THIS IS FOR DILG-DPWH-DICT-DTI JMC 2018-01

Republic of the Philippines


City / Municipality of CABADBARAN
Province of AGUSAN DEL NORTE
OFFICE OF THE CITY BUILDING OFFICIAL

DOCUMENTARY REQUIREMENTS FOR BUILDING PERMIT APPLICATION


(Single Dwelling Residential / Commercial / Industrial / Others)

 Two (2) copies of Barangay Certification to Build  D) Mechanical Documents


 Two (2) copies of Tree Planting  E) Sanitary Documents
 F) Plumbing Documents
 Five (5) copies of filled up Unified Application Form  G) Electronics Documents
for Building Permit and FSEC  H) Geodetic Documents
 Four (4) copies of filled-up Application Form for  I) Fire Protection Plan (If applicable)
Locational /Zoning Clearance, Duly Notarized  Automatic Fire Suppression System
 Two (2) copies of Original Certificate of Title (OCT) /  Wet Stand Pipe
 Dry Stand Pipe
Transfer Certificate of Title (TCT), or Deed of  Kitchen Hood Suppression
Absolute Sale or Lot Locational Plan from LRA (if  Fire Detection & Alarm System
lessee, Contract of Lease), Proof of Ownership, if not
the Owner Provide Special Power of Attorney (SPA),
Vicinity Map  J) One (1) photocopy of each Valid Licenses (PRC
 Four (4) copies of Affidavit of Undertaking (Notarized) I.D.) & PTR of all involved professionals
 Five (5) sets of Survey Plans, design plans and other
documents as follows:
 A) Architectural Documents
 Three (3) copies of Notarized ESTIMATED value of
 B) Civil / Structural Documents the building / structure to be erected as declared by
- Structural Design Analysis the owner


- Soil Test (If applicable)
C) Electrical Documents
 Three (3) copies of Construction Safety and Health
- Electrical Design Analysis Program.

REMARKS:
 Complete Documents
 Incomplete Documents (Please comply documents with unchecked boxes.)
Name of Receiving Officer : _____________________________________
Date & Time Returned : _____________________________________
Signature of Applicant : _____________________________________

NOTES:
• All application forms are available in the OSCP and/or on the website.
 All the fully accomplished forms and requirements must be fastened in a LONG FOLDER except for the Drawing Plans and reports. ONLY A COMPLETE
AND COMPLIANT APPLICATION WILL BE ACCEPTED.
 Bring this Checklist with detachable Claim Stub when submitting your application.
Keep your CLAIM STUB at all times; “NO CLAIM STUB, NO RELEASE”

CLAIM STUB
Application No. : _________________________________________________
Time & Date Applied/Submitted : _________________________________________________
Return Date : _________________________________________________
Receiving Officer : _________________________________________________
(Signature over Printed Name)
Name of Applicant/Owner : ________________________________________________________________
Location of Project : ________________________________________________________________
Project Title : ________________________________________________________________
*For updates and inquiries, please call OCBO at nos. 818-7673 (landline/s) / 09123735577 (cellphone) within four (4) working days.
NOTE: Bring this claim stub upon claiming the Order of Payment/ Building Permit, FSEC & other documents.