Sei sulla pagina 1di 34

Site Binder

Telkomsel LTE TDD Project

Site ID : JKT373
Site Name : JKT373
KALISENTIONGBATUAMPARDMTME
Site Type : Macro Outdoor
SOW : Add RRU, Add UMPTb9, Add Antenna
PO Number :

Template confirm by:


Huawei Telkomsel

Name

Date

SIGNATURE

TELKOMSEL HUAWEI

_____________ _____________
Selnet
SITE ACCEPTANCE DOCUMENT CHECKLIST

SITE ID : JKT373
SITE NAME : KALISENTIONGBATUAMPARDMTME
SITE TPYE : Macro Outdoor

Hereby stated description and item below refer to the documents attached have been approved for
construction:

CHECKED
No. Table of Contents TELKOMSE REMARKS
HUAWEI
L
ENodeB ATP
1 Accept Test Procedure for eNodeB  
A. Bill o Quantity (BoQ)  
B. eNodeb VSWR Test  
C. Commisioning Record  
D. Tranport Link  
E. Stand Alone Test  
F. Integration Test  
G. Punch List Summary  
AS BUILT DOCUMENTATION
2 A. Commissioning Capture  
B. Installation Photo  

Submitted by Approved by
Huawei Telkomsel
Name

Date

SIGNATURE

eNodeB ACCEPTANCE TEST PROCEDURE

TELKOMSEL HUAWEI

_____________ _____________
Selnet
1.1 Bill of Quantity (BoQ)
Quantity
No. Model Description
Existing Add Total
BTS3900 WCDMA (Band 1 2100MHz, CE
1 U:560 D:416, DC -48V, ATM 8E1, Version:   1 0 1
V200R011)/ H109
> Hardware        

  Main Equipment        

BBU3900, QWLM1BBU2 Distributed Base Station Base


  QW-BBUU 1 0 1
Band Unit (-48 V)

Trunk Cable, 15m, 120ohm, 4E1, 0.4mm, D26M


SS-DL-8E1-120-10 0 0 0
(3ROW), 120CCP80, 4P430U (S)

RRU3804C,QWEM1RRU,Distributed Base Station Radio


  QW-RRUD 0 3 3
Remote Unit(-48V,40W,1.25G)

Optical Transceiver, eSFP, 1310nm, STM1, -15~-dBm,


  eSFP-850nm-1000Base-Sx/FC200 MM 0 6 6
-31dBm, LC, SM, 15km

Quantity
No. Model Description
Existing Add Total
DBS3900 WCDMA (Band 1 2100M, CE U:560,
1   0 0 0
DC -48V, Outdoor) Version: V200R011/ H88
> Hardware        

  Main Equipment        

BBU3900, QWLM1BBU2 Distributed Base Station Base


  QW-BBUU 0 0 0
Band Unit (-48 V)

Trunk Cable, 15m, 120ohm, 4E1, 0.4mm,


  SS-DL-8E1-120-10 0 0 0
D26( 3ROW), 120CC8PO.4P430U (S)

RRU3929,QWEM1RRU,Distributed Base Station Radio


  QW-RRUD 0 0 0
Remote Unit(-48V,40W,1.25G)

Optical Transceiver,eSFP,850nm,2.125Gb/s (Multi rate)


  eSFP-850nm-1000Base-Sx/FC200 MM 0 0 0
, -9.5~-2.5dBm,-17dBm,LC,MM,0.5Km

2 APM for WCDMA    


  S4020922 APM Support 0 0 0
2 * Site BOQ will base on the actual install material

1.2 eNODEB VSWR Test

SITE SITE CONFIG : S111 DATE : 15 Desember 2017

TELKOMSEL HUAWEI

_____________ _____________
Selnet
:KALISENTIONGBATUAMPARDMTME
VSWR TEST

No RU Board RU Panel and Port VSWR Audit

RRU/ RFU – Port 0 124


1 RRU/ RFU 0
RRU/ RFU – Port 1 119

RRU/ RFU – Port 0 112


2 RRU/ RFU 1
RRU/ RFU – Port 1 124

RRU/ RFU – Port 0 114


2 RRU/ RFU 1
RRU/ RFU – Port 1 120

Notes:
1. VSWR value shall be refer to the specification manual from the supplier
2. VSWR ≤ 1.3

1.3 Commissioning Record

SITE :
DATE : 15 Desember
‘KALISENTIONGBATUAMPARDMTM SITE CONFIG : S111
2017
E

TELKOMSEL HUAWEI

_____________ _____________
Selnet
Cell parameter Plan Actual Remarks
PCI 3 3
Antenna direction
Sector 1 - -
(Azimuth)
Antenna Tilt (M/E)
- -
(Degree)

PCI 4 4
Antenna direction
Sector 2 - -
(Azimuth)
Antenna Tilt (M/E)
- -
(Degree)

PCI 194 194

Antenna direction
Sector 3 - -
(Azimuth)
Antenna Tilt (M/E)
- -
(Degree)

1.4 Transport Link

Topology :

TELKOMSEL HUAWEI

_____________ _____________
Selnet
VLAN Information :

No VLAN VLAN Function Remark


VLAN ID
1 2519 New VLAN
C-PLANE
VLAN ID
2 2419 New VLAN
U-PLANE
3 3815 VLAN ID Clock Existing
4 3577 VLAN ID OAM Existing

1.5 Stand Alone Test


Test category Test item Test sub-item Test result Audit

T01 Hardware T01-01 T01-0101 Power-on check of  Pass  Fail  N/A


BBU3900

TELKOMSEL HUAWEI

_____________ _____________
Selnet
Power-on Status
Check
T01-0102 Power-on check of RRU  Pass  Fail  N/A

T01-02
Hardware Status T01-0201 Status check of Boards  Pass  Fail  N/A
Check

T01-0301 Status Check of Ports of


S1 interface
 Pass  Fail  N/A
T01-03
Port Status Check T01-0302 Status Check of Local
Ethernet Port
 Pass  Fail  N/A

T02-0101 System Restart  Pass  Fail  N/A


T02-01 T02-0102 BBU/RRU Blocking and
Equipment Unblocking
 Pass  Fail  N/A
T02 Operation Management
T02-0103 Online Cell Data Query
and
Alarm
 Pass  Fail  N/A
Maintenance
T02-02
Maintenance T02-0201 Local Maintenance
Channel through Local Ethernet Port
 Pass  Fail  N/A
Management

1.6 Integration Test


SITE : DATE: 15 Desember
SITE CONFIG: S111
‘KALISENTIONGBATUAMPARDMTME 2017
Basic Service Test

TELKOMSEL HUAWEI

_____________ _____________
Selnet
Cell No. Test Item Pass Fail Speedtest Result Remarks
FTP download £ £ 17.56
Cell 1 FTP upload £ £ 4.66

FTP download £ £ 17.42


Cell 2 FTP upload £ £ 5.35

FTP download £ £ 34.59


Cell 2 FTP upload £ £ 4.37

1.7 Punch List Summary


Site Name : ‘KALISENTIONGBATUAMPARDMTME
Check Result :

TELKOMSEL HUAWEI

_____________ _____________
Selnet
Rectified By
No. Items Descriptions Remarks
HUAWEI TELKOMSEL

Note:
 Please record the items and detail description if there is any items that can not be
complete the test or check.

AS BUILT DOCUMENTATION
2.1 Commissioning Capture
RRU/RFU TOPOLOGY

TELKOMSEL HUAWEI

_____________ _____________
Selnet
TELKOMSEL HUAWEI

_____________ _____________
Selnet
BBU DEVICE MAINTENANCE
Before

TELKOMSEL HUAWEI

_____________ _____________
Selnet
After

LST ALMAF
Before

TELKOMSEL HUAWEI

_____________ _____________
Selnet
After

VSWR
Before

TELKOMSEL HUAWEI

_____________ _____________
Selnet
After

DSP LICENSE

TELKOMSEL HUAWEI

_____________ _____________
Selnet
TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP OMCH

TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP SCTPLNK

TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP S1

TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP CELL

TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP BRD

TELKOMSEL HUAWEI

_____________ _____________
Selnet
DSP RETSUBUNIT

DSP GPS

TELKOMSEL HUAWEI

_____________ _____________
Selnet
LST CLOCKMODE

LST CLKSYNCMODE

TELKOMSEL HUAWEI

_____________ _____________
Selnet
SPEED TEST
Sector 1

Sector 2

TELKOMSEL HUAWEI

_____________ _____________
Selnet
SPEED TEST
Sector 3

Sector 4

N/A N/A N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
2.2 Installation Photo
BTS CABINET Photo

BBU Photo
Before After

TELKOMSEL HUAWEI

_____________ _____________
Selnet
RRU Photo
NEW
Sect 1 Sect 2 Sect 3

GPS INSTALLATION
GPS antenna GPS cable connection

TELKOMSEL HUAWEI

_____________ _____________
Selnet
GPS INSTALLATION
Surge Protector

ANTENNA INSTALLATION Sector 1


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
ANTENNA INSTALLATION Sector 2
BEFORE AFTER

N/A

ANTENNA INSTALLATION Sector 3


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
AZIMUTH ANTENNA Sector 1
BEFORE AFTER

N/A

20

AZIMUTH ANTENNA Sector 2


BEFORE AFTER

N/A 170

TELKOMSEL HUAWEI

_____________ _____________
Selnet
AZIMUTH ANTENNA Sector 3
BEFORE AFTER

N/A

270

ELECTRICAL TILTING Sector 1


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
ELECTRICAL TILTING Sector 2
BEFORE AFTER

N/A

ELECTRICAL TILTING Sector 3


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
MECHANICAL TILTING Sector 1
BEFORE AFTER

N/A

MECHANICAL TILTING Sector 2


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet
MECHANICAL TILTING Sector 3
BEFORE AFTER

N/A

ANTENNA PORT CONNECTION Sector 1


BEFORE AFTER

N/A

ANTENNA PORT CONNECTION Sector 2

TELKOMSEL HUAWEI

_____________ _____________
Selnet
BEFORE AFTER

N/A

ANTENNA PORT CONNECTION Sector 3


BEFORE AFTER

N/A

TELKOMSEL HUAWEI

_____________ _____________
Selnet