Main Contract 3 (MC3) Works for Development of Muscat International Airport
Testing & Commissioning Management Plan – Attachment A – Process Diagram
Construction & Commissioning Planning Stage Testing and Commissioning Stage Handover Stage
Define Testing &
Commissioning Scope, Carry out off-site testing Integrated Performance Tests – assess interfaces & dependencies. (FAT) and (IAT) – SIT Review and issue test Factory acceptance test Demonstrating progressive stages by a series of report documentation – Provide logic sequence and Interface SAT on components or individual systems Collation of all Testing & diagrams, develop acceptance test (if Number of testing teams from different Commissioning integrated time applicable) contractors is likely to involve documentation, List all schedule, provide testing & commissioning resource plan Identify lead contractor who lead the test defects, outstanding Planning of Testing and work or snags. Commissioning Activities
Carry out On-site
Inspection & Static Tests – Review Acceptance for QA inspection & test Handover – Team Structure Roles plan e.g. hydraulic Status of Handover of and Responsibilities pressure test, cable Systems insulation test etc.
Scope and Outline
Method Statements and Procedures for Commissioning
Project Commissioning Handover-
Strategy Pre commissioning and Outstanding Works, setting systems to work - Snags, Training, ORAT, E.g. Energisation & Maintenance etc. functional checks, control wiring checks; cleaning of pipework, activities for Refer to - Taking over setting to work of fan, Procedure – pump & motors. SE-BEB-03SU-PRO-0001
Detailed Testing &
Commissioning Management Plan
Test & Commission individual systems –
SAT Static to dynamic operating conditions either standalone or integrated system. It is accepted that a collection of SAT will be Issued to Engineer for carried out on any one system to ensure all Comments parts are commissioned in progressive manner Test results / Test sheets / Reports