jetty

trains include compresors


various equipment
road crossing
2# 84" GRE pipes
84" GRE seawater pipe pair avenue D road sketch 66
trapezoidal open ditches on all roads
vessels not shown herein
compressors
boilers storm water, oily water, fire water,
sewerage etc. all not shown
process train details not shown
avenue E street

GRE & other pipe lines run below ground in all process areas
external connections are not indicated
indicated on underground utilities drawings
sea
road crossings are shown on those drawings
waste area
seawater basin supplies water to all trains hydrojetting
water is used for cooling & water recirculated workshops
some buildings are blast resistant
some buildings are blast resilient
some buildings are non blast landscape outfall chamber
processing equipment housed in steel buildings
chiller compound
amenities fire station
warehouse
consumer receipt administration water
compound
bus stop

other plant

pipe racks

3384
electric buiildings
process area train
refinery plant area
train
2465

CCB
train

train

gup gate
offisites
seawater basin lagoon

flare tower

first street security storage tanks


weighing electric buiildings
medical centre plan just size in M
entry to explain
security methods
1500
common proces area & others
national highway facilities plant layout