2020 2/25/2020 3/11/2020 3/4/2020 3/20/2020
2nd 92% , 2-24-2020 85% , 3/4/2020 85% , 3/16/2020 90% , 2-24-2020 80% , 3/4/2020 80% , 3/21/2020 80% , 2-25-2020 80% , 3/3/2020 3/22/2020 80% , 2-25-2020 3/13/2020 3/27/2020 50% , 2/23/2020 50% , 3/1/2020 50% , 3/1/2020 3/8/2020 2/25/2020 3/10/2020 3/3/2020 3/20/2020
Upper Gnd 92% , 2-25-2020 85% , 3/4/2020 85% , 3/16/2020 90% , 2-25-2020 80% , 3/5/2020 80% , 3/22/2020 80% , 2-25-2020 80% , 3/3/2020 3/23/2020 80% , 2-25-2020 3/13/2020 3/28/2020 50% , 2/23/2020 50% , 3/2/2020 50% , 3/1/2020 3/8/2020 2/24/2020 3/10/2020 3/3/2020 3/20/2020
Lower Gnd 2/22/2020 3/5/2020 3/17/2020 90% , 2-25-2020 80% , 3/5/2020 80% , 3/22/2020 2/29/2020 3/9/2020 3/23/2020 2/29/2020 3/14/2020 3/28/2020 50% , 2/29/2020 3/21/2020 50% , 3/2/2020 3/21/2020 2/24/2020 3/9/2020 3/3/2020 3/21/2020

LEGEND
Ready

On-Going

Not Ready

PREPARED BY: CONFORME BY:


PROMPT MANAGERS & CONSTRUCTION SERVICE INC. VISION PROPERTIES CORP.
legend:

balance
ongoing rectify masonry
ongoing rectify painting
done

fe1 - t1 wall ceiling


upper lower side stair inner upper lower
floors rc wall
zocalo zocalo precast zocalo stair stair
12th floor
11th floor
10th floor
9th floor
8th floor
7th floor
6th floor
5th floor
4th floor
3rd floor
2nd floor
u.g. floor
l.g. floor

fe2 - t1 wall ceiling


upper lower side stair inner upper lower
floors rc wall
zocalo zocalo precast zocalo stair stair
water tank
12th floor
11th floor
10th floor
9th floor
8th floor
7th floor
6th floor
5th floor
4th floor
3rd floor
2nd floor
u.g. floor
l.g. floor
fe3 - t1 wall ceiling
upper lower side stair inner upper lower
floors rc wall
zocalo zocalo precast zocalo stair stair
12th floor
11th floor
10th floor
9th floor
8th floor
7th floor
6th floor
5th floor
4th floor
3rd floor
2nd floor
u.g. floor
l.g. floor
ceiling flooring railings
upper lower upper lower upper lower inner stair upper lower
landing landing steps steps landing landing railings nosing railings railings

ceiling flooring railings


upper lower upper lower upper lower inner stair upper lower
landing landing steps steps landing landing railings nosing railings railings
ceiling flooring railings
upper lower upper lower upper lower inner stair upper lower
landing landing steps steps landing landing railings nosing railings railings
side
railings

side
railings
side
railings
20-Feb-20
PHASE 1 FIRE SPRINKLER SYSTEM STATUS

TOWER 1 TOWER 2

TERMINATI
FLOOR TERMINATI
SUPERVISO FLOW PRESSURE AUX. OS & Y ON OF AFSS SUPERVISO FLOW PRESSURE AUX. OS & Y ON OF
AFSS TO
RY SWITCH SWITCH GAUGE DRAIN VALVE TO FDAS RY SWITCH SWITCH GAUGE DRAIN VALVE
FDAS
(FLUX)
(FLUX)

12th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 4-Mar-20
11th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
10th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
9th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
8th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
7th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
6th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
5th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
4th 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
3rd 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
2nd 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Upper Gnd 2-Mar-20 100.00% 100.00% 100.00% 100.00% 24-Feb-20 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Lower Gnd 2-Mar-20 2-Mar-20 2-Mar-20 100.00% 100.00% 2-Mar-20 2-Mar-20 2-Mar-20 2-Mar-20 100.00% N/A

CONFORME BY:
LEGEND
Ready

On-Going FLUX WEBER CORP.

Not Ready

PREPARED BY:
PROMPT MANAGERS & CONSTRUCTION SERVICE INC.
SKYNET CONSTRUCTION AND ENG'G SERVICES
legend:

ongoing rectify masonry


ongoing rectify painting
done

fe1 - t2 wall ceiling


upper lower side stair inner upper lower
floors rc wall
zocalo zocalo precast zocalo stair stair
12th floor
11th floor
10th floor
9th floor
8th floor
7th floor
6th floor
5th floor
4th floor
3rd floor
2nd floor
u.g. floor
l.g. floor

fe2 - t2 wall ceiling


upper lower side stair inner upper lower
floors rc wall
zocalo zocalo precast zocalo stair stair
water tank
12th floor
11th floor
10th floor
9th floor
8th floor
7th floor
6th floor
5th floor
4th floor
3rd floor
2nd floor
u.g. floor
l.g. floor
ceiling flooring railings
upper lower upper lower upper lower inner stair upper lower
landing landing steps steps landing landing railings nosing railings railings

ceiling flooring railings


upper lower upper lower upper lower inner stair upper lower
landing landing steps steps landing landing railings nosing railings railings
side
railings

side
railings