Project Documentation is restricted information for use of project members of project implementation partner - Leadsoft Solution
Pvt. Ltd. (Leadsoft) and owner - Sree Jayajothi Cement Ltd. (SJCL)
TABLE OF CONTENTS
1. INTRODUCTION ..................................... 16
2. ORGANISATIONAL OVERVIEW................ 17
8. Conditions ............................................. 40
• Business Process
• Expectations/ Improvements
• Reporting/Information requirements
During the workshops, the core team members were communicated the
capabilities and functionality of the SAP solution.
2. ORGANISATIONAL OVERVIEW
2.1. Executive Summary
Sree Jayajothi Cement Ltd, SAP implementation spans the following the
division.
• Plant
• Storage Location
• Purchasing Organization
• Purchasing Group
3.1.1. PLANT
An entity in SAP is defined as a ‘Plant’ if one or more of the following conditions are
met:
• The plant is assigned to a single company code. A company code can have several
plants.
• Several storage locations in which materials are managed on quantity basis can
belong to a plant.
• A plant can be assigned to several combinations of sales organization and
distribution channel.
• A plant can have several shipping points.
• A plant can be defined as a planning plant.
A plant has an address, a language and belongs to a country. A plant also has its own
material master data. The plant plays an important role in the following areas:
In SJCL, the entities, satisfying one or more of the following, will be defined as Plants in
SAP:
Physical Plants
Manufacturing location
Inventory holding point where Inventory is valuated
Level at which MRP run is to be carried out
In line with the above rationale, following entity (indicative) will exist as plant in SAP:
Physical Plant
• 1000(Banaganapalli-Works 1)
3.1.1.3. ASSIGNMENTS
In SAP, plants are assigned to company codes. A plant can belong to only one company
code. The table underneath depicts the detail list of entities to be defined as SAP
‘Plants’ along with their assignments to ‘Company Code’:
A storage location is the place where stock is physically kept within a plant. There may
be one or more storage locations within a plant. Storage locations are always created
for a plant. A storage location has the following characteristics
• SJCL has to give the nomenclature for all the storage locations decided before the
blue print is finalized.
In view of the above rationale, following is the purchasing organization for SJCL:
3.1.3.3. ASSIGNMENTS
Purchasing organization will be ‘floating’ in nature. This implies that these will not be
attached to any company code. Instead, plants across company codes will be assigned
to each purchasing organization (refer to the table below). At the time of transactions,
company codes will be determined through plants.
Key for a buyer or group of buyers responsible for certain purchasing activities.
The purchasing organizations in SJCL have been designed based on the following
criteria:
In view of the above rationale, following are the examples of purchasing group for SJCL:
4.1.1. GENERAL
All the materials, which are in storage stock, will be valued on the basis of moving
average price (in their respective material master records) at plant level
BUSINESS BLUE PRINT DOCUMENT: MM MODULE Page 23
Materials moving average price will be affected only when material is procured or
bought to storage location stock, the moving average price of materials will not change
if posted directly to asset or bought to special stock
Source List Field: If this indicator is active system for a plant then source
determination has to be specified in the source list before a purchase order can be
created
MRP type: Key that determines whether and how the material is planned.
Storage Bin: It identifies the storage bin within the storage location where the
material is stored. The value is merely for information purpose.
Purchasing Value Key: Key that identifies the reminder days and tolerance limits.
Materials with the same basic characteristics are grouped together and assigned to a
Material type. This allows managing different materials in a uniform manner in
accordance with the company’s requirements.
Account Category Reference: A group of valuation classes that the system uses. It
checks whether the valuation class you has entered is allowed when you maintain
the accounting data in the material master record.
Internal / External Procurement: Allows external procurement and internal
procurement (production) of materials for a particular material type
Together with the plant, the material type determines the material's inventory
management requirement; that is:
Material group is used for the purpose of grouping together of goods and services by
their characteristics or technical properties for control and information analysis
purpose. Material group can also be used to default the consumption / expense account
in case of PO wherein the Material code is not maintained.
The various Material Groups will be decided by SJCL during Realization Phase. Given
below is a sample list for reference purpose:
Chemicals
Electrical Spares
Mechanical Spares
Instrumentation Spares
General Spares
Finished Goods
Services
Raw Materials
Semi finished Goods
Finished Goods etc…
The various Material Types that shall be created for use in SJCL will be decided during
Realization Phase. SJCL shall identify the materials for creation of material types.
However the list could be as follows:
The material number range, will be system generated (internal number range)
for SJCL.
BUSINESS BLUE PRINT DOCUMENT: MM MODULE Page 25
The Views / user data screens that need to displayed during creation /
change and display of material master record will be identified along with
Material types during blue print finalization stage
Account category reference for each material type needs to be finalized along
with material types during blue print finalization stage
Since no material is produced internally through SAP system, all the material
types will have indicator ‘0 (ZERO)’ (No internal Purchase order allowed)
Quantity and Value updating will be carried out depending on the material
type. The List will be finalized along with material types during the blue
print finalization stage
• SJCL has informed that ROL materials will be having manual reorder point
planning with indicator ‘VB’.
• The details like MRP group, MRP controller, Lot size etc, will be discussed during
the realization phase
Storage Bin: It identifies the storage bin within the storage location where the
material is stored. The value is merely for information purpose.
• This field will be used in SJCL for recording storage bin data only for information
purpose
Purchase Groups: This field will be used in SJCL to identify which purchasing group is
responsible for a particular material
The List of material groups needs to be given during realization phase by SJCL Core team
members.
Purchasing Value Key: Key that identifies the reminder days and tolerance limits.
SJCL has to confirm if they would be using this specific field in the master. If yes, they
have to provide data for reminder and tolerance during realization phase.
Valuation Class: The List of valuation class will be finalized depending on the account
category reference given in the material type during the blue print finalization stage.
4.6. INTEGRATION
4.6.1. FINANCE MODULE:
Account category reference for each material type needs to be finalized along with
material types during blue print finalization stage
Quantity and Value updating will be carried out depending on the material type. The
List will be finalized along with material types during the blue print finalization stage
The List of valuation class will be finalized depending on the account category
reference given in the material type during the blue print finalization stage
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
All the business related information on vendors is stored in the vendor master. The
vendor has the following views:
General Data: Data related to name, address, telephones, contact persons, industry
details, etc., which remain constant for a vendor across organization elements such
as company code, purchasing organization in SAP.
Accounting Data: Data used in Financial Accounting, such as the reconciliation
account number, sort key, banking related data, dunning related data, etc., which
remains constant for a company code. Ownership of this data is mainly with the
accounting function. Since there is only one company code in this implementation,
all the customers will have the accounting data maintained for a single company
code representing SJCL.
Purchasing Data: Data used in purchasing transactions, such as the indicator for
pricing procedure, currency for the purchase documents, payment terms, Incoterms,
partner determination etc are maintained in this view. This view needs to be
maintained for each of the purchasing organization.
Vendor
Ordering address
Goods supplier
Invoicing party
Vendor can be blocked for account posting for a single company code or for all company
codes
Vendor can be blocked for purchasing for a single Purchase Organization or for all
Purchasing organizations.
For Materials
Domestic Vendors
Import Vendors
For Services
Domestic Vendors
International Vendors
One time Vendors 1
Employees – as Vendors
Finance Vendors
All the vendors for MM shall be created using an internal number range, except
employee vendors. The number range shall be different for each of the account group.
The number range for vendors, whether internal or external needs to be decided by
SJCL during the realization stage.
Also the number range intervals shall be identified during the realization stage.
FI shall create Employees as vendors using separate Account groups. External number
range / internal number range will be finalized by SJCL.
There are some vendors who are directly paid by Finance without vendor liability getting
created from Purchasing and Inventory route. Such vendors shall be created by FI using
the vendor account groups related to FI e.g. Finance Vendors etc. For such vendors,
purchasing data shall not be maintained and no PO can be raised.
A vendor will have a single vendor code throughout the company code.
1
You can create special vendor master records for vendors from whom you procure goods only
once or rarely, so-called One Time vendors. One-time vendor" master record is used for several
vendors. The purpose of this is to avoid the unnecessary creation of an excessive number of
individual vendor master records. At the time of PO, the user shall have to insert the address ,
name etc.
SJCL can use all the partner functions as applicable, although none of these partners
shall be compulsory.
SJCL can use the entire Vendor blocking functionality at company code level as
applicable, although it shall not be compulsory.
Standard payment terms with respect to each vendor shall be attached in the
vendor master as payment terms. The same shall be informed and given by SJCL
Core team members during the realization stage
Respective Inco-terms will be mentioned for each vendor depending on their agreed
terms and conditions
Schema group will be maintained as domestic and import respectively for domestic
and import vendors
GR-based Invoice verification indicator and Service based invoice verification
indicator will be active in the purchasing data of the Service and Materials vendor
master respectively
Purchasing group will be maintained for each vendor master to identify the
responsible group
5.6. INTEGRATION
Reconciliation account need to be given in the vendor master record and this needs
to be identified and communicated by the Finance department at the time of
realization for effective posting, for balances & reconciliation of Invoice values in
Vendors account.
Different payment terms need to be identified with the MM core team for effective
payment process between MM and FI.
The payment mode for each vendor would be taken up at the time of realization.
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
The vendor account groups need to be finalized at the time of blue print finalization
stage
The number range for vendors, whether internal or external needs to be decided by
SJCL during the realization stage
Also the number range intervals shall be identified during the realization stage
A source of information for the procurement of a certain material from a certain vendor.
Standard Information record: Specifies that the info record is used only in
connection with standard purchase orders. If this indicator is set, the data from the
info record (e.g. conditions, texts etc.) is only adopted in standard PO’s.
Subcontracting Information record: Specifies that the info record is used only in
connection with subcontracting orders. If this indicator has been set, the data from
the info record (e.g. conditions, texts, etc.) is only adopted in subcontract orders.
Pipe Line Information record: Specifies that the info record is used specifically for
pipeline withdrawals
Consignment Information record: Specifies that the info record is only used in the
case of consignment withdrawals. If you set this indicator, the data of the info
record (conditions, texts etc.) is only adopted for the purpose of procuring
consignment materials
Defining price history: Specifies whether the purchase order price history should be
updated with effective price or the net price
Vendor material number: Material number used by the vendor. In most cases, the
vendor uses a different number for the material than the one used in this system.
The vendor's material number can therefore also be quoted in a Purchase Orders for
identification purposes.
Standard quantity: Quantity of the Material that is normally ordered from the
Vendor The standard purchase order quantity serves as a basis for computing the
effective prices in vendor evaluations for determining the price if a price/quantity
scale applies
Minimum Purchase Order quantity: Smallest quantity of the material that can be
ordered.
Material Master record Po text not relevant: Specifies whether the info record PO
text (and not the PO text that is stored in the material master record) is to be copied
into the purchasing document item. If this indicator has been set, the info record PO
text is always displayed and printed out (if one exists).
Source list is used to identify a list of vendors on whom the PO can be raised. The source
list can also be used to fix a vendor for the material procurement plant wise.
SJCL identify the material for which the source list is required
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
Terms of payment (such as surcharges or discounts) those are negotiated with a vendor.
The conditions determine how the system calculates the net price or effective price.
While making a PO / Contract, several Pricing Conditions can be defined to arrive at the
Net Price from the Basic Price. These conditions are e.g. Freight, Discount, Packing /
Forwarding etc. Various conditions shall be created in SAP and the group of conditions
shall be proposed in the PO / Contract. The proposed group of conditions which can be
used in a PO / Contract shall be controlled using the Pricing procedure. The pricing
schemas (procedures) shall be created and be assigned to each vendor to get the
relevant set of conditions automatically while creating a PO / Contract
E.g. When a PO is created for an Indian Vendor, a pricing procedure which captures the
details of Basic Rate, Freight etc. shall be available whereas in case of PO for a foreign
vendor, a procedure containing Customs duty, Insurance etc. shall be available.
All charges like excise duty or tax are applicable for SJCL. We propose some conditions
for local purchases:
Basic Price
Discounts
Surcharges
SJCL shall provide all the details of pricing elements that are required for local and
import purchases.
Some important points regarding the delivery conditions are:
Delivery conditions can be either on a percentage or value basis. For these charges,
a separate vendor can be selected. The payment for the vendor(s) shall be effected
with the help of invoice verification against the PO
The TT Charges and LC charges shall be handled directly through FI entry. The
Demurrage charges shall be handled as FI entry however, a condition has been
provided in the PO, if the user wants to identify the same and load it on the material
cost
Final list of conditions shall be finalized during the realization stage
2
Delivery Conditions are those conditions wherein the user can identify that the charges are to be paid to
another vendor than the vendor on whom the PO is created. Such conditions shall be identified as accrual
entries in Accounting. A separate clearing account is posted for such conditions at the time of Goods receipt
(GRN). The vendor if need be changed at the time of GRN. However, no change in value of charges can be
carried out during the creation of GRN.
8.6. INTEGRATION
Nil / None
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
Service Master is a repository for the descriptions of all services that a firm frequently
has to procure. There is a service master record for each individual service description.
A service master record contains the following principal information for the unique
description of a service:
Service number
Service category
(Service category: Key used to differentiate between services according to their usage)
The list of service categories will be decided during the blue print finalization stage
The number range for service master records is based on the service category.
The number range assignment and series will be standard as per SAP.
9.6. INTEGRATION
Nil / None
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
Service specifications contain service items with detailed descriptions or items with
value limits for unplanned services
For bid solicitation purposes, service specifications are entered in requests for quotation
(RFQs). If the specified work is to be awarded directly to a bidder, the service
descriptions are entered in a purchase order (PO). If longer-term business relations are
entered into with certain suppliers, specifications can be entered in contracts. The
individual service descriptions need not be entered manually, but can be copied from
the service master or from existing specifications
10.6. INTEGRATION
Nil / None
The above is only outline authorization. Authorization for each individual user Id will be
finalized along with their roles during realization phase.
• Directly (manually) or
• Indirectly (thru another SAP component)
11.3.1. INFORMATION IN A PR
PR submitter shall identify the plant for which the material is being
requested, Account Assignment or is a consumable item for stock
purpose, quantity and the rate of the material, delivery date, if vendor is
fixed the same can be identified in PR.
In case SJCL, following value levels shall be followed for all the PR
documents with document type services.
The “Value” that is considered for Release Strategy will be the “Net
value” only and the Conditions (Freight etc.) and Taxes will not be
considered.
• All approvers will be able to approve / reject the PR.
• The approver can block a PR, which means that the PR is not to be
processed.
• Any approver in the release strategy can change / delete the PR. In
case the changes in a PR are pertaining to increase in value (either
quantity or unit price) or above a predefined percentage the PR
Identifies the new release procedure for the same.
• After the PR gets approved, there are 2 options for “Changes”. Either
the entire PR is open for changes or nothing in the PR is open for
changes. Out of these 2, “everything opens for Changes” is a better
option, since in the other option if the PR is to be modified for any
reason, it cannot be done and Buyer will have to cancel the PR and
make a fresh PR. However, in the option where all fields are open to
change, only the change pertaining to “Value” will trigger re approval
of the PR. Other Changes will not call for a re approval, although any
change will be tracked as Audit Trail.
Note: The value posted for goods receipt would be from moving average
price of the material and not the actual cost of purchase.
Materials
User Department FM
Management
For Service Contracts, during the creation of this requisition, user needs
to give the service description, account assignment – cost center / order
etc, and item category as service.
Standard document type ‘NB’ will be used for materials being raised thru
MRP Planned orders.
Since all material PR’s (With MRP views) which are bought to stock are
created thru MRP run, the indicators like rush, urgent, emergency etc.
cannot be incorporated in PR.
Requirements from
Maintenance orders
MRP
controller Purchase
plans for the Requisition is
material created by MRP
Requirement from
depending on controller
others – manual
reservation
Other User departments can also create the PR directly in the system.
Release strategy will be applicable for direct PR’s.
11.5. INTEGRATION
Nil / None
11.7. REPORTS
Standard Reports
11.8. WORKFLOW
SJCL core team has to give the required personal for configuring release
strategy by workflow.
11.9. DEVELOPMENTS
List of Pending PR’s (i.e. open PR’s).
Source list has to be maintained for materials. The material master has to
be activated for concerned material for source list determination.
The source list will contain the vendor, agreement, and validity periods.
Nil / None
12.5. INTEGRATION
Nil / None
12.7. REPORTS
• Standard
• Source List
• List of Purchase Information Records
• Contracts List
12.8. WORKFLOW
Nil / None
12.9. DEVELOPMENTS
Nil / None
Based on the various PR’s created by the respective users, the various
buyers can process the PR and convert them to RFQ or directly to a PO.
All the RFQ’s identified for a specific activity shall be identified with a
collective number. The collective number is useful as key for quotation
comparison in the system.
SJCL shall let us know if they have their own format for RFQ for which a
separate customized layout development has to be done
The terms of payment, inco-terms etc. along with the prices and delivery
conditions can be maintained.
Quotations shall be entered only after the commercial bids are opened
by the committee. Since there is a time gap between technical
evaluations and commercial bid opening, SJCL can use the field
‘Comments for RFQ’ where it can maintain the status of the RFQ’s /
Quotation.
The user can select the comparison using the delivery costs or without
the delivery costs.
If required the user can identify the relevant payment terms and the
incoterms from the quotation in the comparative analysis report.
13.5. INTEGRATION
None / Nil
13.7. REPORTS
Standard Reports
• Comparative statement
• General analysis of list of RFQ’s for a material /vendor /plant
/purchasing group /purchasing organization
13.8. WORKFLOW
Nil / None
13.9. DEVELOPMENTS
• Layout for print out of RFQ
• Number Range
• Field Status – Which fields can be made hidden / optional /
compulsory
• Which Item category can be used in which document type
• Identifying the Release Strategy
• Can be used for identifying separate layouts
The list of document types proposed for SJCL has been listed below.
The number ranges for the document types shall be identified at the time
of realization.
14.3.4. INFORMATION IN PO
A Purchase Order consists of a document header and item details.
Following details shall be entered at the line item level. If the PO is being
created using the PR reference the same shall be defaulted from the PR.
• Account Assignment
• Item Category
• Plant
• Material code
14.3.7. CONDITIONS
While making a PO, several Pricing Conditions can be defined to arrive at
the Net Price from the Basic Price. These conditions are e.g. Freight,
Discount, Packing / Forwarding etc. Various conditions shall be created in
SAP and the group of conditions shall be proposed in the PO. The
proposed group of conditions which can be used in a PO shall be
controlled using the Pricing procedure. The pricing schemas (procedures)
shall be created and be assigned to each vendor to get the relevant set of
conditions automatically while creating a PO.
The import duties which are payable, shall be identified in the PO. This
shall help to calculate the material value posting inclusive of customs and
countervailing duties. SJCL shall provide all the details of pricing elements
that are required for local and import purchases.
A single PO can have different items that are shipped to different plants.
A “one time vendor” can be selected while making PO. The user can
identify the Name and Address of such vendors at the time of PO
• SJCL shall inform if they have their own format for PO for which a
separate customized layout development has to be done. In case the
layouts for import / local PO’s are different the details of the same
shall be provided by SJCL.
Approval process for PO shall be at the document header level. All the
orders will undergo release strategy. In case of SJCL, the release strategy
can be defined based on the combination of net order value of the PO,
Purchase Group, Document type and Purchasing Organization.
The “Value” that is considered for Release Strategy will be the “Basic
Price minus Discount” only and the Conditions (Freight etc.) and Taxes
will not be considered.
FOC PO, all other PO’s shall be subject to the same Release procedure
If PO value exceeds PR value for a line item, there are no Alerts but if PO
quantity is greater then PR quantity the system will not allow saving.
The system shall calculate the discounts in the PO. The discount should
be identified as a condition in the PO, in the item detail level.
Till the service entry sheet has not been released, bill passing cannot be
carried out.
In some cases, depending on the activity, vendor also uses his own
material for carrying out the services. In such cases the material will also
be identified as one of the service being performed by the vendor. This
shall be used only in those cases wherein such material is not at all taken
into the stocks of SJCL.
The services can be received in excess of PO quantity if the percentage
tolerance has been maintained in the Service PO
For materials sent for repair, Purchase order with item category as
service (‘D’) shall be raised and materials shall be issued to vendor. The
tracking (issue / receipt) of material will not be part of SAP system. Once
the vendor repairs the material, a service entry sheet has to be
performed for the cost to capture into the respective maintenance order
and for posting into accounting.
Release the
Standing Order Print out of Purchase PR’s at the
created for all Operation slip Requisition end of the
services created by the month
together system
Finance to
carry out
Invoice
verification
Following is the flow chart for Normal Maintenance orders containing AMC
services:
User needs to create a ‘Call off order’ in the system. The user need not
create a requisition for call off order. Instead he can refer the contract
and create a ‘Call off Order’ in the SAP system.
14.5. INTEGRATION
Storage Location ‘Shutdown’ has to be defaulted in Purchase Orders thru
MRP – PR or manual PR. This will help in receiving materials into
shutdown storage location.
14.7. REPORTS
Following information can be derived from the standard SAP reports:
Analytical & descriptive Reports on the volume (numbers & value) on the
basis of several parameters – Purchasing Organization, Purchase Groups,
Material Groups, Material Code, Document Type, Plants, Vendor etc.
14.8. WORKFLOW
SJCL has to give the authorized persons list for PO release strategy
14.9. DEVELOPMENTS
Layout for print out of PO
List of Items for which PO delivery date is open (Material Due list) – for
periods: that is pending Po list – report
Contracts in real terms are the rate contracts entered with various
vendors, referring which the organization can raise the purchase orders
as and when the material/ services is required within an agreed time
frame.
Those services, which are provided once but a legal contract has been
signed with the vendor for the same cannot be termed as CONTRACT in
system perspective. Such contracts are Purchase orders only
Quantity contracts
Value contracts
This type of contract shall be used if the total value of all release orders
issued against the contract is not to exceed a certain predefined value.
The contract is regarded as fulfilled when release orders totaling a given
value have been issued.
• Purchasing Organization
• Purchasing Group
• Account Assignment
• Item Category
• Plant (in case of centrally agreed contract or contract for all plants of
a purchasing organization, it’s not necessary)
• Material code
• Description
• Purchasing group/ materials group
• Quantity
• Delivery Dates
• Prices
• Conditions / Plant wise Conditions
Contract can be raised without a Material code. However, the text for
material description needs to be maintained.
15.3.6. CONDITIONS
Same as PO, conditions can be maintained in the Contract and the same
shall be defaulted at the time of Purchase Order.
• Framework Order can be created. Qty will be 12 and Price will be the
Monthly Fees. There is a provision to put in “Unplanned Service
Lines” and assign “Overall Limit”. This will take care of the extra work
and it can be controlled by way of the Limit. No CWR can be raised in
case of these services.
15.5. INTEGRATION
Nil / None
15.7. REPORTS
Standard Reports
• General analysis of list of Contracts for a material /vendor /plant
/purchasing group /purchasing organization
15.8. WORKFLOW
Nil / None
15.9. DEVELOPMENTS
Layout for print out
16.1. DEFINITION
Inventory Management module keeps track of all the quantities in the
stock. The processes covered under Inventory Management are:
• Receipt of Goods
• Issuing the material as per the requirement
• Direct consumption of Material at the time of Receipt
• Transfer of Materials between storage locations
• Transfer of materials between plants
For e.g. 101 for Goods receipt of Stock into Free Stock, 201 for issue of
Material to a Cost Centre etc.
16.3.3.2. DOCUMENTS
Whenever a Material movement is carried out in SAP, a material
document is created. The Material document depicts the details of
material movement carried out.
SJCL can use the above fields for the information as required by them.
Line level text flows to the Accounting document. No. of containers, Gate
entry no., other details may be entered in the text field to the extent as
possible in this field.
Stock A/c Dr
To GR / IR Clrg. A/c Cr
Consumption A/c Dr
To GR / IR Clrg. A/c Cr
Goods issue with reference (movement type 201) will be carried out for
all issue of materials to departments.
Prepares
Reservation or
Maintenance Order
(Reservation)
Reservation print
out
Approval by
Authorized staff
Accounting
documents posted
User collects the material automatically
Accounting Entry:
Consumption A/c Dr
To Stock A/c Cr
Prepares Reservation or
Maintenance Order
(Reservation) with reversal
movement type
Approval by
Authorized staff
Accounting
document posted
automatically
User collects the material
Accounting Entry:
Stock A/c Dr
To Consumption A/c Cr
In case of SJCL, the material shall be rejected at the receipt stage based
on the remarks/ feedback given by the user. The stores personnel shall
prepare the return delivery with respect to the GRN. The user shall
specify the reason for rejection while preparing the return delivery
document. This would result in opening the quantity of the relevant PO
so that vendor can supply the fresh material.
If the bill of the vendor has been passed and later the material is rejected
while using, the vendor liability is not reduced automatically while
posting the vendor returns.
At the time of vendor return of Stock item, system credits the Stock
account and debits the GR/IR account but vendor does not get debited
automatically.
Accounting Entry:
GR / IR Clrg. A/c Dr
To Stock A/c Cr
The above entry would be the same for goods receipt which are cancelled
using movement type 102.
A PO shall be prepared for the making charges and if the freight charges
are also borne by SJCL then a condition type shall be used to identify the
same in PO. When the invoice is received from the vendor for job-work /
subcontracting, the same shall be passed using Invoice verification.
There shall be no relation with the Material movement and the PO placed
on the vendor.
Note:- Maintenance materials sent for repair would not be part of this
process. Instead they would follow external service management of
Materials Management. Also these materials will not be tracked or be a
part of inventory. Refer to external service management section for
details.
Scrap A/c Dr
To Stock A/c Cr
Since the user raises a purchase requisition and brings the material by
cash (no order is raised to the vendor). The goods receipt in SAP system is
carried out thru transaction ‘Goods receipt without purchase orders’.
The movement type will be 501 for these receipt transactions.
A cost object needs to be specified during GR.
Create a
Goods issue reservation,
against And submit
reservation the bill to
finance
The holding charges should be taken into separate G/L account and
would not hit the stock account. If required a service line can be created
for holding charges within the same contract or order
Accounting Entry:
Consumption A/c Dr
To GR / IR Clrg. A/c Cr
No value is
Vendor sends the Stores makes a posted
materials based on the goods receipt for
intimation consignment stocks
Invoice
settlements
Vendor submits
for
his Invoice / Bill consignment
materials
With respect to tracking of material when goods are placed on ship, SJCL
can use the functionality of inbound delivery. When goods are posted on
the vessel, SJCL materials personal has to crate inbound delivery in the
system thru which they can know the status of the order or material.
(This inbound delivery step is not mandatory, its optional).
Following is the process flow for imported items:
16.5. INTEGRATION
Accounting & CO documents when creating material movements
Updation of costs to maintenance orders
Material revaluation can be carried out for other material also depending
on the need.
16.7. REPORTS
Document list for all receipts and consumptions will be shown in SAP
standard report by giving selection criteria of material code, movement
type and date. Also the stock of consumable material as on date would
be a standard SAP report.
16.8. WORKFLOW
Nil / None
16.9. DEVELOPMENTS
• Development for Material receipt
• Development for Material Issue Note (Reservation Note)
SJCL has to finalize number of physical inventories per fiscal year of cycle
counting (Specifies how often during the fiscal year a physical inventory is
to be carried out for a material subject to cycle counting) during
realization phase.
In this step the physical count is carried out in the stores. The results are
entered in the SAP system.
The system then compares the results of the count with the book
inventory balance for every material. You can create a difference list,
with which you can decide which materials displaying large difference are
to be recounted. When you trigger a recount, a new physical inventory
document is automatically created.
4. Posting
Stocks can be divided into various stock types, depending on how the
stock is to be used:
• Unrestricted-use stock in the warehouse
• Stock in quality inspection
• Blocked stock
If more than one stock type exists for a material, these can be entered in
a physical inventory document. Each stock type must, however, be
entered and counted as a separate physical inventory item.
BUSINESS BLUE PRINT DOCUMENT: MM MODULE Page 100
Special stocks also have to be handled separately. These include:
• Consignment stock
Separate physical inventories must be carried out for your own stock and
for the various special stocks such as vendor consignment stock. Separate
physical inventory documents must be created in each case.
17.5. INTEGRATION
Gain / Loss accounts will be posted thru accounting document.
17.7. REPORTS
Standard Reports
Inventory difference list
17.8. WORKFLOW
Nil / None
17.9. DEVELOPMENTS
Nil / None
The advantage of creating a planned order is that the MRP controller has
more control over the procurement proposals. The purchasing
department cannot order the material until the MRP controller has
checked and converted the order proposal. If a purchase requisition is
User has to select two important indicators during the planning run:
NETCH (Net change for total horizon) has to be selected
‘3’ for the system to generate planned orders in the filed ‘create
purchase requisition
If the material available in stock is more than reorder point level, system
will not raise any planned order or requisition. If the requirement is more
than the available quantity, the materials planning controller has to
create manual PR in the system thru MRP component.
The safety stock exists to cover both excess material consumption within
the replenishment lead time and any additional requirements that may
occur due to delivery delays. Therefore, the safety stock is included in the
reorder level.
The following values are important for defining the reorder point:
• Safety stock
• Average consumption
• Replenishment lead time
The following values are important for defining the safety stock:
In manual reorder point planning, you define both the reorder level and
the safety stock level manually in the appropriate material master.
• For all Stock materials which have MRP view maintained in the
material master only reservations are raised either manually or
automatically thru maintenance orders.
18.5. INTEGRATION
Reservations / Requirements from Plant maintenance module for all
stock materials
18.7. REPORTS
Standard Reports
• MRP list
• Stock List
18.8. WORKFLOW
Nil / None
18.9. DEVELOPMENTS
Nil / None
• Delivery reliability
• Price
• Quality
• General Service
Price
o Price level
o Price history
Quality
o GR lots
o Complaints level
o Quality audit
Delivery
Overall evaluation 1
Price 2
Quality 3
Delivery 4
Service 5
SJCL can use both equal weighting key and unequal weighting key for
computing the scores manually through the above criteria’s
User can enter the scores against sub-criteria’s or directly against the
main criteria
19.5. INTEGRATION
None / Nil
19.8. WORKFLOW
Nil / None
19.9. DEVELOPMENTS
Nil / None
Cash
Cash Mgmt
Mgmt & &
Forecast
Forecast Date
Date
Payment Transactions
Cash Payment Program
Management
Balance
sheet Profit
& Loss
(P/L)
The system provides for the selection of passing the invoice for only the
goods/services or only the delivery costs like Freight, Clearing charges etc
or if the vendor is same then both the Goods/services and Delivery costs
bill can be passed together (if the vendor provides a single invoice )
If the vendor provides a single Invoice for multiple PO the same can be
passed
System shall provide the GRN details about the quantity and shall default
the prices from the PO. The user can change the prices based on the
invoices
In cases where the Advance has been paid before purchase order or at
the time of creating a purchase order then while making invoice
Raw materials and other materials like Coal have many quality
parameters and payment to the Vendors and Service providers is
dependent on them. Though Raw material quality certification is routed
through QM module, whether all the quality parameters could be taken
into consideration need to be explored.
As soon as you enter a sales order, you can initiate a dynamic availability
check of stocks on hand. When the delivery is created, the quantity to be
delivered is marked as "Scheduled for delivery". It is deducted from the
total stock when the goods issue is posted.
Purchasing maintains data on the vendors that are defined in the system
jointly with Financial Accounting. Information on each vendor is stored in
a vendor master record, which contains both accounting and
procurement information. The vendor master record represents the
creditor account in financial accounting.
FREQUEN
S.NO REPORTS CY SAP
1 List of Purchasing documents per As & Standard
Vendor/Purchasing Organization / Document When
Type / Item Category/ Account Assignment Required
Category / Plant / Supplying Plant / Purchasing
Group / Material / Delivery Date / Document
Number / Material Group / Vendor’s Material
Number/Project/Tracking Number
Apart from the standard reports provided by SAP, following are the
reports which are needed additionally by the core team members. These
reports would require additional efforts.