Sei sulla pagina 1di 9

Atmospheric Conditions

Quantity Unit Remarks


Ambient Temperature [atm_temp] 28 Celcius User
[atm_temp_k] 301 Kelvin Calculated
Ambient Pressure [atm_pre] 101325 Pascal User
Specific Gas Constant [gas_const] 286.9 J/(kg.K) Constant
Oxygen quantity in air [oxy_qty] 20.95% % User
Density of Air [air_den] 1.17332836171748 kg/m3 Calculated
Mass of one mole of oxygen [oxy_mas_mole] 32 grams Constant

Calculation of Number of Moles of Oxygen in 1m3 of air


Partial Pressure of Oxygen [oxy_par_pre] 21227.5875 Pascal Calculated
Total Volume [to_vol] 1 m3 Fixed
Universal Gas Constant of Oxygen [uni_gas_const] 8.3145 J/mol.K Constant
number of moles of oxygen [no_oxy_mole] 8.4819948898464 moles Calculated
Mass of Oxygen per cu mtr of air [oxy_mass] 271.423836475085 gm Calculated

Waste characterestics
Recyclable fraction [re_fr] 15% % User, description by weight
Inert [in_fr] 15% % User, description by weight
Organic fraction [or_fr] 70% % Calculated, description by weight

Required Waste Quantity


Organic Fraction [re_or_wa] 10 Tons User

Volume of recyclable waste [vo_re_wa] 21.4285714285714 m3 Calculated


Weight of recyclables [we_re_wa]
Assumed density of recyclable waste [de_re_wa] 200 Kg/m3 User
Assumed density of inerts [de_in_wa]
Total required waste for project per day [to_wa_re] 14.2857142857143 Tons Calculated
Prepared by uday 12/08/2021 Page 2

Waste Characterization
Qty Unit
Waste Quantity per day [was_qty] 10 TPD
Density of waste [was_den] 350 kg/m3
Total Waste Volume [to_was_vol] 28.5714285714286 m3
Total Solid [ts_per] 35% %
[ts_tpd] 3.5 TPD
Volatile solid [vs_per] 50% %
[vs_tpd] 1.75 TPD
[vs_mg] 1750000000 mg
Nitrogen [N_per] 2.80% %
[N_tpd] 0.098 TPD
Water Content [wa_per] 65% %
[wa_tpd] 6.5 TPD
C/N [c_n_ip] 17.8571428571429 Ratio

Tunnel Dimensioning
Residence Time [r_t_1] 4 days
tunnel width [t_w] 2.5 m
tunnel height [t_h] 3 m
waste height in tunnel [w_h_t] 1.8 m
tunnel length [t_l] 44 m
volume of waste in r_t_1 time [v_was_rt_1] 200 m3

Waste Requirement & Aerobic composting Requirement


Required Moisture Content [tu_re_moi] 60% %
Required Temperature [tu_re_temp] 50 Celcius
[tu_re_temp_k] 323 Kelvin

Air & Mass Reduction Calculation


Air flow required on day-1 [air_flo_1] 777.376309269629 m3/day
Air flow required on day-2 [air_flo_2] 1531.4313447106 m3/day
Air flow required on day-3 [air_flo_3] 2262.8647440743 m3/day
Air flow required on day-4 [air_flo_4] 2972.35515599345 m3/day

Total VS in tunnel on day-1 [vs_day1] 1750000000 mg


Total VS in tunnel on day-2 [vs_day2] 3447500034.77918 mg
Total VS in tunnel on day-3 [vs_day3] 5094075102.25078 mg

Total VS in tunnel on day-4 [vs_day4] 6691252950.42196 mg

VS mass loss day-1 [vs_lo_1] 0 Kg

STM Confidential 12/08/2021 Page 2


Prepared by uday 12/08/2021 Page 3

[vs_lo_1_per] 0% %
VS mass loss day-2 [vs_lo_2] 52.4999652208243 Kg
[vs_lo_2_per] 1.52% %
VS mass loss day-3 [vs_lo_3] 155.924897749222 Kg
[vs_lo_3_per] 3.06% %
VS mass loss day-4 [vs_lo_4] 308.74704957804 Kg
[vs_lo_4_per] 4.61% %

Water Evaporated on Day-1 [wa_ev_1] 0 Kg


Water Evaporated on Day-2 [wa_ev_2] 454.147929233236 Kg
Water Evaporated on Day-3 [wa_ev_3] 1348.81935884836 Kg
Water Evaporated on Day-4 [wa_ev_4] 2670.7985925888 Kg

Heat Evolution on Day-1 [ht_1] 0 MJ


Heat Evolution on Day-2 [ht_2] 1207.49920007896 MJ
Heat Evolution on Day-3 [ht_3] 3586.2726482321 MJ
Heat Evolution on Day-4 [ht_4] 7101.18214029492 MJ

Water Content in tunnel on day-1 [wa_co_1] 6500 Kg


[wa_co_1_per] 65% %
Water Content in tunnel on day-2 [wa_co_2] 12545.8520707668 Kg
[wa_co_2_per] 64.36% %
Water Content in tunnel on day-3 [wa_co_3] 17697.0327119184 Kg
[wa_co_3_per] 63.23% %
Water Content in tunnel on day-4 [wa_co_4] 16375.053478178 Kg
[wa_co_4_per] 46.77% %

Total Mass in tunnel day-1 [tm_tu_1] 10000 Kg


Total Mass in tunnel day-2 [tm_tu_2] 19493.3521055459 Kg
Total Mass in tunnel day-3 [tm_tu_3] 27988.6078489484 Kg
Total Mass in tunnel day-4 [tm_tu_4] 35009.0622067815 Kg

Combined Mass lost day-1 [co_ml_1] 0 Kg


[co_ml_1_per]
Combined Mass lost day-2 [co_ml_2] 610.072826982458 Kg
[co_ml_2_per] 3.1% %
Combined Mass lost day-3 [co_ml_3] 1504.74425659758 Kg
[co_ml_3_per] 5.02% %
Combined Mass lost day-4 [co_ml_4] 2979.54564216684 Kg
[co_ml_4_per] 9.93% %

Expected C/N day_1 [c_n_1]


Expected C/N day_2 [c_n_2]
Expected C/N day_3 [c_n_3]
Expected C/N day_4 [c_n_4]

STM Confidential 12/08/2021 Page 3


Prepared by uday 12/08/2021 Page 4

Related Calculation
Assumed VS reduction per day [vs_red] 3% %
Heat evolution per Kg of decomposed material [ht_kg] 23 MJ/kg
Heat used for evaporation of water [ht_va] 85% %
Heat required to evaporate per Kg of water [ht_kg_wa] 2.26 MJ
Euler's Constant [e=e_1] 2.71828

Calculated constant p [p_1] -0.000609184149694 ul


Diminising Factor [d_f] 0.970000019873815
Oxygen Consumption rate [y_1] 2.51188643150958 mg/h per g of VS
Constant [a_1] 0.1
Constant [k_1] 0.028
Volume of air equivalent to oxygen consumption rate per day
per kg of VS[air_oxy_eq] 0.22210751693418 m3/day per kg of VS

Since the waste is fresh so much higher air flow is required


so we double the calculated air flow [air_oxy_eq_mod]
0.44421503386836 m3/day per kg of VS
Assumed all organic fraction is of size [or_fr_si] 60 mm

STM Confidential 12/08/2021 Page 4


Prepared by uday 12/08/2021 Page 5

e Characterization
Remarks
Calculated
User
Calculated
User
Calculated
User
Calculated

User
Calculated
Calculated
Calculated
Calculated

nel Dimensioning
User
Fixed
Fixed
Based on 60% of volume is occupied by waste [Ref: Christian Group]
Calculated
Calculated

Aerobic composting Requirement


Fixed [Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]
User
Calculated

s Reduction Calculation
Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
As same volume of product will be taken out so the mass of VS in tunnel from day-3
will be constant

Calculated

STM Confidential 12/08/2021 Page 5


Prepared by uday 12/08/2021 Page 6

Calculated

Calculated

Calculated

Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
Calculated
Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
Calculated
Calculated
Calculated
Calculated
Calculated

Calculated
Calculated
Calculated
Calculated

STM Confidential 12/08/2021 Page 6


Prepared by uday 12/08/2021 Page 7

ated Calculation
User
Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]
Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]
Internet :http://en.wikipedia.org/wiki/Latent_heat
Constant
Mass at time (t) is calculated as per following equation
m(t)=m(0)e-p*tu_re_temp_k
Calculated
Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]
Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]
Ref: MSW for Organic Agriculture by Dr. B.F.A Basnayake[7th Sept 2001]

Calculated

Ref: Science of Composting- Air flow required at the beginning of the composting
process is much higher

STM Confidential 12/08/2021 Page 7


Volume of waste taken out from Tunnel on day-5
[wa_vo_tu] 47.1623375 m3
Estimated weight of waste [wa_wg_s] 13292.5324 Kg
Estimated volume reduction of waste in phase-1
[es_vol_re] 9.93% %
Sorting efficiency [s_eff_sc] 65% %
Recoved recyclable/RDF [rdf_re] 2.78571429 Tons
Remaining organic & Inert [re_wa_sor]
Calculated
Calculated

Assumed to be same as combined mass loss


User
Calculated

Potrebbero piacerti anche