Sei sulla pagina 1di 21

SC-BALINAGAY BUILDERS K.M.

120 NUEVA ECIJA AURORA ROAD, BRGY. LOURDES, CABANATUTAN CITY

UNIT
DESCRIPTION OF MATERIALS QUANTITY UNIT
COST
TOTAL COST

REINFORCEMENT
FOUNDATION ( FOOTING F1 )
16mm DIA. BARS @ 6.0m 51.00 PCS 376.00 19176.00
TIE WIRE 8.40 KG 84.00 705.60
FOUNDATION ( FOOTING F2 )
16mm DIA. BARS @ 6.0m 11.00 PCS 376.00 4136.00
TIE WIRE 2.00 KG 84.00 168.00
WALL FOOTING ( WFT )
10mm DIA. BARS @ 6.0m 47.00 PCS 127.00 5969.00
TIE WIRE 4.00 KG 84.00 336.00
TIE BEAM ( FTB )
16mm DIA. BARS @ 6.0m 186.00 PCS 376.00 69936.00
10mm DIA. BARS @ 6.0m 134.00 PCS 127.00 17018.00
TIE WIRE 25.60 KG 84.00 2150.40
BEAM (B-1)
16mm DIA. BARS @ 6.0m 201.00 PCS 376.00 75576.00
10mm DIA. BARS @ 6.0m 105.00 PCS 127.00 13335.00
TIE WIRE 31.50 KG 84.00 2646.00
BEAM (B-2)
16mm DIA. BARS @ 6.0m 62.00 PCS 376.00 23312.00
10mm DIA. BARS @ 6.0m 48.00 PCS 127.00 6096.00
TIE WIRE 7.00 KG 84.00 588.00
CROSS BEAM (C-B)
16mm DIA. BARS @ 6.0m 8.00 PCS 376.00 3008.00
10mm DIA. BARS @ 6.0m 8.00 PCS 127.00 1016.00
TIE WIRE 1.40 KG 84.00 117.60
ROOF BEAM ( RB )
16mm DIA. BARS @ 6.0m 160.00 PCS 376.00 60160.00
10mm DIA. BARS @ 6.0m 139.00 PCS 127.00 17653.00
TIE WIRE 21.70 KG 84.00 1822.80
COLUMN 1 ( C-1 ) G-F
16mm DIA. BARS @ 6.0m 132.00 PCS 376.00 49632.00
10mm DIA. BARS @ 6.0m 107.00 PCS 127.00 13589.00
TIE WIRE 12.10 KG 84.00 1016.40
COLUMN 1 ( C-2 ) G-F
16mm DIA. BARS @ 6.0m 19.00 PCS 376.00 7144.00
10mm DIA. BARS @ 6.0m 19.00 PCS 127.00 2413.00
TIE WIRE 2.30 KG 84.00 193.20
COLUMN 1 ( C-3 ) G-F
16mm DIA. BARS @ 6.0m 12.00 PCS 376.00 4512.00
10mm DIA. BARS @ 6.0m 19.00 PCS 127.00 2413.00
TIE WIRE 2.30 KG 84.00 193.20
COLUMN 1 ( C-1 ) 2ND-F
16mm DIA. BARS @ 6.0m 88.00 PCS 376.00 33088.00
10mm DIA. BARS @ 6.0m 60.00 PCS 127.00 7620.00
TIE WIRE 6.80 KG 84.00 571.20
TWO-WAY SLAB ( S2 )
10mm DIA. BARS @ 6.0m (L) 384.00 PCS 127.00 48768.00
TIE WIRE 35.00 KG 84.00 2940.00
ONE-WAY SLAB ( S1 )
10mm DIA. BARS @ 6.0m (L) 28.00 PCS 127.00 3556.00
TIE WIRE 3.00 KG 84.00 252.00
GROUND SLAB
10mm DIA. BARS @ 6.0m (L) 63.00 PCS 127.00 8001.00
10mm DIA. BARS @ 6.0m (W) 63.00 PCS 127.00 0.00
TIE WIRE 17.00 KG 84.00 1428.00
STAIRS
12mm DIA. BARS @ 6.0m 11.00 PCS 186.00 2046.00
10mm DIA. BARS @ 6.0m 14.00 PCS 127.00 1778.00
16mm DIA. BARS @ 6.0m 9.00 PCS 376.00 3384.00
10mm DIA. BARS @ 6.0m 6.00 PCS 127.00 762.00
TIE WIRE 2.50 KG 84.00 210.00
CHB REINFORCEMENT FOR BACKFILL
10mm DIA. BARS @ 6.0m 27.00 PCS 127.00 3429.00
10mm DIA. BARS @ 6.0m 27.00 PCS 127.00 3429.00
TIE WIRE 4.00 KG 84.00 336.00
CHB REINFORCEMENT FOR GROUND FLOOR
10mm DIA. BARS @ 6.0m 42.00 PCS 127.00 5334.00
10mm DIA. BARS @ 6.0m 42.00 PCS 127.00 5334.00
TIE WIRE 5.00 KG 84.00 420.00
CHB REINFORCEMENT FOR 2ND FLOOR
10mm DIA. BARS @ 6.0m 55.00 PCS 127.00 6985.00
10mm DIA. BARS @ 6.0m 59.00 PCS 127.00 7493.00
TIE WIRE 9.70 KG 84.00 814.80

FORM WORKS AND


SCAFFOLDINGS
TIE BEAM ( FTB )
TOTAL BOARD FEET 672 BD. FT.
TOTAL NUMBER OF LUMBER 168 PCS 65 10920
TOTAL NUMBER OF PLYWOOD 24 SHEETS 350 8400
TOTAL NO. OF 2 1/2 CW NAILS 5.5 KG 130 715
TOTAL NO. OF FINISHING NAIL 2.3 KG 121 278.3
COLUMN GROUND FLOOR
TOTAL BOARD FEET 563.75 BD. FT.
TOTAL NUMBER OF LUMBER 141 PCS 65 9165
TOTAL NUMBER OF PLYWOOD 19 SHEETS 350 6650
TOTAL NO. OF 2 1/2 CW NAILS 4.4 KG 130 572
TOTAL NO. OF FINISHING NAIL 1.8 KG 121 217.8
COLUMN 2ND FLOOR
TOTAL BOARD FEET 412.65 BD. FT.
TOTAL NUMBER OF LUMBER 134 PCS 65 8710
TOTAL NUMBER OF PLYWOOD 18 SHEETS 350 6300
TOTAL NO. OF 2 1/2 CW NAILS 4.1 KG 130 533
TOTAL NO. OF FINISHING NAIL 1.7 KG 121 205.7
BEAM 2ND FLOOR
TOTAL BOARD FEET 728 BD. FT.
TOTAL NUMBER OF LUMBER 182 PCS 65 11830
TOTAL NUMBER OF PLYWOOD 26 SHEETS 350 9100
TOTAL NO. OF 2 1/2 CW NAILS 5.9 KG 130 767
TOTAL NO. OF FINISHING NAIL 2.5 KG 121 302.5
ROOF BEAM
TOTAL BOARD FEET 588 BD. FT.
TOTAL NUMBER OF LUMBER 147 PCS 65 9555
TOTAL NUMBER OF PLYWOOD 21 SHEETS 350 7350
TOTAL NO. OF 2 1/2 CW NAILS 4.7 KG 130 611
TOTAL NO. OF FINISHING NAIL 2 KG 121 242
2ND FLOOR SLAB
TOTAL FLOOR AREA 90 SQ.M 125
COST MULTIPLIER 1 13 857 550 41250
COST MULTIPLIER 2 75 120 102840

CONCRETING
FOUNDATION ( FOOTING F1 )
BAGS OF CEMENT 67.00 BAGS 225.00 11700
VOL. OF SAND 3.80 CU.M 600.00 2280
VOL. OF 3/4 CRUSHED 7.50 CU.M 780.00 5850
TOTAL VOL. OF MIX 7.44 CU.M
WALL FOOTING ( WFT )
BAGS OF CEMENT 52.00 BAGS 225.00 11700
VOL. OF SAND 2.90 CU.M 600.00 1740
VOL. OF 3/4 CRUSHED 5.80 CU.M 780.00 4524
TOTAL VOL. OF MIX 5.76 CU.M
GROUND SLAB
BAGS OF CEMENT 129.00 BAGS 225.00 29025
VOL. OF SAND 7.20 CU.M 600.00 4320
VOL. OF 3/4 CRUSHED 14.30 CU.M 780.00 11154
TOTAL VOL. OF MIX 14.25 CU.M
TWO-WAY SLAB ( S2 )
BAGS OF CEMENT 81.00 BAGS 225.00 5304
VOL. OF SAND 4.50 CU.M 600.00 2700
VOL. OF 3/4 CRUSHED 9.00 CU.M 780.00 7020
TOTAL VOL. OF MIX 9.00 CU.M
COLUMN 1 ( C1 ) GROUND FLOOR
BAGS OF CEMENT 51.00 BAGS 225.00 11475
VOL. OF SAND 2.90 CU.M 600.00 1740
VOL. OF 3/4 CRUSHED 5.70 CU.M 780.00 4446
TOTAL VOL. OF MIX 5.84 CU.M
COLUMN 2 ( C2 ) GROUND FLOOR
BAGS OF CEMENT 8.00 BAGS 225.00 1800
VOL. OF SAND 0.50 CU.M 600.00 300
VOL. OF 3/4 CRUSHED 0.90 CU.M 780.00 702
TOTAL VOL. OF MIX 0.82 CU.M
COLUMN 3 ( C3 ) GROUND FLOOR
BAGS OF CEMENT 9.00 BAGS 225.00 2025
VOL. OF SAND 0.50 CU.M 600.00 300
VOL. OF 3/4 CRUSHED 1.00 CU.M 780.00 780
TOTAL VOL. OF MIX 0.92 CU.M
COLUMN 1 ( C1 ) 2ND FLOOR
BAGS OF CEMENT 32.00 BAGS 225.00 7200
VOL. OF SAND 1.80 CU.M 600.00 1080
VOL. OF 3/4 CRUSHED 3.60 CU.M 780.00 2808
TOTAL VOL. OF MIX 3.52 CU.M
TIE BEAM ( FTB )
BAGS OF CEMENT 57 BAGS 225.00 12825
VOL. OF SAND 3.2 CU.M 600.00 1920
VOL. OF 3/4 CRUSHED 6.3 CU.M 780.00 4914
TOTAL VOL. OF MIX 6.24 CU.M
BEAM 1 ( B1 )
BAGS OF CEMENT 58 BAGS 225.00 13050
VOL. OF SAND 3.2 CU.M 600.00 1920
VOL. OF 3/4 CRUSHED 6.4 CU.M 780.00 4992
TOTAL VOL. OF MIX 6.39 CU.M
BEAM 2 ( B2 )
BAGS OF CEMENT 19 BAGS 225.00 4275
VOL. OF SAND 1.1 CU.M 600.00 660
VOL. OF 3/4 CRUSHED 2.2 CU.M 780.00 1716
TOTAL VOL. OF MIX 2.1 CU.M
CROSS BEAM (C-B)
BAGS OF CEMENT 3 BAGS 225.00 675
VOL. OF SAND 0.2 CU.M 600.00 120
VOL. OF 3/4 CRUSHED 0.3 CU.M 780.00 234
TOTAL VOL. OF MIX 0.3 CU.M
ROOF BEAM ( RB )
BAGS OF CEMENT 84 BAGS 225.00 18900
VOL. OF SAND 3.4 CU.M 600.00 2040
VOL. OF 3/4 CRUSHED 6.8 CU.M 780.00 5304
TOTAL VOL. OF MIX 6.74 CU.M
STAIRS
BAGS OF CEMENT 18 BAGS 225.00 4050
VOL. OF SAND 1 CU.M 600.00 600
VOL. OF 3/4 CRUSHED 2 CU.M 780.00 1560
TOTAL VOL. OF MIX 1.96 CU.M

MASONRY
CHB LAYING
TOTAL AREA 409.3 SQ.M
NO. 6 CHB 5843.00 PCS 13.00 75959
BAGS OF CEMENT 415.00 BAGS 225.00 93375
VOL. OF SCREEN SAND 34.70 CU.M 500.00 17350
PLASTERING
TOTAL AREA 376.30 SQ.M
BAGS OF CEMENT 284.00 BAGS 225.00 63900
VOL. OF FINE SAND 13.20 CU.M 500.00 6600
TOTAL 257184

TRUSS & ROOFING


TRUSSES 142 SQ.M 350 49700
LONG SPAN ROOF 142 SQ.M 750 106500
CEILING
GROUND FLOOR 94.00 89.30 SQ.M 67131.3 100696.9125
2ND FLOOR 81.00 76.95 SQ.M 57847.2 86770.74375

ELECTRICAL
GROUND FLOOR
CONVINIENCE OUTET 15 750 11250
LIGHTING OUTLET 13 750 9750
FIN LIGTH 25 350 8750
SWITCH 8 750 6000
ACU OUTLET 1 850 850
REF OUTLET 1 850 850
POWER BOX 1 10000 10000
2ND FLOOR 64 47450
CONVINIENCE OUTET 14 750 2550
LIGHTING OUTLET 28 750 21000
FIN LIGTH 25 350 8750
SWITCH 9 750 6750
ACU OUTLET 3 850 2550
REF OUTLET 0 850 0
POWER BOX 1 10000 10000
4 12550

PLUMBING
COMFORT ROOM 3 UNITS 37600 112800
KITCHEN COUNTER 2 UNITS 37600 75200
GROUND FLOOR
DOORS
SOLID PANEL DOOR 2 UNITS 10000 20000
PVC DOOR TYPE 3 UNITS 3760 11280
SLIDING DOOR 1 UNITS 13760 13760
SLIDING DOOR 2 UNITS 9500 19000
ROOMPANEL DOOR 8 UNITS 8000 64000
WINDOWS
WINDOW 1 4 UNITS 9500 38000
WINDOW 2 2 UNITS 8000 16000
WINDOW 3 5 UNITS 6000 30000
WINDOW 4 2 UNITS 6000 12000
WINDOW 5 3 UNITS 4500 13500
WINDOW 6 1 UNITS 3500 3500
2ND FLOOR 241040

FINISHING
TILES
GROUND FLOOR
60 X 60 GRANITE TILE 263 PCS 376.97 99143.11
CEMENT MORTAR 8 BAGS 454.67 3637.36
WHITE CEMENT 45 KGS 35 1575
ADHESIVE 10 BAGS 710.5 7105
2ND FLOOR 111460.47
60 X 60 GRANITE TILE 205 PCS 376.97 77278.85
CEMENT MORTAR 7 BAGS 454.67 3182.69
WHITE CEMENT 35 KGS 35 1225
ADHESIVE 8 BAGS 710.5 5684
KITCHEN COUNTER 87370.54
KITCHEN GRANITE 5 PCS 7500 37500
CEMENT MORTAR 1 BAGS 454.67 454.67
WHITE CEMENT 20 KGS 35 700
ADHESIVE 4 BAGS 710.5 2842
41496.67

PAINTING
GROUND FLOOR
PAINT AREA 409.3 27 81 1950 157950
2ND FLOOR 112557.5
PAINT AREA 376.30 27 81 1950 157950
GROUND FLOOR CEILING 103482.5
PAINT AREA 90 13 39 1257 49023
2ND FLOOR CEILING 16830
PAINT AREA 70.00 7 21 1257 26397
13090
DOORS AND DOOR JAMB 16 UNITS 3000 48000
75420
K.M.
TAN CITY

LABOR
COST

19881.60 10636.6

4304.00 2294.16

6305.00 3846.48

89104.40
38792.2
10966.6

91557.00
41920.6
8593.2

29996.00
12930.7
3928.32

4141.60
1668.48
654.72

79635.80
33369.6
11375.8

64237.40
27529.9
8756.88

9750.20
3962.64
1554.96

7118.20
2502.72
1554.96

41279.20
18353.3
4910.4

51708.00
31426.6

3808.00
2291.52

9429.00
5155.92
5155.92

8180.00
1292.28
1145.76
1877.04
491.04

7194.00
2209.68
2209.68

11088.00
3437.28
3437.28

15292.80
4501.2
4828.56

20313.3

16387
15543

21697

17516

144090

19830

17964

44499

15024
17661

2802

3105

11088

19659

19962

6651

1029

26244

9315
186684

70500

49700
106500

100696.9125
86770.74375

47450 22400

12550 1400

188000
241040

111460.47

41496.67

115 47069.5 90344

115 43274.5

115 10350 18400

115 8050

2300 36800
216040 47069.5
29920 43274.5
SC BALINAGAY BUILDERS
Km. 120 NE Aurora Rd., Lourdes, Cabanatuan City

PROJECT : PROPOSED TWO STORREY 4 BEDROOM RESIDENTAIL BUILDING


Location : SAN MIGUEL NA MUNTI TALAVERA, NUEVA ECIJA
Owner : MRS. DITSKY BULACLAC EULORIA

MATERIALS & LABOR COST BREAKDOWN

PROGRAM OF WORKS MATERIALS LABOR


I (PLANS & PERMITS) 74,600.00
* MOBILIZATION & LAYOUT 27,500.00
II DEMOLITION AND HAULING
A. DEMOLITION 85,000.00
B. HAULING 23,500.00
III EARTHWORKS
A. EXCAVATION 44,689.75
B. BACKFILL 7,138.84
C. EARTHFILL
BLDG. ( 1.00m ) 35,979.00 10,793.70
IV REBAR WORKS
A. FOUNDATION
* FOOTING 24,185.60 12,930.72
* TIE BEAM ( FTB ) 89,104.40 49,758.72
* WALL FOOTING 6,305.00 3,846.48
B. COLUMN
* GROUND FLOOR 81,105.80 45,862.08
* 2ND FLOOR 41,279.20 23,263.68
C. BEAMS
* 2ND FLOOR 125,694.60 69,696.00
* ROOF BEAM 79,635.80 44,745.36
D. SLAB
* GROUND FLOOR ( ON FILL ) 9,429.00 10,311.84
* 2ND FLOOR 55,516.00 33,718.08
E. STAIRS
* GF - 2F 8,180.00 4,806.12
F. CHB REINFORCEMENT
* GROUND FLOOR 18,282.00 11,293.92
* 2ND FLOOR 15,292.80 9,329.76
V. FORM WORKS
A. TIE BEAM ( FTB ) 20,313.30 18,144.00
B. COLUMN
* GROUND FLOOR 16,387.00 15,221.25
* 2ND FLOOR 15,543.00 11,141.55
C. BEAMS
* 2ND FLOOR 21,697.00 19,656.00
* ROOF BEAM 17,516.00 15,876.00
D. SLAB
* 2ND FLOOR 144,090.00 2,430.00
E. STAIRS
* GF - 2F 5,000.00 2,250.00
VI. CONCRETE WORKS
A. FOUNDATION
* FOOTING 19,830.00 26,040.00
* TIE BEAM ( FTB ) 19,659.00 21,840.00
* WALL FOOTING 17,964.00 20,160.00
B. COLUMN
* GROUND FLOOR 23,568.00 26,530.00
* 2ND FLOOR 11,088.00 12,320.00
C. BEAMS
* 2ND FLOOR 27,642.00 30,765.00
* ROOF BEAM 26,244.00 23,590.00
D. SLAB
* GROUND FLOOR ( ON FILL ) 44,499.00 49,875.00
* 2ND FLOOR 15,024.00 31,500.00
E. STAIRS
* GF - 2F 9,315.00 6,860.00
VII. MASONRY WORKS
A. CHB LAYING
* GROUND FLOOR AND 2ND 186,684.00 92,092.50
FLOOR
B. PLASTERING
* GROUND FLOOR AND 2ND 70,500.00 84,667.50
FLOOR
VIII. TRUSS & ROOFING
A. TRUSSES 49,700.00 19,880.00
B. LONGSPAN 106,500.00 42,600.00
C. CEILING
* GROUND FLOOR 100,696.91 40,278.77
* 2ND FLOOR 86,770.74 34,708.30
D. INSULATION 34,708.30 8,677.07
IX. ELECTRICAL
A. GROUND FLOOR 47,450.00 22,400.00
B. 2ND FLOOR 12,550.00 1,400.00
C. SYSTEM BREAKER 50,000.00 12,500.00
X. PLUMBING
A. GROUND FLOOR 28,700.00 11,480.00
B. 2ND FLOOR 36,200.00 14,480.00
C. FIXTURES 188,000.00 75,200.00
D. STORM DRAINAGE 47,000.00 18,800.00
E. SEPTICTANK 28,000.00 11,200.00
XI. DOORS & WINDOWS
A. GROUND FLOOR & SECOND FLOOR 241,040.00 60,260.00
XII. FINISHING
A. TILEWORKS
* KITCHEN GRANITE 41,496.67 18,673.50
* GF AND 2F 111,460.47 45,920.00
B. PAINTING
* WALLS 216,040.00 183,634.00
* CEILING 75,420.00 64,107.00
* DOOR AND DOOR JAMB 48,000.00 40,800.00
C. GUARDRAILS 75,000.00 22,500.00
D. CARPENTRY 268,000.00 107,200.00
XIII. MISCELLANEOUS 125,000.00
SUB-TOTAL 3,320,285.59 1,960,442.49
GROSS TOTAL 5,280,728.08
CONTINGENCY 528,072.81
TOTAL PROJECT COST ( FINISH ) 5,808,800.89
TOTAL
DESCRIPTION OF WORKS QUANTITY LENGTH WIDTH HEIGHT UNIT
VOLUME

I EXCAVATION
FOUNDATION ( FOOTING F1 ) 11 1.3 1.3 1.5 27.89 CU.M
FOUNDATION ( FOOTING F2 ) 4 1 1 1.2 4.80 CU.M
WALL FOOTING ( WFT ) 76 0.5 1 1 38.00 CU.M
TIE BEAM ( FTB ) 76 0.5 1.5 1 57.00 CU.M
TOTAL

II BACKFILL
FOUNDATION ( FOOTING F1 ) 14 1.15 1.15 1.7 31.48 CU.M
WALL FOOTING ( WFT ) 76 0.4 1 1 30.40 CU.M
TIE BEAM ( FTB ) 76 0.3 1.2 1 27.36 CU.M
TOTAL
III EARTHFILL
FLOOR AREA - - - 0.6 89.95 CU.M
TOTAL
LABOR

9759.75 350
1680 350
13300 350
19950 350
44689.8

2518.04 80
2432 80
2188.8 80
7138.84

35979 400
35979
FTB(FOOTING TIE BEAM)
BEAM LENGTH TIE WIRE 16mm DIA. 10mm DIA.
3.45 1.1 8 5
3.45 1.1 8 5
3.04 1.1 8 5
3.04 1.1 8 5
1.65 0.8 5 4
2.90 1 8 5
2.90 1 8 5
6.35 1.6 12 9
3.45 1.1 8 5
2.00 0.9 5 4
1.35 0.8 4 4
3.65 1.1 8 6
3.65 1.1 8 6
3.65 1.1 8 6
1.70 1.1 8 6
3.00 1 8 5
0.70 0.7 4 3
1.00 0.7 4 3
3.65 1.1 8 6
1.50 1.1 8 6
5.00 1 8 7
2.48 1 8 5
2.85 1 8 5
4.90 1 8 7
5.00 1 8 7
TOTAL 25.6 186 134
76.31
BEAM (B-1)
BEAM LENGTH TIE WIRE 16mm DIA. 10mm DIA.
3.45 1.7 12 5
4.90 2.1 13 7
4.90 2.1 13 7
1.65 1.3 6 4
1.35 1.3 5 4
1.35 1.3 5 4
2.85 1.6 11 5 63.88
2.48 1.5 10 5
5.00 2.1 13 7
5.00 2.1 13 7
3.85 1.8 12 6
3.65 1.8 12 6
3.45 1.7 12 5
3.00 1.6 11 5
3.50 1.7 12 5
3.50 1.7 12 5
3.65 1.7 12 5
6.35 2.4 17 8
TOTAL 31.5 201 100
BEAM (B-2)
BEAM LENGTH TIE WIRE 16mm DIA. 10mm DIA.
2.50 0.8 7 5
4.00 1 8 6 26.30
3.50 0.5 7 5
1.50 0.7 5 4
1.50 0.7 5 4
3.65 0.5 7 5
3.65 0.5 7 5
1.50 0.7 5 4
2.50 0.8 5 5
2.00 0.8 7 5
TOTAL 7 63 48
BEAM (B-3)
BEAM LENGTH TIE WIRE 16mm DIA. 10mm DIA.
1.50 0.7 4 4
1.50 0.7 4 4
TOTAL 1.4 8 8
ROOF BEAM (R-B)
BEAM LENGTH TIE WIRE 16mm DIA. 10mm DIA.
3.04 0.9 6 10 84.28
3.04 0.9 6 10
3.45 1 7 5
5.10 1.2 9 7
5.10 1.2 9 7
5.10 1.2 9 7
5.10 1.2 9 7
4.90 1.2 9 7
4.90 1.2 9 7
3.65 1 8 6
6.35 1.4 11 8
6.35 1.4 11 8
6.35 1.4 11 8
2.90 0.9 6 10
3.45 1 7 5
3.85 1 8 6
1.35 0.7 4 4
1.35 0.7 4 4
5.10 1.2 9 7
3.85 1 8 6
TOTAL 21.7 160 139
COLUMN C-1 0.25x0.4
HEIHGT TIE WIRE 16mm DIA. 10mm DIA.
1.90 5.3 44 47
3.20 6.8 88 60
3.20 6.8 88 60
COLUMN C-2 0.2x0.4
HEIHGT TIE WIRE 16mm DIA. 10mm DIA.
1.90 1 6 8
3.20 1.3 12 10
COLUMN C-3 0.3x0.3
HEIHGT TIE WIRE 16mm DIA. 10mm DIA.
1.90 1 4 8
3.20 1.3 8 11
63.88