NOTICE OF TAKING
ERNESTO M. ZAMORA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NORMA M. MONTAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
FELICISIMO B. MACEDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ALWIN M. NIMO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ELENA R. MACEDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JAIME MADREDEO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
VIRGINIA M. MACEDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JAIME MEDES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ARCELI MILLENA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SONIA MILLENA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROMEO M. MADRIDEO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DELIA R. LLEVA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
INGLESIA NI CRISTO
Anislag, Daraga, Albay
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ALICIA M. DE ASIS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
CESAR M. VELASCO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ARIEL L. MALLETE
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
CELESTINO M. MALLORCA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SHELA MARAVILLO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
LISA R. BAILON
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MINARDO LOPEZ
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SALVACION M. MEDIAVILLO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GERLIE MAJADILLAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NOMER NEO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
CERILO L. LLONA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
WILFREDO BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MICHELLE J. NOVENO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EDWARDO M. MENDOZA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ZENAIDA MORCOSO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GLENN M. MONTELLANO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSE BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EVELYN M. QUISAM
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
REYNALDO M. MONTELLANO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MANUEL MARCHAN
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Roderick LlevaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
RODERICK LLEVA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Gemma MartinezRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GEMMA L. MARTINEZ
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ma'am/Sir, TESDARepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
TESDA
Anislag, Daraga, Albay
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Regina Bajamundi Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
REGINA M. BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Moises MirallesRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MOISES R. MIRALLES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ma'am/Sir, 1924 CaféRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
1924 Café
Anislag, Daraga, Albay
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Merian Llarena Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MERIAN L. LLARENA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Romeo LlabaresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROMEO R. LLABARES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Elisa Pelayo Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nancy Lona BaseRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Gudorita LlagunoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GUDORITA N. LLAGUNO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Jocelyn MillalosRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOCELYN M. MILLALOS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Salvador Bajamundi Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SALVADOR M. BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Romel MagdaongRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROMEL MAGDAONG
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Teofilo MacedaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
TEOFILO MACEDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Antonio MacasinagRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ANTONIO MACASINAG
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Casimiro MagdaongRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
CASIMIRO MAGDAONG
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Fe MargalloRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
FE LL. MARGALLO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Gerardo LanosaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GERARDO LANOSA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Agnes MargalloRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
AGNES MARGALLO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Bernardo MargalloRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
BERNARDO MARGALLO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Emma LlarenaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EMMA B. LLARENA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Danilo BintongRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DANILO BINTONG
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Emma LlarenaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EMMA B. LLARENA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ariel BajamundiRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ARIEL BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Aidar LlagunoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
AIDAR LLAGUNO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nolan OtomRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NOLAN F. OTOM
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Isidro Geraldino CantesRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Margie VelascoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MARGIE M. VELASCO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Erlinda MonrealRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ERLINDA V. MONREAL
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Darius MisolasRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DARIUS L. MISOLAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Analiza Matamorosa Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ANALIZA A. MATAMOROSA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Vicenete Delos ReyesRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nenita LarezaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NENITA G. LAREZA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Rodito Maristela Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
RODITO N. MARISTELA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Yolanda LoteriñaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
YOLANDA LOTERIÑA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Joseph MacedaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSEPH L. MACEDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Leticia Concepcion Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
LETICIA CONCEPCION
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Agnes CastillarRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
AGNES L. CASTILLAR
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Elvie AbenRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ELVIE N. ABEN
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Antonio LotivioRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ANTONIO D. LOTIVIO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Sabrina LotivioRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SABRINA M. LOTIVIO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Remedios MirandaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
REMEDIOS L. MIRANDA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Lyndsey LlanetaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
LYNDSEY S. LLANETA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Presco MarinayRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Francisca Marbella Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
FRANCISCA M. MARBELLA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Joseph BajamundiRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSEPH BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Genny LunaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
GENNY M. LUNA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Evelyn BajamundiRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EVELYN G. BAJAMUNDI
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ma'am/Sir, Bejer Basco FuneralRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Merle BitancurRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MERLE M. BITANCUR
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Clarita LosiñadaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
CLARITA M. LOSIÑADA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Eddie LuchavezRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EDDIE LUCHAVEZ
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Reynante NovenoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
REYNANTE G. NOVENO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Marvic Marbella Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MARVIC E. MARBELLA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ma'am/Sir, Our Lady of Salvation ParishRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
Dear Ma'am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Janet Madronio Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JANET L. MADRONIO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Myshell NievaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MYSHELL L. NIEVA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Salvador Lozardo Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SALVADOR C. LOZARDO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ronald MarañoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
RONALD M. MARAÑO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Joselito AlzagaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSELITO M. ALZAGA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Doris PorrasRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DORIS A. PORRAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ariel LisayRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ARIEL M. LISAY
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Roberto MarañoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROBERTO M. MARAÑO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Aida AytonaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
AIDA A. AYTONA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ma. Christina LecsonRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Siony MarañoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
SIONY G. MARAÑO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Marsie SaynoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MARSIE L. SAYNO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nimfa MarquiñaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NIMFA MARQUIÑA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Aurea AltavanoRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
AUREA B. ALTAVANO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Romeo LlabresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROMEO R. LLABRES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Ronie BulawanRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
RONIE L. BULAWAN
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Noel LunaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NOEL A. LUNA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Emily LlamesRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
EMILY B. LLAMES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Anacleto SevillaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ANACLETO L. SEVILLA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nonito Jacob Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NONITO A. JACOB
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Rolando Jacob Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROLANDO M. JACOB
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Armando MisolasRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ARMANDO J. MISOLAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Dioscoro MisolasRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DIOSCORO J. MISOLAS
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Marlyn ObreroRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MARLYN G. OBRERO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Nelly PerezRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NELLY A. PEREZ
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Benjamin AndesRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Alwin LunaRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ALWIN M. LUNA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Francisco LlabresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Feloteo LlabresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lots/properties located in barangay Anislag in the municipality of
Daraga, Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
NOTICE OF TAKING
Feloteo LlabresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
ANABELLE M. BORNILLA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Feloteo LlabresRepublic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSEPHINE M. MILLETE
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JANICE M. TORRES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JOSEPHINE BASCULADO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
ROLANDO D. CABILDO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
DOMINADOR C. LUNA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
NELSON M. LUNA
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
JESUS E. DERILO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
MIRIAM MARCO
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
LORETO LLABRES
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
THE PRINCIPAL
ANISLAG NATIONAL HIGH SCHOOL
Anislag, Daraga, Albay
Dear Ma’am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
NOTICE OF TAKING
LEONOR B. VELEZ
Anislag, Daraga, Albay
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL
NOTICE OF TAKING
Norma Montas Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. V
Regional Government Center, Rawis, Legazpi City
BARANGAY CAPTAIN
Anislag, Daraga, Albay
Dear Ma’am/Sir,
May we respectfully inform you that the government is undertaking the above-named project
which would affect your lot/property located in barangay Anislag in the municipality of Daraga,
Albay.
In view thereof, we express the government’s intention to acquire the affected lot/property
through negotiated sale pursuant to the provisions of Republic Act 10752 or “The Right of Way
Act.”
Thus, may we kindly request you to submit the following documents as proof of ownership of
the lot/property which are necessary for the determination and payment of just compensation:
Upon submission of the above-mentioned documents, we will send you a letter-offer setting the
appropriate price for the purchase of the affected lot/property. If, however, you fail to submit
the required documents within 30 days from receipt of this notice of taking, this Office will be
constrained to file an expropriation case to the appropriate court to obtain the said property.
Please be reminded that in accordance with the provisions of R.A. 10752, no development or
construction is allowed within 2 years from the date of this Notice of Taking within the Right of
Way unless allowed by the Regional Director of this Office for justifiable reasons.
If you have further questions, you may visit our office and look for Engr. Bernardo B. Orobia
(w/ cp no. 09999926441) or Engr. Mark Elbert A. Mongo (w/ cp no. 09108280335), Staffs of
ESROW (Environmental, Social, and Right-of-Way) Section, Planning and Design Division and
we will gladly explain the processes that you will undertake involving the acquisition of your
lot/property.
RO5.1 AJBD/MEAM/BBO/BMF/MNL