470 MW
2 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
World Wide Experiences of Mitsubishi Gas Turbine
M501G
M501G× ×61
× 61 M501F
M501F× × 73
× 73 M501D
M501D× ×225
× 5
M701G
M701G× ×11
× 11 M701F
M701F× ×1116
× 16 M701D
M701D× ×91
× 91
M501J Total:72units
Total:72units Total:189units Total:
Total:189units 116units
Total:116units
M501J× ×17
× 17
M701J
M701J× ××22 Japan
Japan 186
186
Total:
Ireland 2 19units
Total:19units
Total
Total :: 585
585 units
units Asia
Asia 171
Middle
171
Middle East
East Africa
Africa 97
97
U.K. 13 Americas 90
Americas 90
Europe
Europe 39
Netherlands 4
39
Oceania
Oceania 77
Russia 1
Slovakia 2 China 27
27
Ukraine 5 Canada 4
Italy 5 Azerbaijan 2 Korea 24
Turkey 7 Uzbekistan 1
Spain 7 Japan 181 U.S.A. 53
Israel 1 Syria 4 Macau
Macau 3
Iran 11
Kuwait 4 Hong Kong 7
Algeria 6 India 10
Qatar 14
Egypt 6 Taiwan 22 Mexico 21 Dominica 1
Vietnam 3
Saudi Arabia 35
35 Philippines 7
U.A.E. 6
Malaysia 3 Honduras 1
Pakistan 1 Singapore 6
Nigeria 2 Thailand 26
Indonesia 25 As of Feb./2012
Bangladesh 5 Peru 3
Australia 6
Chile 2 Argentin
New Zealand 1 a5
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
3 /22
Evolution of Mitsubishi Gas turbine
4 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Gas Turbine
5 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Design Feature of Mitsubishi Gas Turbine
PROVEN FEATURES
6 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Proven Design Features
7 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Performance Enhancement (50 Hz)
400
398
55 359 334
335
300 324
M701DA 270
ISO Standard (1 on 1)
9 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Special Features of M701F5
Banking on the successful commercial operating experience of the
M701F4, Mitsubishi upgraded M701F5 which can achieve over 61%
of Combined Cycle Plant efficiency.
G2(50Hz)
F Series (1400ºC)
Steam Cooled Comb.
F4(50Hz) G1(60Hz)
M701F5 Gas Turbine
F3 G
F4 Technology
12 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Fabrication and Transportation of M701F4
13 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Commissioning Phase (1)
Year 2010
March 24: Initial synchronization
April 26: 100% load achievement
June 21: 100% Load Rejection Test achieved.
14 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Japan/ Tohoku Electric Power CO.
Unit NO.4, Sendai Thermal Power Station
Power Output
Gas Turbine 297 MW
Steam Turbine 149 MW
Total 446 MW
Configuration
Single-Shaft Configuration
1 GT + 1 HRSG + 1 ST
Commercial Operation
29 July 2010
Successful operational records
6200 AOH (Actual Operation Hours) as on 1-Mar-2012
Daily start and stop operation has been applied
No trip has been occurred
Plant is stopped when Tohoku Earthquake/ Tsunami
hit Japan on 11-Mar-11
Sendai has been restarted since 16-Dec-11. Now it is
under commissioning 15 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Facade of Sendai Power Station
16 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Turkey/Enerjisa Bandirma Combined Cycle Power Plant
Power Output
Gas Turbine 304 MWx2
Steam Turbine 328 MW
Total 936 MW
Configuration
Multi-Shaft configuration
2 GT + 2 HRSG + 1 ST
Commercial Operation
4Q.2010
18 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Update of J Class Gas Turbine
19 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
Design Features of “J”
Combustor
Proven G Combustor
- Well experienced ULN combustor
- Steam cooled liner
Turbine
Compressor Proven G Turbine
Validated H Compressor + National Project technologies
- 23:1 pressure ratio - Advanced TBC + Cooling
- 3D profile - High efficient aerodynamic technology
- Improved inlet duct - Cooled row4 blade
20 /22
© 2012 MITSUBISHI POWER SYSTEMS INDIA PVT , LTD. All rights reserved.
J Class Gas Turbine To the Market
Manufacturing
T point Commercial Operation
Commissioning
M 701J Manufacturing
Installation Operation starts
First unit for
D om estic P J
21 /22