Sei sulla pagina 1di 1

TCR Arabia Company Ltd.

PENETRANT TESTING REPORT


Client ARO/IMI Reference Code ASME V Article 6 Date Tested 02/03/2020
ARO SAR
Project Test Procedure ABS Report No. SAR201-PT-01
201/P.19A-0057
DAMMAM SHIP
Location Acceptance Standard ABS SECTION10 Page 1 of 1
YARD

TEST METHOD CONSUMABLES SURFACE CONDITION


Solvent Removable Cleaner SKC-S Welded Grinded
Water Washable Penetrant SKL-SP2 Machined Others
Post-Emulsifying Developer SKD S2 Forged
Visible Emulsifier - Casting
Fluorescent Others Rolled

INSPECTION PROCESS
Pre-Cleaning WIPING Emulsifier Application -
Penetrant Application SPRAYING Visible Light Intensity 1000 LUX
Penetrant Removal WIPING Black Light Intensity -
Developer Application SPRAYING Minimum Developing Time 10 MIN
Drying Process NORMAL Testing Temperature AMBIENT
Minimun Dwell Time 5 MIN Post-Cleaning BY WIPING

Item Specification 6’’ FIRE FIGHTING WATER LINE

TEST RESULTS
S.I No. Item Description Observation Result
1 COPPER JOINT FLANGE TO PIPE NO RELEVANT INDICATION ACCEPTED
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
NOTE No Relevant Indication.

Inspected by: PRAFUL PATEL. Reviewed by:

HARISHCHANDRA SHETTY
TCR ARABIA NDT Level II INTERNATIONAL MARITIME INDUSTRIES
Date Date

P.O. Box – 8143, GAS Gardens, King Abdulaziz Seaport Facility, Dammam-32224
(T) 00966-13-8475784 / 00966504997683 (e) sales@tcr-arabia.com (w) www.tcr-arabia.com