APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
- Fin Fan Cooler Heat Exchanger 11-E-1002 HC Condensate Cooler
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
- Fin Fan Cooler Heat Exchanger 16-E-1001 VRA GAS COOLER
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
- Fin Fan Cooler Heat Exchanger 31-E-1002 REGENERATION GAS COOLER
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
- Fin Fan Cooler Heat Exchanger 51-E-1005 MP MR COMPRESSOR AFTER
COOLER
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
4.3.8 Hydrotest
Hydrotest is required after the tubes cleaning are completed and
inspection has been done also the hexagonal plugs was installed, the
hydrotest will be done by other company
4.3.9 Remove Blind
The blinds will remove when the hydrotest is accepted and then
tightened the bolts as per bolting procedure,
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
- Fin Fan Cooler Heat Exchanger , 51-E-1101 , LP STEAM CONTROL CONDENSOR
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
4.3.8 Hydrotest
Hydrotest is required after the tubes cleaning are completed and
inspection has been done also the hexagonal plugs was installed, the
hydrotest will be done by other company
4.3.9 Remove Blind
The blinds will remove when the hydrotest is accepted and then
tightened the bolts as per bolting procedure,
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
Fin Fan Cooler Heat Exchanger , 051-E-1103, Condensate Flash Drum Condenser
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Plug Sheet
Gasket Material Plug Diameter Torque N.M
Soft Iron 1” 250
4.3.8 Hydrotest
Hydrotest is required after the tubes cleaning are completed and
inspection has been done also the hexagonal plugs was installed, the
hydrotest will be done by other company
4.3.9 Remove Blind
The blinds will remove when the hydrotest is accepted and then
tightened the bolts as per bolting procedure,
Bolt Torque
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
Fin Fan Cooler Heat Exchanger , 051-E-1105 CONDENSATE FLUSH DRUM VENT
CONDENSOR
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Nozzle size
Nozzle Size Bolt Dia Wrench Size Torque NM
4” 150# 5/8” 1 1/16” 149
8” 150# 3/4” 1 1/4” 264
10” 150# 7/8” 1 7/16” 420
4.3.8 Hydrotest
Hydrotest is required after the tubes cleaning are completed and
inspection has been done also the hexagonal plugs was installed, the
hydrotest will be done by other company
4.3.9 Remove Blind
The blinds will remove when the hydrotest is accepted and then
tightened the bolts as per bolting procedure,
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Hexagonal Plug and Nozzle
4.3.4 Mechanical Cleaning With High Pressure Pump
4.3.5 Tube Inspection
4.3.6 Re-install Hexagonal Plug and Nozzle
4.3.7 Bolt Tightening
4.3.8 Hydro test
4.3.9 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
Fin Fan Cooler Heat Exchanger , 071-E-1001B BOG COMPRESSOR AFTER COOLER
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the hexagonal plugs
are free from leakage, fin tubes in good condition and not in bent condition,
Header & Nozzle still in good condition , coating material was not corrosion,
etc.
4.3.5 INSPECTION
After mechanical cleaning finish, inspection will performed to the
header box and finned tube.
Nozzle size
Nozzle Size Bolt Dia Wrench Size Torque NM
6” 150# 3/4” 1 1/4” 264
4.3.8 Hydrotest
Hydrotest is required after the tubes cleaning are completed and
inspection has been done also the hexagonal plugs was installed, the
hydrotest will be done by other company
4.3.9 Remove Blind
The blinds will remove when the hydrotest is accepted and then
tightened the bolts as per bolting procedure,
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind shell & Tube
4.3.3 Open Cover inlet & outlet
4.3.4 Open Manhole
4.3.5 Mechanical Cleaning With High Pressure Pump
4.3.6 Air blowing
4.3.7 Tube Inspection
4.3.8 Re-install Cover inlet & outlet
4.3.9 Close manhole
4.3.10 Bolt Tightening
4.3.11 Hydro test / Pneumatic
4.3.12 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
Fin Fan Cooler Heat Exchanger , 31-E-1001 Dehydration Pre-Cooler
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of Fin Fan Cooler heat exchanger, PT.
Bhumi Phala Perkasa will perform visual inspection to the Coating Condition,
tube leakage, Nozzle condition , channel and covers condition, etc.
If there found a corrosion or deterioration from the visual inspect , then
further detail inspection are required.
4.3.7 INSPECTION
After mechanical cleaning is done , inspection will performed as per
inspection procedure
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Revision Summary
Table Contents
1 General
2 Applicable Specification, Code , Standard & Other References
3 Applicable Item
4 Procedure
4.1 Visual Inspection
4.2 Draining & free gas
4.3 Maintenance Task
4.3.1 Preparation
4.3.2 Install Blind
4.3.3 Open Channel Head
4.3.4 Pull out tube bundle
4.3.5 Deliver bundle to cleaning area
4.3.6 Mechanical Cleaning With High Pressure Pump
4.3.7 Air blowing
4.3.8 Tube Inspection
4.3.9 Insert tube bundle
4.3.10 Hydrotest / Pneumatic Test
4.3.11 Re-install Channel Head Cover
4.3.12 Bolt Tightening
4.3.13 Remove blind
4.4 Purging & Leak test
4.5 Waste Management & House keeping
5 Attachment
3. APPLICABLE ITEM
Heat Exchanger , 041-E-1012 LPG Reinjection Cooler
4. Procedure
4.1 VISUAL INSPECTION
Prior start of the mechanical cleaning of the heat exchanger, PT. Bhumi Phala
Perkasa will perform visual inspection to the covers, channel box, tube sheet
& tube leakage, tube bundle in good condition and coating material was not
corrosion, etc.
If there found any damage from the visual inspection so need to repair or
replace with further detail inspection
4.3.4.4 Ensure lifting gear are prepared properly and meet with the
capacity of lifting
If all above items are ready then pull out the bundle as per Bundle
puller Operating procedure
4.3.10.4 Ensure lifting gear are prepared properly and meet with
the capacity of lifting
If all above items are ready, then insert the bundle as per Bundle
puller Operating procedure ,
Reminder to install gasket of bundle to tUbe sheet must be installed
before bundle insert to the shell side
APPROVAL SHEET
A – Approved
B - Approved with Comment
C – Resubmit for Approval
D – Retained for Information Only
Date :
(……………………..) (……………………..)
Revision Status
PT. BPP
Rev Issue Date Prepared Cheked Approved Issue Purpose Signature
by by by
A 08-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 8
1. Latar Belakang
Prosedur kerja ini berisikan langkah/panduan dalam melaksanakan pekerjaan
pengoperasian ultra high pressure kapasitas 20k Psi dan 40k Psi. Penggunaan ultra high
pressure ini bertujuan untuk memudahkan pada saat proses pembersihan sisi tube pada
heat exchanger model Shell & Tube, Air Fan Cooler, Plate Heat Exchanger maupun
Printed Heat Exchanger.
2. Lingkup
Pekerjaan ini akan diaplikasikan pada setiap unit HEX yang ada di area BP BERAU Ltd.
Pages 3 of 8
5. Peralatan Yang Digunakan
1. Ultra High Pressure WOMA
2. Flexible Lance
3. Barracuda Nozzle, Straight, Rotating
4. Foot Valve
7. Peralatan Keselamatan
Gunakan Alat Pelindung Diri (APD) yang tertera dibawah ini untuk mengurangi paparan
terhadap potensi bahaya yang mungkin timbul selama melakukan pekerjaan.
No Deskripsi Alat Pelindung Diri/Peralatan Keterangan
Keselamatan Lainnya
1 Standar Safety Hat
Safety Shoes
Safety Glasses
Pakaian Kerja & Rain coat Digunakan Selama Bekerja
Face Shield
Hand Gloves Light Duty &
Rubber
2 Khusus Digunakan pada saat menginstall
Insulating Gloves
peralatan electrical
Hepa Mask (OV/AG Gunakan pada saat tercium bau
Organic/Vapor/Acid) gas
Pages 4 of 8
9. Objek Yang Di Periksa
Object pemeriksaan adalah sebagai berikut:
Pages 5 of 8
10. Pelaksanaan
No. Urutan Tugas Pekerjaan
1 Persiapan
Semua crew mempersiapkan segala hal yang berhubungan dengan pekerjaan ini
yakni toolbox meeting dan mempersiapkan tools.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas
diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang
buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
2 Pemeriksaan Mesin Ultra High Pressure
Sebelum melakukan pekerjaan pembersihan pastikan fuel di dalam tanki ultra high
pressure sudah cukup, aksesoris ultra high pressure seperti flexible lance, hose
Pages 6 of 8
water, foot valve dan nozzle sudah tersedia.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas
diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang
buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
3 Menyalakan Peralatan Ultra High Pressure
Setelah semua sudah di pastikan untuk peralatan dan fuel di unit ultra high
pressure maka mesin siap di nyalakan dengan putar kunci ke arah kanan dari main
panel atau tekan tombol ON.
Pasang flexible lance lengkap dengan nozzle pada sambungan yang terdapat di
pompa plunger.
Isi tanki denga air bersih dan pasang selang air, sambungkan ke dalam tanki air
untuk proses pembersihan HEX.
Potensi Bahaya
Peralatan menggunakan installasi listrik, Bahaya tersandung, terpeleset, area kerja
licin/berlumpur, terdapat pipa panas diarea kerja, terpapar H2s & CO, adanya
sarang tawon, lipan, ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Pastikan operator peralatan ECT Qualified Person, Posisikan tubuh anda pada
posisi aman, gunakan PPE standar,safety helmet, safety shoes, hand gloves,
safety glass, periksa kadar gas H2S dengan gas detector, pastikan area kerja
terbebas dari binatang berbisa & buas.
4 Melakukan Pekerjaan Pembersihan Secara Mekanikal
Pages 7 of 8
- Operator ultra high pressure di nyatakan siap setelah pemasangan
scaffolding, buka cover channel pada unit HEX yang akan di lakukan
pembersihan sudah selesai.
- Posisikan penempatan nozzle, flexible lance pada are tube yang akan
di lakukan pembersihan
Pages 8 of 8
Pastikan operator peralatan ultra high pressure Qualified Person, Posisikan tubuh
anda pada posisi aman, gunakan PPE standar,safety helmet, safety shoes, hand
gloves, safety glass, periksa kadar gas H2S dengan gas detector, pastikan area
kerja terbebas dari binatang berbisa & buas.
5 Mematikan Mesin Ultra High Pressure
Mesin di matikan setelah pekerjaan dinyatakan selesai dengan memutar kunci ke
arah kiri atau tombol OFF.
Lepas flexible lance beserta nozzle dari pompa plunger dan gulung dengan benar
flexible lance dan di tempatkan ke dalam tool box.
Potensi Bahaya
Peralatan menggunakan installasi listrik, Bahaya tersandung, terpeleset, area kerja
licin/berlumpur, terdapat pipa panas diarea kerja, terpapar H2s & CO, adanya
sarang tawon, lipan, ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Pastikan operator peralatan Ultra High Pressure Qualified Person, Posisikan tubuh
anda pada posisi aman, gunakan PPE standar,safety helmet, safety shoes, hand
gloves, safety glass, periksa kadar gas H2S dengan gas detector, pastikan area
kerja terbebas dari binatang berbisa & buas.
Description Date
Approval Date
Pages 9 of 8
Document Number:
CLIENT : N/A
REVISION :A
APPROVAL SHEET
A – Approved
Date :
(……………………..) (……………………..)
Revision Status
Fabricator
Rev Issue Date Prepared Checked Approved Issue Purpose Owner Signature
by by by
A 09-08-2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 7
Table of Contents
Revision Summary ........................................................................................................................... 2
Table of Contents ............................................................................................................................. 3
1. General......................................................................................................................................... 4
2. Applicable Specification, Code & Standard ................................................................................. 4
3. Applicable Item............................................................................................................................. 4
4. Thread Repair Procedure............................................................................................................. 4
6. Acceptance Criteria ...................................................................................................................... 4
7. Documentation ............................................................................................................................. 4
Pages 3 of 4
1. GENERAL
This procedure covers minimum requirements for thread repair of sheet plugs for Air Cooled
Heat Exchanger 042-E-1010
3. APPLICABLE ITEM
- Air Cooled Heat Exchanger and Shell ana Tube
Pages 4 of 4
Document Number:
EXPAND PROCEDURE
DOCUMENT NUMBER : SOP-BPP-EXP-13-AFCST
CLIENT : N/A
REVISION :A
APPROVAL SHEET
A – Approved
Date :
(……………………..) (……………………..)
Revision Status
Fabricator
Rev Issue Date Prepared Cheked Approved Issue Purpose Owner Signature
by by by
A 09/08/2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 7
Table of Contents
Revision Summary ........................................................................................................................... 2
Table of Contents ............................................................................................................................. 3
1. General......................................................................................................................................... 4
2. Applicable Specification, Code & Standard ................................................................................. 4
3. Applicable Item............................................................................................................................. 4
4. Application Of Expansion ............................................................................................................. 4
5. Tube Wall Reduction Calculation ................................................................................................. 5
6. Acceptance Criteria ...................................................................................................................... 7
7. Documentation ............................................................................................................................. 7
Pages 3 of 7
1. GENERAL
This procedure covers minimum requirements for tube expansion of Bundle Cooler for Air
Cooled Heat Exchanger 042-E-1010
3. APPLICABLE ITEM
- Air Cooled Heat Exchanger and Shell and Tube
4. APPLICATION OF EXPANSION
4.1. Expander
4.1.1.Electrically operated expanders and accessories with torque control or pneumatically
operated expanders are also permissible if a reliable torque control is provided and
the driving air can be completely drawn.
4.1.2.Expander's tool
4.1.3.Tube end facer.
4.2. Cleaning
4.2.1.Tube
Clean the outside and inside of the tube and wipe them with a clean, white and lint
free cotton cloth before and during tubing.
4.2.2.Tubesheet
All contamination in the holes of the tubesheet such as rust, dirt, grease ; oil (etc.) to
be removed before tubing.
4.2.3.Expander Tool
Cleaning shall be done before and during the usage of tool.
Pages 4 of 7
6) Number of pins in the cage
7) Frequency of verifying percent wall reduction
4.3.3 Make sure the tube sheets, which have been machined as required tolerances,
special closed fit as specified in API 661 6ed table II, in accordance with relevant
drawings. The inside edges of tube sheet holes shall be free of burrs and sharp
corners to prevent cutting of tubes.
4.3.4 Cleaning shall be accomplished through the use of compressed air, power brush
with iron free type, etc.
4.3.5 The tube sheet holes and tube shall be checked for over-sizing and tolerances prior
to installation in to position. Over sizing report shall submit to client for information.
4.3.6 Align of tube sheet horizontally on the bundle to prevent relative movement in any
direction.
4.3.7 Stay tube sheet and specified arrangement in position by light rolling a few tubes
with heavy expand.
4.3.8 Insert all tubes carefully with correct protrusion at the ends as requirements as
shown on drawings.
4.3.9 Check the torque at the expander display indicator, base on input of percentage of
reduction that shown on the expander display.
Pages 5 of 7
E = ( D – A ) + C + 2B%
Where :
A = Tube outside diameter (mm)
B = Tube wall thickness ( mm )
C = Tube inside diameter before expand (mm)
D = Tube hole diameter on tube sheet (mm)
E = Tube inside diameter after expand (mm)
% = Desired percent of wall reduction
Table-1. Allowable tubes wall thickness reduction for roller-expanded tubes to tubes sheet joints API 661 the
latest edition
Percentage Tube
` Tube Sheet Material
Wall Reduction
• The tube shall not be over rolled. An inside tube gauge shall be used to check every
final dimension during the rolling operation.
• Check the horizontal dimensions while rolling to maintain proper measurement and
alignment. If it required being necessary to re-roll joint, it should be done lightly by
rolling several times. Heavy rolling that is likely to cause excessive deformation of
the affected tube to tube sheet material with a consequent reduction in strength and
stability of the jointed rolled.
• Dimensions of tubes must be recorded in a form for inspection and record.
Pages 6 of 7
6. ACCEPTANCE CRITERIA
1. Result of expansions shall conform to Para 5.6, which applicable to selected material.
2. All tubes shall be full inspected by Inside Micrometer to check the reduction thickness.
3. Torque of heavy expand shall be inspected as per percentage of reduction at the
display of expander tools.
7. DOCUMENTATION
Result of expansion shall be reported and verified
Pages 7 of 7
Document Number:
CLIENT : N/A
REVISION :A
APPROVAL SHEET
A – Approved
Date :
(……………………..) (……………………..)
Revision Status
Fabricator
Rev Issue Date Prepared Cheked Approved Issue Purpose Owner Signature
by by by
A 09/08/2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 7
1. Latar Belakang
Prosedur kerja ini berisikan langkah/panduan dalam melaksanakan pekerjaan tube plugging
pada HEX dengan model shell and tube dan Air Fan Cooler..
Penggunaan tube plugging ini jika ada di temukan kebocoran pada HEX model shell and tube
di antara tube sheet dan tube, pada model Air Fan Cooler di antara sisi header box dan tube
side.
2. Lingkup
Pekerjaan ini akan diaplikasikan pada setiap unit HEX yang ada di area CGS-1, CGS-3, CGS-
4, CGS-5 & CGS-10.
Pages 3 of 7
1. Hammer Bronze
2. Material Tappered Plug
7. Peralatan Keselamatan
Gunakan Alat Pelindung Diri (APD) yang tertera dibawah ini untuk mengurangi paparan
terhadap potensi bahaya yang mungkin timbul selama melakukan pekerjaan.
No Deskripsi Alat Pelindung Diri/Peralatan Keterangan
Keselamatan Lainnya
1 Standar Safety Hat
Safety Shoes
Safety Glasses
Digunakan Selama Bekerja
Pakaian Kerja & Rain coat
Face Shield
Hand Gloves Light Duty
2 Khusus N/A
N/A
CO 0 ppm 10 ppm
Multi Gas Detector
H2S 0 ppm 5 ppm
Pages 4 of 7
9. Objek Yang Di Periksa
Object pemeriksaan adalah sebagai berikut:
Spesikasi Tube HEX (contoh)
Equipment Name
Tube Thickness Tube Total
OD
No Location Material (mm) length Tube
(mm)
Spect (mm)
Tag / Item No
HEX
1 CGS-1 SA 214 19.05 2.11 6090 534x2
A/B/C/D/E/F/G/H
HEX
2 SA 214 19.05 2.11 6090 534x2
A/C/D/E/F/G/H/J CGS-3
/K/L/M
HEX SA 214 19.05 2.11 6090 534x2
3 CGS-4
A/B/C/D/E/F/G/H
HEX
1/2/3/4/5/6/7/8 SA 214 19.05 2.11 6090 534x2
4 CGS-5
/9/10/11/12/13/14
/15/16/17/18/19/20
HEX A213-TP
19.05 1.65 6090 926
5 1/2/3/4/5/6/7 CGS-10 316L
10. Pelaksanaan
No. Urutan Tugas Pekerjaan
1 Persiapan
Semua crew mempersiapkan segala hal yang berhubungan dengan pekerjaan ini
yakni toolbox meeting dan mempersiapkan tools.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas
diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang
buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
2 Persiapan Raw Material dan Machining
Material round bar di persiapkan oleh team PT. Bhumi Phala Perkasa dengan
spesifikasi atau grade material yang sudah di setujui oleh pihak CPI dan
selanjutnya raw material bisa di proses machining untuk di buatkan tapered plug.
Pages 5 of 7
Potensi Bahaya
Bahaya tersandung, terpeleset dan area kerja licin.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass.
3 Persiapan Peralatan
Sebelum melakukan pekerjaan tube plugging agar di pastikan semua peralatan
seperti bronze hammer material plug sudah tersedia dengan jumlah yang tube
yang akan di lakukan proses penutupan.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas
diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang
buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
4 Pemasangan Plug di Tube HEX
Pemasangan tapered plug di tube HEX berdasarkan dari hasil temuan atau
inspeksi pada tube yang di temukan bocor.
Langkah pemasangan seperti tempatkan tapered plug yang telah di marking oleh
team inspection dan kemudian tapered plug di pukul dengan menggunakan bronze
hammer.
Pastikan tapered plug tersebut pemasangannya sudah benar dan tight.
Pages 6 of 7
Potensi Bahaya
Finger injury, Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat
pipa panas diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan
binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
5 Melakukan Pekerjaan Visual Inspeksi Terhadap Tube Yang Di Plug
Pekerjaan visual inspeksi di lakukan setelah pemasangan tapered plug di tube
sudah sesuai dan benar.
Pastikan tidak ada celah atau longgar pada tapered plug.
Lakukan joint inspeksi dengan filed representative dari pihak CPI dan SMBR.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas
diarea kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang
buas lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet,
safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
Pages 7 of 7
11. Informasi Pengendalian Dokumen
Description Date
Approval Date
Pages 8 of 7
Document Number:
PERKASA
CLIENT : N/A
REVISION :A
APPROVAL SHEET
A – Approved
Date :
(……………………..) (……………………..)
Revision Status
Fabricator
Rev Issue Date Prepared Cheked Approved Issue Purpose Owner Signature
by by by
A 09/08/2018 DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 7
I. Tujuan
Prosedur Kerja ini berisi langkah langkah/panduan untuk melaksanakan pekerjaan
mengeluarkan dan memasang HEX tube bundle dengan tube bundle extractor.
II. Lingkup
Prosedur ini berlaku untuk semua pekerjaan menggunakan tube bundle extractor disetiap
HEX yang berada di CGS-1/CGS-3/CGS-4/CGS-5/CGS-10.
Pages 3 of 7
- Helper
- Safety standby
CO 0 ppm 10 ppm
Multi Gas Detector
H2S 0 ppm 5 ppm
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
Pages 4 of 7
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector,
pastikan area kerja terbebas dari binatang berbisa & buas.
2 Posisikan Peralatan
Sebelum memulai pekerjaan, posisikan semua peralatan seperti FOCO truck,
Mobile Crane dan Tube Bundle Extractor yang akan digunakan sesuai
perencanaan.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, Mobile Crane & FOCO
truck yang mundur/maju, area kerja licin/berlumpur, terdapat pipa panas di area
kerja, terpapar H2S & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, perhatikan langkah dan posisi
tubuh, posisikan tubuh anda pada posisi aman, gunakan PPE standar, safety
helmet, safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
3 Membuka Cover & Head Cover Channel
- Membuka cover & head cover channel dilakukan stelah pekerjaan chemical
cleaning selesai dilakukan.
- Pelepasan cover dan head cover channel dari shell dibantu dengan FOCO truck
untuk proses pengangkatannya.
- Letakkan cover & head cover channel di tempat yang aman yang telah
ditentukan.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator FOCO truk, Bahaya tersandung, terpeleset, area kerja
licin/berlumpur, terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang
tawon, lipan, ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator FOCO truk, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
4 Persiapan Penarikan Tube Bundle
- Mempersiapkan penampungan/lantai kerja yang mampu
menampung/menahan liquid yang terdapat dalam shell agar tidak
Pages 5 of 7
langsung terkena tanah pada saat pelepasan tube bundle.
- Posisikan crane dengan perhitungan yang matang agar kapasitas angkat
dari crane bisa memenuhi persyaratan dengan beban yang akan diangkat.
- Posisikan tube bundle extractor sejajar dengan shell dengan bantuan
mobile crane dengan posisi pengait tube bundle extractor berada dibagian
belakang shell flange sebagai penahan.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator FOCO truk, Bahaya tersandung, terpeleset, area kerja
licin/berlumpur, terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang
tawon, lipan, ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator FOCO truk, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass, periksa
kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari binatang
berbisa & buas.
5 Penarikan Tube Bundle
- Tarik keluar tube bundle perlahan dengan bantuan wire sling yang dikaitkan
dengan hydraulic extractor, setelah dirasa cukup lepaskan wire sling dan kaitkan
hydraulic extractor dengan tube sheet, kemudian tarik perlahan sampai tube
bundle keluar dari shell dan dengan mengatur keseimbangan tube bundle
extractor.
Pages 6 of 7
Tube bundle yang ditarik menggunakan wire sling
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
operator tube bundle extractor dengan signalman, tube bundle Bahaya tersandung,
terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea kerja, terpapar H2S&
CO, adanya sarang tawon, lipan, ular dan binatang buas lainnya.
Pages 7 of 7
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara operator tube bundle extractor dengan signalman, posisikan tubuh anda
pada posisi aman, gunakan PPE standar,safety helmet, safety shoes, hand gloves,
safety glass, periksa kadar gas H2S dengan gas detector, pastikan area kerja
terbebas dari binatang berbisa & buas.
6 Pengangkatan Tube Bundle Kedalam Basket
Angkat tube bundle dari tube bundle extractor ke dalam basket yang sudah
disiapkan dengan crane.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
7 Pengangkatan Basket Tube Bundle ke FOCO Truck
Basket tube bundle diangkat menggunakan crane ke FOCO truk untuk kemudian
dimobilisasi ke area cleaning CGS-3.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
8 Housekeeping
Semua crew melakukan pembersihan area kerja setelah pekerjaan telah selesai
dilakukan
Pages 8 of 7
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2S& CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan
posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector,
pastikan area kerja terbebas dari binatang berbisa & buas.
B Install Tube Bundle (Memasang Tube Bundle)
1 Persiapan
Pastikan semua crew telah menyiapkan semua hal yang berhubungan dengan
pekerjaan install tube bundle, lakukan toolbox meeting dan persiapan tools.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector,
pastikan area kerja terbebas dari binatang berbisa & buas.
2 Posisikan Peralatan
Sebelum memulai pekerjaan, posisikan semua peralatan seperti FOCO truck,
Mobile Crane dan Tube Bundle Extractor yang akan digunakan sesuai
perencanaan.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, Mobile Crane & FOCO
truck yang mundur/maju, area kerja licin/berlumpur, terdapat pipa panas di area
kerja, terpapar H2S & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, perhatikan langkah dan posisi
tubuh, posisikan tubuh anda pada posisi aman, gunakan PPE standar, safety
helmet, safety shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas
detector, pastikan area kerja terbebas dari binatang berbisa & buas.
3 Pengangkatan Tube Bundle Ke Tube Bundle Extractor
Lakukan pengangkatan tube bundle dari basket ke tube bundle extractor, pastikan
Pages 9 of 7
posisi tube bundle pada posisi yang baik pada tube bundle extractor.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
4 Mengatur Posisi Tube Bundle Extractor
Set up tube bundle extractor dan atur keseimbangan tube bundle extractor dengan
menggeser hanger puller. Pasang dan posisikan puller unit ke shell dengan dua buah
wire sling pengikat dengan kokoh.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass, periksa
kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari binatang
berbisa & buas.
5 Memasukan Tube Bundle ke Dalam Shell
Dorong tube bundle dengan hydraulic extractor kedalam shell secara perlahan-lahan
hingga tube bundle bisa masuk dan duduk dengan sempurna.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Pages 10 of 7
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass, periksa
kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari binatang
berbisa & buas.
6 Melepas Tube Bundle Extractor Dari Shell
Sebelum melepas tube bundle extractor dari shell atur keseimbangan unit terlebih
dahulu kemudian lepaskan wire sling pengikat, dan tube bundle extractor dapat
diangkat.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
7 Install Cover & Head Channel
Pemasangan cover &Head channel dilakukan setelah tube bundle terinstall dengan
benar. Lakukan pemasangan cover & head channel dengan bantuan crane.
Potensi Bahaya
Pihak yang tidak berkepentingan memasuki area kerja, komunikasi yang buruk antara
rigger dan operator crane, Bahaya tersandung, terpeleset, area kerja licin/berlumpur,
terdapat pipa panas diarea kerja, terpapar H2S& CO, adanya sarang tawon, lipan,
ular dan binatang buas lainnya.
Tindakan Pencegahan & Pengendalian
Baricade area kerja sebelum memulai pekerjaan, membuat komunikasi yang baik
antara rigger dengan operator crane, posisikan tubuh anda pada posisi aman,
gunakan PPE standar,safety helmet, safety shoes, hand gloves, safety glass,
periksa kadar gas H2S dengan gas detector, pastikan area kerja terbebas dari
binatang berbisa & buas.
8 Housekeeping
Pages 11 of 7
Semua crew melakukan pembersihan area kerja setalah pekerjaan telah selesai
dilakukan.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2S& CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan
posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector,
pastikan area kerja terbebas dari binatang berbisa & buas.
Approval Date
Pages 12 of 7
Document Number:
PERKASA
CLIENT : N/A
REVISION :A
APPROVAL SHEET
A – Approved
Date :
(……………………..) (……………………..)
Revision Status
Fabricator
Rev Issue Date Prepared Cheked Approved Issue Purpose Owner Signature
by by by
A 09/08/2018 ASP JS DYN ISSUED FOR REVIEW
REVISION SUMMARY
Page 2 of 7
I. Tujuan
Prosedur kerja ini berisikan langkah/panduan dan menjadi panduan dalam
melaksanakan pekerjaan uji kebocoran Vacuum Test shell tube heat exchanger. Vacuum
test bertujuan untuk mendeteksi kebocoran pada tube dengan cara membuat udara
didalam tube yang akan diuji menjadi hampa udara, kebocoran akan terdeteksi lewat alat
ukur yang terpasang pada test gun.
II. Lingkup
Pekerjaan ini akan diaplikasikan pada setiap unit Heat Exchanger.
Pages 3 of 9
5. Hose Angin
CO 0 ppm 10 ppm
Multi Gas Detector
H2S 0 ppm 5 ppm
A. Persiapan
1. Pastikan crew telah mempersiapkan semua hal yang berhubungan dengan pekerjaan
vacuum test yakni toolbox meeting & mempersiapkan tools
Pages 4 of 9
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
3. Pilih dan pastikan ukuran seal dan nozzle yang terpasang sudah tepat untuk dimensi
tube yang akan diuji. Pasang seal dan nozzle pada Vacuum test gun dan T handle.
Pages 5 of 9
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
4. Memasang selang angin pada vacuum test gun untuk dihubungkan dengan air
instrument yang terdapat diarea kerja. Test gun akan dioperasikan dengan suplai
udara antara 40 sampai 130 psi.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
B. Pelaksanaan
Plug kedua ujung tube dengan T handle dan Vcuum Test Gun.
Pages 6 of 9
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector, pastikan
area kerja terbebas dari binatang berbisa & buas.
Buka valve vacuum test gun dengan memutarnya kekanan untuk mulai menghasilkan
vakum, sampai vacuum level pada gauge berhenti. (Vacuum pressure ditentukan 5-7
Psi).
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tutup valve vacuum test gun dengan memutarnya kekiri dan kemudian amati
Pages 7 of 9
vacuum gauge pada vacuum test gun. Setiap kebocoran pada tube akan
diidentifikasi dengan penurunan pembacaan pada vacuum gauge.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector, pastikan
area kerja terbebas dari binatang berbisa & buas.
Jika tidak ada tube yang bocor, lepaskan vacuum test gun dan T-handle plug
dari ujung tube, masukan kembali ke ujung tube yang akan dilakukan
pengujian berikutnya. Tandai tube yang terdeteksi bocor untuk diperbaiki.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
lainnya.
Tindakan Pencegahan & Pengendalian
Posisikan tubuh anda pada posisi aman, gunakan PPE standar,safety helmet, safety
shoes, hand gloves, safety glass, periksa kadar gas H2S dengan gas detector, pastikan
area kerja terbebas dari binatang berbisa & buas.
5 Housekeeping
Lakukan pembersihan area kerja setelah semua pekerjaan telah selesai dilakukan.
Potensi Bahaya
Bahaya tersandung, terpeleset, area kerja licin/berlumpur, terdapat pipa panas diarea
kerja, terpapar H2s & CO, adanya sarang tawon, lipan, ular dan binatang buas
Pages 8 of 9
lainnya.
Approval Date
Pages 9 of 9