Sei sulla pagina 1di 1

Sta. 0+480 Sta.

0+560

5.2m 0.5m
5.2m Elev. 0.01
Elev. 0.035 Elev. -0.003 Elev. -0.01
LEGENDS:

Embankment -
4.00m 4.00m

Earth -

Concrete -

311(1)b P.C.C.P. 200mm Thk Area = 1.0475 sqm. 311(1)b P.C.C.P. 200mm Thk Area = 0.9 sqm.
Aggregate Base Course -
201(1) Sub-base 100mm Thk Area = 0.6236 sqm. 201(1) Sub-base 100mm Thk Area = 0.4657 sqm.
104(2)a Selected Borrow Area = 1.0914 sqm. 104(2)a Selected Borrow Area = 0.2501 sqm.
505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm.
Sta. 0+500 Sta. 0+580

5.2m 5.2m 0.5m

Elev. -0.02
Elev. -0.055 Elev. -0.05 Elev. -0.085

4.00m 4.00m

311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm.


201(1) Sub-base 100mm Thk Area = 0.5816 sqm.
104(2)a Selected Borrow Area = 0.5293 sqm.
311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm.
201(1) Sub-base 100mm Thk Area = 0.5836 sqm.
104(2)a Selected Borrow Area = 1.2113 sqm.
505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm.
Sta. 0+520 Sta. 0+600

5.2m 5.2m 0.5m

Elev. 0.06 Elev. 0.032 Elev. 0.015


Elev. 0

4.00m 4.00m

311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm. 311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm.
201(1) Sub-base 100mm Thk Area = 0.5696 sqm. 201(1) Sub-base 100mm Thk Area = 0.5436 sqm.
104(2)a Selected Borrow Area = 1.0563 sqm. 104(2)a Selected Borrow Area = 1.2608 sqm.
505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm. 505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm.
Sta. 0+540 Sta. 0+620
0.3m

5.2m 0.5m 0.3m 5.2m 0.5m

Elev. 0.037 Elev. 0.032 Elev. 0.067 Elev. 0.012

4.00m 4.00m

0.5m

311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm. 0.8m 311(1)b P.C.C.P. 200mm Thk Area = 1.04 sqm.
201(1) Sub-base 100mm Thk Area = 0.5236 sqm. 201(1) Sub-base 100mm Thk Area = 0.6236 sqm.
104(2)a Selected Borrow Area = 1.0656 sqm. 104(2)a Selected Borrow Area = 1.2431 sqm.
505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm. 505(5)a Grouted Riprap (Class "A") Area = 1.2412 sqm.

PREPARED BY: CHECKED: REVIEWED: RECOMMENDED: APPROVED: PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.

VARIOUS DPWH
PROPOSED PROJECTS
EML CONSTRUCTION & 12
AS STAKED PLAN TRADING
ELMER F. ARELLANO
PROJECT ENGINEER
REGIONAL OFFICE NO. 3 CONSTRUCTION/IMPROVEMENT OF ROADS
CROSS SECTION
DALMACIO B. CRUZ, JR. GERONIMO F. ASONZA RUEL V. ANGELES WITH SLOPE PROTECTION BRGY. SAN JUAN -
SINDALAN, CITY OF SAN FERNANDO
PAMPANGA
BULACAN 1ST DISTRICT ENGINEERING OFFICE
Tikay, City of Malolos Bulacan CHIEF, PLANNING AND DESIGN
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER
DATE:
BRGY. TAAL, BOCAUE, BULACAN. 34