Sei sulla pagina 1di 38

QUALITY CHECKLIST – LOW PRESSURE STEAM PIPING

Package : PO 4700000872 Date:

Contractor : FLUIDLINE ENGINEER & FABRICATORS PVT LTD

Description of works : Piping

Bay:__________________ Drg.Ref No: Rev.:

Floor:__________________ Details:

Location:_______________
S.No. Inspection details I round II round Remarks

1 Check that Pipe Routing is in accordance with approved


drawing(s).
2 Check all weld beads/fillets are visually satisfactory

3 Check Spacing of Supports are correct for pipe size and


Standard/Spec. requirements
4 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
5 Check the spacing between joints of the pipe conforms to
applicable Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check flange joints for proper sealing with rubber/metallic gasket
and tightening of fasteners
8 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
9 Check the weld joints

10 Ensure that pipe has to be cleaned with rinse of Water.

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Variation in spec. / BOQ if any:

Observations:

Contractor Signature CBRE Signature Client Signature

464062421.xls Version 03 Page 1 of 38


QUALITY CHECKLIST – HOT WATER PIPE PIPING

Package : ISBL Date:

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round Remarks

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:

Contractor Signature JLL Signature Client Signature


QUALITY CHECKLIST – Chilled water Piping PIPING

Package : PO 4500001648 & 4700000872

Contractor : FLUIDLINE ENGINEER & FABRICATORS PVT LTD Check list No:

Description of works : Piping Grid Ref No:

Bay:__________________ Drg.Ref No: Rev.:

Floor:__________________
Details:
Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:

Contractor Signature JLL Signature Client Signature


PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks

Client Signature
QUALITY CHECKLIST – Nitrogen Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – Potable water Piping

Package : PO 4500001648

Contractor : FLUIDLINE ENGINEER & FABRICATORS PVT LTD Check list No:

Description of works : Piping Grid Ref No:

Bay:__________________ Drg.Ref No: Rev.:

Floor:__________________
Details:
Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:

Contractor Signature JLL Signature Client Signature


Date:

Check list No:

Grid Ref No:

Rev.:

Remarks

Client Signature
QUALITY CHECKLIST – Condensate water Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – Process air Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – HP Steam Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – MP Steam Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – Raw Water Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – Instrumental air Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature
QUALITY CHECKLIST – Compressed air Piping PIPING

Package : ISBL

Contractor : FLUIDLINE Check list No:

Description of works : Piping Grid Ref No:

Drg.Ref No: Rev.:


Bay:__________________
Details:
Floor:__________________

Location:_______________
S.No. Inspection details I round II round

1 Check the material is as per approved make

2 Check the Fabrication/Installation of Pipe is as per approved


technical Specifications/Shop drawings
3 Check that Pipe Routing is in accordance with approved
drawing(s).
4 Check Spacing of Supports are correct for pipe size and
Standard/Spec. requirements
5 Check size & positioning of Suspenders & Anchors per pipe size
and Std/Specs.
6 Check for Straightness, Leveling, Alignment &
Verticality/Perpendicularity of the pipes.
7 Check that pipe-sleeves at walls/floors are as per approved
drawings, and are cut flush with both surfaces and sealed.
8 Check the weld joints whether welded / grinded properly

9 Check that positioning of valves as per the approved drawing

10 Check if installed pipe is free from blockages

11
Check finish/final paint coat of AG piping & supports is smooth,
without wrinkles, sags, runs, scratches, and other damage.

Remarks

Observations:
Contractor Signature JLL Signature Client Signature
PIPING

Date:

Check list No:

Grid Ref No:

Rev.:

Remarks
Client Signature

Potrebbero piacerti anche