RAW DATA
Constructability
Economic Constraint
Design Constraint (Duration in
(Cost)
days)
Reinforced Concrete
Design - (Normal 108127800 420
Weight Concrete)
2. Normalized data
Constructability
Economic Constraint
Design Constraint (Duration in
(Cost)
days)
Reinforced Concrete
Design - (Normal #VALUE! #VALUE!
Weight Concrete)
Design 1 (PC1)
Nomalization
((900000-900000)/(900000-700000))*(9)+1 =
Table 3
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Weight
Concrete)
Economic Constraint
0.4 7.98
(Cost)
Constructability
0.3 1
Constraint (Duration)
Sustainability
0.2 1
Constraint ( Life Span)
Risk Assessment
Constraint (Lateral 0.1 7.64
Displacement)
Weighted Sum 4.456
Table 4
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Weight
Concrete)
Economic Constraint
0.38 7.98
(Cost)
Constructability
0.28 1
Constraint (Duration)
Sustainability
0.22 1
Constraint ( Life Span)
Risk Assessment
Constraint (Lateral 0.12 7.64
Displacement)
Weighted Sum 4.4492
Table 5
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Weight
Concrete)
Economic Constraint
0.35 7.98
(Cost)
Constructability
0.15 1
Constraint (Duration)
Sustainability
0.38 1
Constraint ( Life Span)
Risk Assessment
Constraint (Lateral 0.12 7.64
Displacement)
Weighted Sum 4.2398
Stuctural Context
Risk Assessment
Sustainability Constraint
Constraint (Lateral Design
( Life Span)
Displacement)
Reinforced Concrete
50 76 Design - (Normal
Weight Concrete)
47 65 Structural Steel
Combined Steel
Eccentrically Brace
Frame and Steel
Moment Resisting
Frame
Risk Assessment
Sustainability Constraint
Constraint (Lateral Design
( Life Span)
Displacement)
Reinforced Concrete
#VALUE! #VALUE! Design - (Normal
Weight Concrete)
Design 1 (PC1)
Nomalization
((900000-900000)/(900000-700000))*(9)+1 =
Table 3
Combined Steel
Eccentrically Brace
Structural Steel Project Constraint
Frame and Steel Moment
Resisting Frame
Economic Constraint
1
(Cost)
Constructability
10
Constraint (Duration)
Sustainability
10
Constraint ( Life Span)
Risk Assessment
10 Constraint (Lateral
Displacement)
6.4 #VALUE! Weighted Sum
Table 4
Combined Steel
Eccentrically Brace
Structural Steel Project Constraint
Frame and Steel Moment
Resisting Frame
Economic Constraint
1
(Cost)
Constructability
10
Constraint (Duration)
Sustainability
10
Constraint ( Life Span)
Risk Assessment
10 Constraint (Lateral
Displacement)
6.58 #VALUE! Weighted Sum
Table 5
Combined Steel
Eccentrically Brace
Structural Steel Project Constraint
Frame and Steel Moment
Resisting Frame
Economic Constraint
1
(Cost)
Constructability
10
Constraint (Duration)
Sustainability
10
Constraint ( Life Span)
Risk Assessment
10 Constraint (Lateral
Displacement)
6.85 #VALUE! Weighted Sum
1. FINAL DATA
Constructability Risk Assessment
Economic Constraint Sustainability Constraint
Constraint (Duration in Constraint (Lateral
(Cost) ( Life Span)
days) Displacement)
2. Normalized data
Constructability Risk Assessment
Economic Constraint Sustainability Constraint
Constraint (Duration in Constraint (Lateral
(Cost) ( Life Span)
days) Displacement)
900000)/(900000-700000))*(9)+1 =
Combined Steel
Reinforced Concrete
Eccentrically Brace
Weight (%) Design - (Normal Weight Structural Steel
Frame and Steel Moment
Concrete)
Resisting Frame
0.4 7.98 1
0.3 1 10
0.2 1 10
0.1 7.64 10
Combined Steel
Reinforced Concrete
Eccentrically Brace
Weight (%) Design - (Normal Weight Structural Steel
Frame and Steel Moment
Concrete)
Resisting Frame
0.38 7.98 1
0.28 1 10
0.22 1 10
0.12 7.64 10
Combined Steel
Reinforced Concrete
Eccentrically Brace
Weight (%) Design - (Normal Weight Structural Steel
Frame and Steel Moment
Concrete)
Resisting Frame
0.35 7.98 1
0.15 1 10
0.38 1 10
0.12 7.64 10
Constructability Sustainability
Economic Constraint
Design Constraint (Duration Constraint
(Cost)
in days) (Life Span)
Normalized data
Constructability Sustainability
Economic Constraint
Design Constraint (Duration Constraint
(Cost)
in days) (Life Span)
Shunting Bay
Nomalization
((276400-273200)/(276400-271600))*(9)+1 = 7
Table 3
Composite
Project Constraint Weight (%) Shunting Bay
Design
Economic Constraint
0.4 7 1
(Cost)
Constructability
0.3 14 30
Constraint (Duration)
Sustainability Constraint
0.2 7 10
( Life Span)
Risk Assessment
0.1 93,321.28 156,980.60
Constraint (Safety Cost)
Table 4
Composite
Project Constraint Weight (%) Shunting Bay
Design
Economic Constraint
0.38 7 1
(Cost)
Constructability
0.28 14 30
Constraint (Duration)
Sustainability Constraint
0.22 7 10
( Life Span)
Risk Assessment
0.12 93,321.28 156,980.60
Constraint (Safety Cost)
Table 5
Composite
Project Constraint Weight (%) Shunting Bay
Design
Economic Constraint
0.35 7 1
(Cost)
Constructability
0.15 14 30
Constraint (Duration)
Sustainability Constraint
0.38 7 10
(Life Span)
Risk Assessment
0.12 93,321.28 156,980.60
Constraint (Safety Cost)
Design 1 (PC1)
Nomalization
((900000-900000)/(900000-700000))*(9)+1 =
`
Table 3
Saw Tooth Bay Project Constraint Weight (%)
Economic Constraint
10 0.4
(Cost)
Constructability
7 0.3
Constraint (Duration)
Sustainability Constraint (
5 0.2
Life Span)
Risk Assessment
57,430.64 0.1
Constraint (Safety Cost)
Table 4
Saw Tooth Bay Project Constraint Weight (%)
Economic Constraint
10 0.38
(Cost)
Constructability
7 0.28
Constraint (Duration)
Sustainability Constraint (
5 0.22
Life Span)
Risk Assessment
57,430.64 0.12
Constraint (Safety Cost)
Table 5
Saw Tooth Bay Project Constraint Weight (%)
Economic Constraint
10 0.35
(Cost)
Constructability
7 0.15
Constraint (Duration)
Sustainability Constraint (
5 0.38
Life Span)
Risk Assessment
57,430.64 0.12
Constraint (Safety Cost)
14 7 93,321.28
30 10 156,980.60
7 5 57,430.64
2. Normalized data
max-min))*(9)+1
Composite
Shunting Bay Saw Tooth Bay
Design
1 9.38 10
7.26 1 10
6.4 1 10
6.76 1.00 10.00
4.534 4.352 10
Composite
Shunting Bay Saw Tooth Bay
Design
1 9.38 10
7.26 1 10
6.4 1 10
Composite
Shunting Bay Saw Tooth Bay
Design
1 9.38 10
7.26 1 10
6.4 1 10
Constructability Sustainability
Design Economic Constraint (Cost) Constraint (Duration Constraint ( Life
in days) Span)
Reinforced
Concrete Design -
108127800 420 50
(Normal Weight
Concrete)
Structural Steel 149421806.8 345 47
Steel Bracing
2. Normalized data
Constructability Sustainability
Design Economic Constraint (Cost) Constraint (Duration Constraint ( Life
in days) Span)
Reinforced
Concrete Design -
#VALUE! #VALUE! #VALUE!
(Normal Weight
Concrete)
Structural Steel #VALUE! 10 #VALUE!
Steel Bracing #VALUE! #VALUE! #VALUE!
Design 1 (PC1)
Nomalization
((900000-900000)/(900000-700000))*(9)+1 =
Table 3
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Structural Steel
Weight Concrete)
Economic
0.4 7.98 1
Constraint (Cost)
Constructability
Constraint 0.3 1 10
(Duration)
Sustainability
Constraint ( Life 0.2 1 10
Span)
Risk Assessment
Constraint (Lateral 0.1 7.64 10
Displacement)
Weighted Sum 4.456 6.4
Table 4
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Structural Steel
Weight Concrete)
Economic
0.38 7.98 1
Constraint (Cost)
Constructability
Constraint 0.28 1 10
(Duration)
Sustainability
Constraint ( Life 0.22 1 10
Span)
Risk Assessment
Constraint (Lateral 0.12 7.64 10
Displacement)
Weighted Sum 4.4492 6.58
Table 5
Reinforced Concrete
Project Constraint Weight (%) Design - (Normal Structural Steel
Weight Concrete)
Economic
0.35 7.98 1
Constraint (Cost)
Constructability
Constraint 0.15 1 10
(Duration)
Sustainability
Constraint ( Life 0.38 1 10
Span)
Risk Assessment
Constraint (Lateral 0.12 7.64 10
Displacement)
Weighted Sum 4.2398 6.85
Stuctural Context
1. FINAL DATA
Risk
Assessment Constructability
Constraint Design Economic Constraint (Cost) Constraint (Duration
(Lateral in days)
Displacement)
Reinforced
Concrete Design -
76 61,001,703.12 514
(Normal Weight
Concrete)
65 Structural Steel 85,447,953.48 420
Steel Bracing
2. Normalized data
Risk
Assessment Constructability
Constraint Design Economic Constraint (Cost) Constraint (Duration
(Lateral in days)
Displacement)
Reinforced
Concrete Design -
#VALUE! #VALUE! 1
(Normal Weight
Concrete)
#VALUE! Structural Steel #VALUE! 10
#VALUE! Steel Bracing #VALUE! #VALUE!
Design 1 (PC1)
Nomalization
((900000-900000)/(900000-700000))*(9)+1 =
Table 3
Reinforced Concrete
Steel Bracing Project Constraint Weight (%) Design - (Normal
Weight Concrete)
Economic
0.4 7.98
Constraint (Cost)
Constructability
Constraint 0.3 1
(Duration)
Sustainability
Constraint ( Life 0.2 1
Span)
Risk Assessment
Constraint (Lateral 0.1 7.64
Displacement)
#VALUE! Weighted Sum 4.456
Table 4
Reinforced Concrete
Steel Bracing Project Constraint Weight (%) Design - (Normal
Weight Concrete)
Economic
0.38 7.98
Constraint (Cost)
Constructability
Constraint 0.28 1
(Duration)
Sustainability
Constraint ( Life 0.22 1
Span)
Risk Assessment
Constraint (Lateral 0.12 7.64
Displacement)
#VALUE! Weighted Sum 4.4492
Table 5
Reinforced Concrete
Steel Bracing Project Constraint Weight (%) Design - (Normal
Weight Concrete)
Economic
0.35 7.98
Constraint (Cost)
Constructability
Constraint 0.15 1
(Duration)
Sustainability
Constraint ( Life 0.38 1
Span)
Risk Assessment
Constraint (Lateral 0.12 7.64
Displacement)
#VALUE! Weighted Sum 4.2398
Risk
Sustainability Assessment
Constraint ( Life Constraint
Span) (Lateral
Displacement)
50 15.23
47 5.76
Risk
Sustainability Assessment
Constraint ( Life Constraint
Span) (Lateral
Displacement)
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
1
10
10
10
6.4 #VALUE!
10
10
10
6.58 #VALUE!
10
10
10
6.85 #VALUE!