SAFTY INSPECTION CHECKLIST
LOCATION :
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
1.Common
1-7. Transportation
2 Arrange
Workthe suitable trailer for the loding weight.
2. Structure
2-1. Excavation
2 Install
Work
the safety fence around the opening.
5 Ventilate.
2-2. Supporting
2 Set the
Work
brace to avoid the deformation.
7 Sign clearly.
3. Slope Protection
Protect the point that the main rope touch with the
2
the safety fence.
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
1.Common
1-7. Transportation
2 Arrange
Workthe suitable trailer for the loding weight.
2. Structure
2-1. Excavation
2 Install
Work
the safety fence around the opening.
5 Ventilate.
2-2. Supporting
2 Set the
Work
brace to avoid the deformation.
7 Sign clearly.
3. Slope Protection
Protect the point that the main rope touch with the
2
the safety fence.
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
1.Common
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
Use the proper wire that is sustainble for the lifting
3
weight.
Check the wire whether it is broken, or gotten out of
4
shape
Keep the angle within 60 degree for lifting wire
5
except the special case.
Attach the support for the corner of the cargo to
6
protect the lifting wire.
1-8. Transportation
2 Arrange
Workthe suitable trailer for the loding weight.
PROJECT :
SAFTY INSPECTION CHECKLIST
LOCATION :
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
2.Grasswork Excavation
2-2.Blasting Work
2-3. Excavation
2 Before
Work
the working, remove the stone on the slope.
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
Check for working not to enter into the working area
3
of the bulldozer, with caring the blind spot.
2-5. Loading
4. Structure
4-2. Excavation
2 Install
Work
the safety fence around the opening.
5 Ventilate.
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
4-3. Supporting
2 Set the
Work
brace to avoid the deformation.
7 Sign clearly.
INSPECTED : CHECKED :
COMPANY : COMPANY :
DATE : DATE :
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
5. Slope Protection
Protect the point that the main rope touch with the
2
the safety fence.
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.