URIT-610

URIT-610

Coagulation Analyzer

Maintenance Manual

URIT Medical Electronic Co., Ltd

1
Contents
1 Introduction............................................................................................................ 3
Introduction............................................................................................................
1.1 Appearance .......................................................................................................................... 3
Appearance..........................................................................................................................

2 Installation...............................................................................................................
...............................................................................................................33
Installation...............................................................................................................
2.1 Unpacking and Inspection ..................................................................................................
..................................................................................................33
Inspection..................................................................................................
2.2 Choosing Proper Location ................................................................................................. 3
Location.................................................................................................
2.3 Printer Paper Installation .................................................................................................. 3
nstallation..................................................................................................
2.4 Pipettor Installation
Installation............................................................................................................ 3
............................................................................................................

3 Operation Instruction............................................................................................ 4
Instruction............................................................................................
3.1 Power On ............................................................................................................................. 4
On.............................................................................................................................
3.2 Keyboard ............................................................................................................................. 4
Keyboard.............................................................................................................................
3.3 Menu........................................................................................................................... 5
Main Menu
3.4 Test Menu ............................................................................................................................ 5
Menu............................................................................................................................

4 Maintenance ............................................................................................................
Maintenance............................................................................................................
............................................................................................................6
4.1 Notices ................................................................................................................................ 6
Notices................................................................................................................................
4.2 Power Voltage Requirement ..............................................................................................6
equirement..............................................................................................6
4.3 Enlarged Signal Voltage .....................................................................................................6
oltage.....................................................................................................6
4.4 Simple Operation Sheet .....................................................................................................7
heet.....................................................................................................7
4.5 FIB Standard Curve Configuring Reference Graph ......................................................8
raph......................................................8
5 Troubleshooting
Troubleshooting......................................................................................................9
5.1 Trouble shooting table...............................................................................................................9

Appendix A:Main parts list.....................................................................................1


.....................................................................................100
list.....................................................................................1

2
1 Introduction
1.1 Appearance
Printer

Pipettor

LCD Display Incubation Slot

Keypad
Test channel

Pipettor: is used to add the reagent into the test cup, and start to test.
Incubation Slot: pre-warm the reagent and sample.

2 Installation
2.1 Unpacking and Inspection
Check the contents of the accessories according to the packing list.
2.2 Choosing Proper Location
a) Install the instrument on a clean, even and firm surface, which is free from vibration. Direct
sunlight, intensive magnetic field and moisture free environment.
b) Install the instrument in the room in accordance with the technical requirements (air-conditioner is
recommended to comply with the requirements on temperature and humidity).
c) Keep the exterior of the instrument dust free.
d) Avoid the instrument installation where an electrical noise source or excessive humidity is
present.
e) The instrument should be well grounded by power socket with AC100~240V.
2.3 Printer Paper Installation
Make sure the thermal side of the paper is downward or nothing will be printed out.
2.4 Pipettor Installation
Keep the plug of liquid removing device connected well with the connection port in the instrument rear panel.

3
3 Operation
3.1 Power On
Turn on the instrument and the initialization about 30 minutes, and testing when the instrument accords with
the constant temperature.
NOTICE: To ensure the accuracy of test results, please testing under the constant temperature.
3.2 Keyboard

1. Menu:: press this key to enter the main menu and to operate the instrument. Sometimes, press this key to give up
the current operation and exit.
2. Channel:: the channel selection, select the test channel.
3. Prewarming time:: press this key to set the incubation time.
4. Prewarming start:: press this key to start incubation.
5. “.” : press this key to run the printer under the testing condition.

4
3.3 Main Menu

1. Set: set PTAVE, ISI and the parameters of each item.


2. No.: set the test serial No..
3. Cal. (concentration calibration): concentration calibration of each item. The FIB item must be calibrated first, or
the testing results will not be appeared.
4. Max test time: setting the maximum testing time
5. Press “Menu” to back to the test interface.
3.4 Test Menu

“*” means the selected test channel.


“!” means the testing channel.
PTAVE: the PT mean value of normal human
PTAVE
ISI: the ISI coefficient. ISI should be correspond with ISI value given by reagent

5
4 Maintenance
4.1. Notices
a) Please carefully read the operation manual before operating the instrument.
b) Always clean the instrument daily to maintain good operation condition.
c) If the instrument is not used for a lengthy period, cover the instrument with the vinyl
dustcoat. On the resuming next operation, conduct a test with the check sample before making
any determinations.
d) Do not reconstruct or modify the instrument.
e) Please use the matching reagent produced by URIT to ensure the test accuracy.
f) Keep the instrument clean and no dust . if cleaning is needed, use wet fabric or detergent.
Any oil, ester, silica gel and lubricant is forbidden for use.
g) Use only soft fabric dipped with alcohol to clean the screen. Water, ketone and aromatic solvent
are forbidden for use.
h) Please keep the ball far away from the magnet.

4.2 Power Voltage Requirement

Testing point Voltage range or requirement


Power voltage 12V-CPU board J8 at 1foot 12.0V ± 0.2V,if not suitable ,please adjust
(triangle plates welded ) around the switch power indicator an
opener(SVR1).
Power voltage5V(CPU board J8 at 4 foot,TP6) 5.0V±0.1V
Power voltage -12V(CPU board J8 at 2foot ) -12V±0.5V
Print head voltage(C61 two directions) 7.6V±0.4V
Temperature control Adjust VR1 making TP10 voltage is 1.630 ±
basic standard voltageTP10(VR1) 0.020V
U9,U13 output voltage is:3.3±0.03V,U18 output :-5.0V±0.1V,U20 output:+5.0 ±0.1V

4.3 Enlarged Signal Voltage

Testing point Voltage range or requiremnet


U4 output frequency to adjust Adjust R92 to make output frequency is(10.5 ± 0.5)kHz,
P5 square wave voltage of the empty rate about 1:2.( within 10
percentage error),adjust frequent to make amplifier output
enough big.

6
Channel 1 voltage output to TP1 add 150uLAPTT reagents and testing beads to the sample cup,
observation testing beads wings should be average, at the same
time , wings distance should be symmetry with the sample cup
the bottom of the centre.
2.using the Oscillograph to observation the waveform ,setting
the Oscillograph as following:voltage:1V/parry,time 50or100
ms/parry, respectively observation TP1,TP2,TP3,TP4
waveform, all of the channel produce the interference
waveform peak value no more than 1.0v,the origin direct less
than 0.3V. as picture 2 show.
Respectively adjust VR4,VR3,VR5,VR6 and so on ,to make
the voltage peak value range from 2.5V to 3.0V. as picture 1
show.
not use the Oscillograph way to directly test waveform voltage
value.press “0” key open the machine ,in the testing window
press the “menu”- “ 0 ” input the password
“278000”,respectively press the 4,5,6,7 number key,
representative channel 1,2,3,4 voltage value ,adjust the opener
VR6,VR5,VR4,VR3 can respectively adjust channel 1,2,3,4
gain. ( 600 is VR5,VR4 representative channel 1,2 ) ,press
number 4 or (5,6,7) to show a digital in the right stand for six
digital average in the left .number representative channel peak
voltage value, by adjusting the opener ,to make the average
value range from 1.8 to 2.0 is ok.
4.4 Simple Operation Sheet

Test items Reagents(sample) usage and Remarks


expected temperature time
PT Sample 50 uL expected
temperature 3 minutes
PT reagents 100uL,at the same Reagents already
time start the test expected 30 minutes
APTT sample Add sample, APTT APTT reagents not
reagents respective need ahead expected
50uL, expected temperature
temperature 5 minutes
0.025M CaCL2 50uL,at the same time already expected 30
reagents start the test minutes
TT sample 100uL expected
temperature 3 minutes
TT reagents 100uL, at the same !forbid expected
time start the test temperature .after
re-diluted, stay in

7
room temperature 30
minutes, when
using ,please mixed
well.
FIB Sample 100uL,expected
temperature 3 minutes
FIB reagents 50uL , at the same !forbid expected
time start the test temperature .after
re-diluted, stay in
room temperature 30
minutes, when using,
please mixed well.
Attention :
1. Different factory reagents usage and expected warm time would be different ,if it is differ from the reagents
description , it must be according to the reagents the reagents description.
2. Reagents and sample warehouse have two gear , the first gear use for absorb accurate quantity ,the second gear use
for release quantity, at the same time open the testing switch.

4.5 FIB Standard Curve Configuring Reference Graph

8
5. Trouble shooting
5.1 Trouble shooting table
Trouble shooting table
NO Phenomenon Probable cause Correction
1 No indication a) power off a) check the power
displayed in b) circuit malfunction b) if a) is not feasible, please contact
screen local distributor.
2 Self-checking Instrument memory or IC a) shutdown the instrument, check the
error error voltage.
b) RAM/ROM broken, please contact
URIT service.
3 Result: No ball The ball is not put; little a) check the ball, reagent volume and
reagent voltage.
b) if a) is not feasible, please contact
local distributor.
4 No printing a) printer set is off a) press “Menu”-“8”, printer on
b) without printing paper b) install new print paper
c) printer cable loose c) check the printer cable
d) printer out working d) please contact URIT service.
5 Key-press a) key-press broken a) Shutdown the instrument, and
problem b) instrument circuit re-start it after 30 seconds.
problem b) if a) is not feasible, please contact
local distributor.
6 T:H (the Incubation cell a) check the environment temperature
temperature is temperature is high. b) sensor is out work.
high) c) circuit malfunction

If following situation occurs, please contact local distributor for solution:


a) The malfunction cannot be solved according to the table.
b) Accessories are damaged in operation.
c) Malfunction of the instrument, which can not be solved.
d) Major parts of the instrument are damaged.

9
Appendix A:Main parts list
No Item Note
1 LCD With connector
2 Thermal printer
3 Boat switch
4 Power filter
5 Fuse
6 power
7 Detecting device
8 keyboard
9 Power cord
10 Main board
Amplification
11
board
Liquid removing
12
device

10