Sei sulla pagina 1di 1

Section A-A

scale 1:50

galvanized sheet cover -


timber -
wood beam 50x50mm -
mineral wool 20cm -
galvanized sheet
lock on vapor barrier -
+30,05 slab r.c. 12cm -
galvanized sheet
gypsum board celing -
attic r.c. plaster + paintings - waterproof membrane protection
waterproof membrane
diffusiove layer
waterproof membrane support
metal door rigid mineral wool 20 cm
adhesive for thermal insulation
vapor barrier galvanized sheet
+28,40 difusion layer +28,25
level concrete
r.c. slab (12 cm)
gypsum board ceiling vertical waterproof
attic r.c.
plaster + paintings membrane protection

45
handrail

+26,35 plaster + paintings plaster + paintings


beam r.c. beam r.c. r.c. wall 25 cm gypsum board wall +26,10
plaster + paintings mineral wool10 cm
slope r.c. gypsum board wall
plaster + paintings
steps s.c.
+25,40 metal door

2,80
wood door
8th Floor
aluminium window 24,90
with insulating glass decorative silicone plaster
iberglass net
polystyren 10 cm
brick masonry 25 cm
handrail plaster + paintings
decorative silicone plaster
beam r.c.
iberglass net

20
+23,35 ceramic loor tiles
polystyren 10 cm beam r.c.
level concrete lintel r.c.
wall r.c. 25 cm beam r.c. r.c. slab (12 cm)
+23,10
plaster + paintings gypsum board ceiling
slope r.c. plaster + paintings aluminium window
steps s.c. with insulating glass
+22,40 metal door
2,80
wood door 7th Floor
+21,90

handrail

The loors between 1st loor and 8th loor have the same design
beam r.c.
20

+5,35 ceramic loor tiles


beam r.c.
level concrete lintel r.c.
beam r.c. r.c. slab (12 cm)
+5,10
gypsum board ceiling
slope r.c. plaster + paintings
steps s.c.
+4,40 metal door
2,80

wood door 1st Floor


aluminium window +3,90
with insulating glass

decorative silicone plaster


handrail iberglass net
decorative silicone plaster polystyren 10 cm
iberglass net brick masonry 25 cm
20

+2,35 polystyren 10 cm beam r.c. plaster + paintings plaster + paintings


plaster + paintings
wall r.c. 25 cm beam r.c. r.c. wall 25 cm gypsum board wall +2,10
plaster + paintings mineral wool10 cm
plaster + paintings
slope r.c. gypsum board wall aluminium window
plaster + paintings
steps s.c. with insulating glass
lift door
Ground
2,80

wood door
handrail Floor +0,90

footway s.c.
±0,00 ±0,00
handrail gravel 15 cm
30

slope r.c. compacted soil

beam r.c. 2%
beam r.c. ceramic loor tiles
-0,45 slope r.c. level concrete -0,45
gravel 15 cm slope r.c. r.c. slab (12 cm)
compacted soil mineral wool 10 cm
steps s.c.
metal door gypsum board ceiling
plaster + paintings
2,70

Basement

25 5,475 20 5,475 25

-3,00 -3,00
50

50

225 45 225 ceramic loor tiles ceramic loor tiles 225 45 225
50

50

level concrete level concrete


r.c. slab (12 cm) r.c. slab (12 cm)
30 90 30 vapor barrier vapor barrier 30 90 30
50

50

extruded polystyren 10 cm extruded polystyren 10 cm


30 1,50 30 gravel 15 cm gravel 15 cm
-5,00 30 1,50 30 -5,00
50

50

compacted soil compacted soil

" Gheorghe Asachi" Tehnical University of Iasi


Faculty of Civil Engineering and Building Services
Name Signature Scale Group 3304
Project Title - Civil Construction 2 -
Drawn stud. Butnaru Alexandru D. 1:50 Semigroup A

Conf. R-A. Pescaru Date Drawing nr.:


Professor
Drawing Title A-A Section A.04
GSEducationalVersion Grade 2018-2019