1 Test Plan Intertec QA Team

2 Test Plan Intertec QA Team


1 Introduction

1.1 Purpose & Scope

1.2 Functions/ Features to be Tested

This section describes the Functions/ Features to be tested.

Release/
Weightage/Complexity
Functions/ Features to be tested Phase

Note: Note: Weightage/Complexity is based on the Priority and Complexity of the


Functionality (Out of 5).

3 Test Plan Intertec QA Team


1.3 Assumptions & Constraints

This section describes the Assumption & Constraints for the Testing process.

Assumptions & Constraints


1
2
3
4
5
6
7
8

1.4 Test Strategies

This section describes the different Test Strategies for the Testing process – Deployment in Test Server
Smoke Testing Functional Test Execution Bug Reporting & Retesting Regression Testing Test
Results Publishing Performing UAT.

1. Build deployment on respected URL.


2. Carrying out Smoke test.
3. Testing all the Implemented requirements on supported browsers.
4. Reporting Defects in Bug Reporting tool.
5. Retesting the Implemented defects.
6. Carrying out Regression testing (based on the Regression List).
7. Publishing Report(s).
8. UAT & Production Release.

1.5 Testing Types

This section describes the different types of Testing performed for this release.
4 Test Plan Intertec QA Team
1. Smoke Testing – For each build to ensure the stability.
2. Integration Testing – To integrate different modules and verify the data flow
and functionalities between the modules.
3. Functional Testing – Execution of Functional Test cases.
4. Regression Testing – To verify the Impacts of new changes or bug fixes.
5. Compatibility Testing – Browser compatibility testing based on Customer requirement.
6. User Acceptance Testing – Testing in client’s environment to certify the system with
respect to the requirements that was agreed upon.

1.6 Test Approach

This section describes the Test Approach and Objectives for each. It also explains the Entry Criteria
Activity, Exit Criteria Activity and the Environment for Test Execution.

Approach Test Objective Entry Criteria Activity Environment Exit Criteria Activity
1 Test
Documenta
tion
2 Smoke/
Build
verification
3 Integration
&
Functional
Testing
4 User
Interface

5 Compatibili
ty

6 Re-Testing
&
Regression
Testing
7 Data and
Database
Integrity
Testing
8 User
Acceptance

5 Test Plan Intertec QA Team


1.7 Defect Classification

This section describes the severity & weightage for a particular Bug found in the System.

Severity Severity Code Weightage Defect Description


1 Critical Defect that would result in failure of the
1 10 software element with no possible
workaround. A showstopper defect.
2 Major Defect that would result in failure of the
2 5 software element but has a possible
workaround.
3 Moderate Defect that would affect only the non-
3 1 functional aspects of the software
elements.
4 Recommendation/ This is not a typical defect but a viewpoint
Suggestion that the reviewer wants to recommend.
4
Corrective action may or may not be taken
against this.

1.8 Test Schedule

This section describes the Test Schedules which includes the timelines for Test Documentation, Execution
in Local & in client’s environment.

From Date To Date Activity


Releases No. of Days Hours
Release 1 Documentation

6 Test Plan Intertec QA Team


Test Environment Setup

Test Execution

UAT/ Delivery

7 Test Plan Intertec QA Team


1.9 Test Execution & Review

This section describes the resource and activities at different Test Levels and the Completion Criteria for
the Execution.

Test cases Executed


Level Reviewed By Completion Criteria
Written By By
1 Smoke
2 Integration
3 Functional
4 Compatibility

1.10 Resources

This section describes the QA, Hardware, Software and Tools required for Testing process for this
particular resource.

Resource Details
1 Tester
2 Software Requirements
3 Hardware Requirements
4 Ports
5 Tools

8 Test Plan Intertec QA Team


1.11 Suspension and Resumption Criteria

This section describes the Suspension criteria to be used to suspend all or a portion of the testing
activities while resumption criteria specify when testing can resume after it has been suspended.

Criteria
1
2
3
4

1.12 Risk Analysis

This section describes various Risks involved/ can happen during the Testing Process.

Risks
1
2
3
4
5
6
7
8

9 Test Plan Intertec QA Team