Sei sulla pagina 1di 14

 PROJECT :

SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

1.Common

1-1 Safety Helmet

1 Wear the helmet, and put on the chin strap.

2 Don´t wrap the towel on the neck.


Check the condition of safety belt before working
3 ( Don't use the safety belt which is damaged or
decayed.)
4 Wear the shoes or the long boots.

Wear the safety belt in case that working area is


5
more than 2m.

1-2 Safety Belt


Check the condition of safety belt before working
1 ( Don't use the safety belt which is damaged or
decayed.)
Put the hook of the safety belt on the shoulder for
2
using it all the time.
Put the hook of the safety belt upper than the position
3
of waist.

4 Fasten the belt correctly and tightly.

Check the connection between the safety belt and the


5
rope of hook.
Regard that the rope of hook will not attach the other
6
materials.

1-3. Safety Passage

Discriminate between construction yard and safety


1
passage by safety fence.
Keep the passage width that passenger can pass
2
easily.

3 Arrange the safety board properly.

4 Don't put material inside of passage road.

1-4. Switch Board

1 Close the lock of the Electric Box during the work.

2 Don't put equipments near the Electric Box.

3 Connect the earth surely.

4 One cable is for one plug.

5 Exhibit the connection place for each wiring.

Check that the leakage breaker is available before


6
working.
Arrange the handling person in charge of the switch
7
board.

1-5. Scaffolding Work

1 Arrange the work instructor.

2 Install the safety board "NO ENTRY "

3 Install the stairs to go up and down.

4 Install the handrail on the stairs.

5 Arrange the decking for the scaffolding not to sink.

6 Install the jackbase.


REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

7 Arrange the support bar not to collapse.

8 Close the opening with the pipes or rope.

9 Arrange the toeboards.

10 Arrange the main rope.

Wearing the safety belt in case of working on the


11
higer position

1-6. Crane Work

1 Keep the cargo weight limit.

Select the suitable type of crane based on the weight


2
table.
Install the safety sign board "NO ENTRY "for the
3
construction yard.

4 Keep out around the crane working area.

5 Set outrigger to avoid to collapse the crane.

6 Arrange the decking for the crane not to sink.

7 Set the crane level on the ground.

8 Attach the assist rope for the long material.

9 Don't enter below the vessel and cargo

Appoint the signalman and sign the instruction for the


10
operator.

1-7. Transportation

1 The signalman lead the excavator to the trailer.

2 Arrange
Workthe suitable trailer for the loding weight.

3 Do the transportation work on the flat place.

Use the temporary bridge to assist the transportation


4
work.

5 Fix the backhoe by the chock to avoid to move.

Fix the backhoe by the lever block wire to avoid to


6
move.

7 Fix the trailer by the chock to avoid to move.

1-8. Construction Equipment

1 Check the condition of the machine before working

2 Make the operating daily report of each equipment

Maintain each equipment with good condition by the


3
annual and monthly check.
The Operator should take care of their healthconditiin
4
by themselves.

2. Structure

2-1. Excavation

Install the safety fence to exhibit keep out the


1
working area.

2 Install
Work
the safety fence around the opening.

3 Work by the signalman instruction.

4 Arrange the lead staff for the operator.

5 Ventilate.

6 Arrange the light for the working area.

7 Don't drop the bucket downward without control.

8 Don't enter below the bucket


REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

9 Drop the wire downward gradually not to tangle.

10 Don't force the equipment beyond it's capacity.

2-2. Supporting

Check the strength of the supporting and the fix


1
meathod.

2 Set the
Work
brace to avoid the deformation.

3 Check the base ground to avoid the ground sinkage.

Install the safety fence to exhibit keep out the


4
working area

5 Arrange the handrail for the prevention falling.

Wear the safety belt while working on the higher


6
position.

7 Sign clearly.

2-3. Construction Terrace

Install the safety fence to exhibit keep out the


1
working area

2 Install the handrail for the preventing falling.

Install the skirting board for the preventing falling of


3
the material.

4 Exhibit the loading capacity .

5 Install the temporary stairs to go up and down.

6 Work inside the working area.

After finish working, install the safety fence for the


7
opening .

2-4. Reinforcement Work

Install the safety fence to exhibit keep out the


1
working area
Use the proper wire for the weight of the lifted
2
material.

3 Don't enter below the lifted material.

4 Attach the assist rope for the long material.

5 Arrange the scaffold according to the site conditions.

Care the footstep and install the scaffolding board for


6
the pass, if necessary.
Make a signal certainly between the operator and the
7
signalman.

8 Arrange the light for the working area.

2-5. Concrete Work

Set outrigger to avoid to collapse the concrete


1
pumping car.

2 Lead the conrete mixer car properly.

Make a signal certainly between the concrete pump


3
operator and the signalman.

4 Keep out the end of the concrete injection hose.

5 Check the condition of the support.

6 Use the long boots not to touch the concrete directly.

After finish working, install the safety fence for the


7
opening .

3. Slope Protection

3-1. Slope Protection

1 Arrange the main rope anchor at 2 points.

Protect the point that the main rope touch with the
2
the safety fence.
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.

4 Wear the mask.

5 Arrange the watchman to check the slope condition.

While some work is doing below the slope, don't work


6
anything above the slope.

7 Check the condition of the slop before working


 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

1.Common

1-1 Safety Helmet

1 Wear the helmet, and put on the chin strap.

2 Don´t wrap the towel on the neck.


Check the condition of safety belt before working
3 ( Don't use the safety belt which is damaged or
decayed.)
4 Wear the shoes or the long boots.

Wear the safety belt in case that working area is


5
more than 2m.

1-2 Safety Belt


Check the condition of safety belt before working
1 ( Don't use the safety belt which is damaged or
decayed.)
Put the hook of the safety belt on the shoulder for
2
using it all the time.
Put the hook of the safety belt upper than the position
3
of waist.

4 Fasten the belt correctly and tightly.

Check the connection between the safety belt and the


5
rope of hook.
Regard that the rope of hook will not attach the other
6
materials.

1-3. Safety Passage

Discriminate between construction yard and safety


1
passage by safety fence.
Keep the passage width that passenger can pass
2
easily.

3 Arrange the safety board properly.

4 Don't put material inside of passage road.

1-4. Switch Board

1 Close the lock of the Electric Box during the work.

2 Don't put equipments near the Electric Box.

3 Connect the earth surely.

4 One cable is for one plug.

5 Exhibit the connection place for each wiring.

Check that the leakage breaker is available before


6
working.
Arrange the handling person in charge of the switch
7
board.

1-5. Scaffolding Work

1 Arrange the work instructor.

2 Install the safety board "NO ENTRY "

3 Install the stairs to go up and down.

4 Install the handrail on the stairs.

5 Arrange the decking for the scaffolding not to sink.

6 Install the jackbase.


REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

7 Arrange the support bar not to collapse.

8 Close the opening with the pipes or rope.

9 Arrange the toeboards.

10 Arrange the main rope.

Wearing the safety belt in case of working on the


11
higer position

1-6. Crane Work

1 Keep the cargo weight limit.

Select the suitable type of crane based on the weight


2
table.
Install the safety sign board "NO ENTRY "for the
3
construction yard.

4 Keep out around the crane working area.

5 Set outrigger to avoid to collapse the crane.

6 Arrange the decking for the crane not to sink.

7 Set the crane level on the ground.

8 Attach the assist rope for the long material.

9 Don't enter below the vessel and cargo

Appoint the signalman and sign the instruction for the


10
operator.

1-7. Transportation

1 The signalman lead the excavator to the trailer.

2 Arrange
Workthe suitable trailer for the loding weight.

3 Do the transportation work on the flat place.

Use the temporary bridge to assist the transportation


4
work.

5 Fix the backhoe by the chock to avoid to move.

Fix the backhoe by the lever block wire to avoid to


6
move.

7 Fix the trailer by the chock to avoid to move.

1-8. Construction Equipment

1 Check the condition of the machine before working

2 Make the operating daily report of each equipment

Maintain each equipment with good condition by the


3
annual and monthly check.
The Operator should take care of their healthconditiin
4
by themselves.

2. Structure

2-1. Excavation

Install the safety fence to exhibit keep out the


1
working area.

2 Install
Work
the safety fence around the opening.

3 Work by the signalman instruction.

4 Arrange the lead staff for the operator.

5 Ventilate.

6 Arrange the light for the working area.

7 Don't drop the bucket downward without control.

8 Don't enter below the bucket


REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

9 Drop the wire downward gradually not to tangle.

10 Don't force the equipment beyond it's capacity.

2-2. Supporting

Check the strength of the supporting and the fix


1
meathod.

2 Set the
Work
brace to avoid the deformation.

3 Check the base ground to avoid the ground sinkage.

Install the safety fence to exhibit keep out the


4
working area

5 Arrange the handrail for the prevention falling.

Wear the safety belt while working on the higher


6
position.

7 Sign clearly.

2-3. Construction Terrace

Install the safety fence to exhibit keep out the


1
working area

2 Install the handrail for the preventing falling.

Install the skirting board for the preventing falling of


3
the material.

4 Exhibit the loading capacity .

5 Install the temporary stairs to go up and down.

6 Work inside the working area.

After finish working, install the safety fence for the


7
opening .

2-4. Reinforcement Work

Install the safety fence to exhibit keep out the


1
working area
Use the proper wire for the weight of the lifted
2
material.

3 Don't enter below the lifted material.

4 Attach the assist rope for the long material.

5 Arrange the scaffold according to the site conditions.

Care the footstep and install the scaffolding board for


6
the pass, if necessary.
Make a signal certainly between the operator and the
7
signalman.

8 Arrange the light for the working area.

2-5. Concrete Work

Set outrigger to avoid to collapse the concrete


1
pumping car.

2 Lead the conrete mixer car properly.

Make a signal certainly between the concrete pump


3
operator and the signalman.

4 Keep out the end of the concrete injection hose.

5 Check the condition of the support.

6 Use the long boots not to touch the concrete directly.

After finish working, install the safety fence for the


7
opening .

3. Slope Protection

3-1. Slope Protection

1 Arrange the main rope anchor at 2 points.

Protect the point that the main rope touch with the
2
the safety fence.
REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.

4 Wear the mask.

5 Arrange the watchman to check the slope condition.

While some work is doing below the slope, don't work


6
anything above the slope.

7 Check the condition of the slop before working


 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

1.Common

1-1 Safety Helmet

1 Wear the helmet, and put on the chin strap.

2 Don't work naked.

3 Don´t wrap the towel on the neck.

4 Clasp the button of the sleeves.

5 Mend the rip end tear of the clothes.


Check the condition of safety belt before working
6 ( Don't use the safety belt which is damaged or
decayed.)
7 Wear the shoes or the long boots.

Wear the safety belt in case that working area is


8
more than 2m.

1-2 Safety Belt


Check the condition of safety belt before working
1 ( Don't use the safety belt which is damaged or
decayed.)
Put the hook of the safety belt on the shoulder for
2
using it all the time.
Put the hook of the safety belt upper than the position
3
of waist.

4 Fasten the belt correctly and tightly.

Check the connection between the safety belt and the


5
rope of hook.
Regard that the rope of hook will not attach the other
6
materials.

1-3. Safety Passage

Discriminate between construction yard and safety


1
passage by safety fence.
Keep the passage width that passenger can pass
2
easily.

3 Lead the passenger by the reflector signal light.

4 Arrange the safety board properly.

5 Don't put material inside of passage road.

1-4. Switch Board

1 Close the lock of the Electric Box during the work.

2 Don't put equipments near the Electric Box.

3 Connect the earth surely.

4 One cable is for one plug.

5 Exhibit the connection place for each wiring.

Check that the leakage breaker is available before


6
working.
Arrange the handling person in charge of the switch
7
board.

1-5. Lifting Work

1 Appoint the signalman and the hoisting worker.

2 Decide the way of the contact and sign.


 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
Use the proper wire that is sustainble for the lifting
3
weight.
Check the wire whether it is broken, or gotten out of
4
shape
Keep the angle within 60 degree for lifting wire
5
except the special case.
Attach the support for the corner of the cargo to
6
protect the lifting wire.

7 Attach the assist rope for the long material.

8 Arrange the decking on the place to put the material.

Install the safety signboard to keep out around


9
loading and unloading work

10 Put the material on the flat place.

1-6. Scaffolding Work

1 Arrange the work instructor.

2 Install the safety board "NO ENTRY "

3 Install the stairs to go up and down.

4 Install the handrail on the stairs.

5 Arrange the decking for the scaffolding not to sink.

6 Install the jackbase.

7 Arrange the support bar not to collapse.

8 Close the opening with the pipes or rope.

9 Arrange the toeboards.

10 Arrange the main rope.

Wearing the safety belt in case of working on the


11
higer position

1-7. Crane Work

1 Keep the cargo weight limit.

Select the suitable type of crane based on the weight


2
table.
Install the safety sign board "NO ENTRY "for the
3
construction yard.

4 Keep out around the crane working area.

5 Set outrigger to avoid to collapse the crane.

6 Arrange the decking for the crane not to sink.

7 Set the crane level on the ground.

8 Attach the assist rope for the long material.

9 Don't enter below the vessel and cargo

Appoint the signalman and sign the instruction for the


10
operator.

1-8. Transportation

1 The signalman lead the excavator to the trailer.

2 Arrange
Workthe suitable trailer for the loding weight.
 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

3 Do the transportation work on the flat place.

Use the temporary bridge to assist the transportation


4
work.

5 Fix the backhoe by the chock to avoid to move.

Fix the backhoe by the lever block wire to avoid to


6
move.

7 Fix the trailer by the chock to avoid to move.

1-9. Construction Equipment

1 Check the condition of the machine before working

2 Make the operating daily report of each equipment

Maintain each equipment with good condition by the


3
annual and monthly check.
The Operator should take care of their healthconditiin
4
by themselves.

2.Grasswork Excavation

2-1. Drilling Work

1 Decide the drilling position by the drilling pattern.

2 Don't drill the hole which is made in former brasting.

Check the slope condition before working. (Check


3
pumice stone,spring water, crack etc)
Arrange the barricade on the top of the slope to avoid
4
to fall.
Install the safety fence and board to exhibit keep out
5
area.

6 Wear the mask.

Maintain the running corse with good condition for the


7
equipment.

2-2.Blasting Work

1 Install the safety board to exhibit the blasting work.


The priming position can see the blasting position and
2 should be safety, arrange the some protection, if
necessary.
3 Confirm that the all worker have finished evacuating.

4 Measure the resistance of the connection.

2-3. Excavation

Check the slope condition before working. (Check


1
pumice stone,spring water, crack etc)

2 Before
Work
the working, remove the stone on the slope.

Arrange the filling as small bank on the top of the


3
slope.
Install the safety fence and board to exhibit keep out
4
area, if necessary.
While some work is doing below the slope, don't work
5
the excavation above the slope.

6 Don't excavate only the bottom of the slop.

2-4. Pushing Soil

1 Set the head guard.

Control the running speed according to the ground


2
condition.
 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures
Check for working not to enter into the working area
3
of the bulldozer, with caring the blind spot.

4 Keep the balance of the bulldozer.

5 Excavate the soil uniformly.

6 Excavation should work on the downgrade.

2-5. Loading

1 Loading should work on the flat place.

2 Don't force the equipment beyond it's capacity.

Install the safety fence and board to keep out from


3
the working area of the excavator, if necessary.
Don't load the material on the dump truck beyond the
4
weight limit.

5 Arrange the watch man, if necessary.

2-6. Soil Transportation

1 Keep the speed limit strictly.

Don't load the material on the dump truck beyond the


2
weight limit.

3 Don't start, stop, and operate suddenly.

4 Check the braking condition on the slope.

Check the condition of the exhaust gas, repair in the


5
case of the bad condition.

6 Check the abrasion condition of the tyre.

4. Structure

4-1. Piling Work

Install the safety fence to exhibit keep out the


1
working area
Check the ground resistance whether it is enough or
2
not.

3 Set the equipment level on the ground.

Protect for the nearby equipmqnt from the working


4
area.

5 Arrange not to be caught for the operating cable.

6 Unify the signal of the operation and the sign.

7 Keep away from the vibration equipment.

4-2. Excavation

Install the safety fence to exhibit keep out the


1
working area.

2 Install
Work
the safety fence around the opening.

3 Work by the signalman instruction.

4 Arrange the lead staff for the operator.

5 Ventilate.

6 Arrange the light for the working area.

7 Don't drop the bucket downward without control.


 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

8 Don't enter below the bucket

9 Drop the wire downward gradually not to tangle.

10 Don't force the equipment beyond it's capacity.

4-3. Supporting

Check the strength of the supporting and the fix


1
meathod.

2 Set the
Work
brace to avoid the deformation.

3 Check the base ground to avoid the ground sinkage.

Install the safety fence to exhibit keep out the


4
working area

5 Arrange the handrail for the prevention falling.

Wear the safety belt while working on the higher


6
position.

7 Sign clearly.

4-4. Construction Terrace

Install the safety fence to exhibit keep out the


1
working area

2 Install the handrail for the preventing falling.

Install the skirting board for the preventing falling of


3
the material.

4 Exhibit the loading capacity .

5 Install the temporary stairs to go up and down.

6 Work inside the working area.

After finish working, install the safety fence for the


7
opening .

4-5. Reinforcement Work

Install the safety fence to exhibit keep out the


1
working area
Use the proper wire for the weight of the lifted
2
material.

3 Don't enter below the lifted material.

4 Attach the assist rope for the long material.

5 Arrange the scaffold according to the site conditions.

Care the footstep and install the scaffolding board for


6
the pass, if necessary.
Make a signal certainly between the operator and the
7
signalman.

8 Arrange the light for the working area.

4-6. Concrete Work

Set outrigger to avoid to collapse the concrete


1
pumping car。

2 Lead the conrete mixer car properly.

Make a signal certainly between the concrete pump


3
operator and the signalman.

4 Keep out the end of the concrete injection hose.

5 Check the condition of the support.


 PROJECT :
SAFTY INSPECTION CHECKLIST
 LOCATION :

INSPECTED :  CHECKED :  
COMPANY :  COMPANY :  

DATE :  DATE :  

REMARKS
Division Items to check OK NG
Location, Comments & Counter Measures

6 Use the long boots not to touch the concrete directly.

After finish working, install the safety fence for the


7
opening .

5. Slope Protection

5-1. Slope Protection

1 Arrange the main rope anchor at 2 points.

Protect the point that the main rope touch with the
2
the safety fence.
While working, wear the sefety belt and don't release
3
it even if in case of shifting to another place.

4 Wear the mask.

5 Arrange the watchman to check the slope condition.

While some work is doing below the slope, don't work


6
anything above the slope.

7 Check the condition of the slop before working

Potrebbero piacerti anche