Vendor Name:
PO Number:
ASB – As Built
Date: Sign:
Review does not constitute acceptance of design details, calculations, test methods or materials developed or selected by
Vendor/Contractor nor does it relieve Vendor/Contractor from full compliance with contractual or other obligations or responsibilities.
DUQM BUNKER TERMINAL PROJECT
T-25-2018-01-PE-DAS-1052
OOMCO
REV Date DESCRIPTION Prepared by Checked by
Approved by Signature
1 18-11-19 Issued for Review RAVI VINOJ.J
Approved for
2 05-03-20 RAVI VINOJ.J
Construction
DUQM BUNKER TERMINAL PROJECT
Environment Corrosive/ errosive Operation Type Streamlined Flow path ( low pressure drop)
Gasket SPRL WND , SS316L WDG GPH FLR , SS 316L INR & CS OTR RING (4.5mm)
Type Float Actuated Pilot Operated Mounting Plate A 105 Carbon Steel
0 RV JV 17-11-2019 IDC
Gasket SPRL WND , SS316L WDG GPH FLR , SS 316L INR & CS OTR RING (4.5mm)
Type Float Actuated Pilot Operated Mounting Plate A 105 Carbon Steel
3) Vendor should confirm the suitable material of construction for the service indicated.
4) Hydrostatic body test as per manfacture std and test pressure shall be as per ASME B31.3
5) Mesh to be confirmed by vendor based on Flow Rate , Pressure Drop & Service
6) Reference:
0 RV JV 17-11-2019 IDC