TOPICS TO BE COVERED IN THESE MODULES:
PROCUREMENT OVERVIEW
PREQUALIFICATION, EOI
PPRA RULES
GUARANTY, INDEMNITY
LETTER OF CREDIT
WHY STUDY PROCUREMENT & CONTRACT ADMINISTRATION?
Prequalify/ Prequalify/
EOI EOI
IFB/RFP IFB/RFP
LOA(AWARD) LOA(AWARD)
PREQUALIFICATION OF CONSTRUCTORS (PEC GUIDELINES)
1 Work Experience 35
2 Financial Soundness 35
3 Personnel Capabilities 20
4 Equipment Availability 10
Details
TYPES OF BIDDING DOCUMENTS
http://www.pec.org.pk/Downloads.aspx#biddocs
2
Y,00.html
World Bank
Goods, Works, Services
4 JICA Works,?
PPRA RULES ( WWW.PPRA.ORG.PK)
43 Payments 22
49 Arbitration 24
50 Mis-procurement 24
Terminology:
1. Creditor
2. Principal debtor
3. Guarantor or Surety
GUARANTY(CONTRACT)
1. The Principal Debtor :
Anyone owing an obligation to another person under a contract
is a Debtor of such obligation(the one for whom guaranty is
given)
2. The Creditor:
Anyone to whom an obligation is owed under a contract is called
a Creditor of such obligation.
Suretyship(Tri-Partite agreement):
It is contract in the form of a joint undertaking of the Surety and
the Principal Debtor with the Creditor.
Performance Security/Guaranty
Back