Shariatpur District.
A. BUILDING WORKS
A.1 CIVIL WORKS
A.1.1 Foundation Upto Plinth Level
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
1 Preparation work of site including given layout of Sqm 186.99 15.00 2,804.85
structure
2 Earth work in excavation in foundation trenches 0.00
or any other places
(a) Upto 1.5m depth and 60m lead CuM 729.91 189.00 137,952.99
(c) In pedestal and column,column capital, lift CuM 10.08 7,730.00 77,918.40
wall etc,
(d) Beam at plinth level / below plinth level CuM 10.43 7,602.00 79,288.86
(b) Foundation Beam/ Grade beam/ Tie beam SqM 103.00 381.00 39,243.00
(c) In pedestal and column,column capital, lift SqM 95.46 429.00 40,952.34
wall etc,
(d) Beam at plinth level / below plinth level SqM 101.65 417.00 42,388.05
### ###
1 250mm thick Brick work with 1st class bricks and
medium sand of F.M.1.20
463607067.xls Page-2
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
3 RCC work in 1:2:4 with brick chips (f'c=19 MPa) 0.00
using 50% course sand F.M. 2.20 and 50%
medium sand F.M.1.2
(a) In column 0.00
(i) Ground floor CuM 7.50 7,730.00 57,975.00
463607067.xls Page-3
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
(a) In column 0.00
8 TILES WORKS
###
a. Supplying, fitting and fixing unglazed Sqm 385.00 1663.00 640,255.00
homogeneous floor tiles (size 400 mm x
400 mm local made)
b. Supplying, fitting and fixing unglazed Sqm 21.50 1526.00 32,809.00
homogeneous floor tiles (size 300 mm x
300 mm local made)
c. Supplying, fitting and fixing white glazed Sqm 107.50 1571.00 168,882.50
wall tiles (size 250 mm x 400 mm local
made)
9 Supplying, fitting and fixing of door frame with 0.00
38mm x 38mm x 6mm M.S. angle
(a) Double leaf shutter RM 6.00 611.00 3,666.00
10 Supplying & cutting, fitting and fixing of 5mm SqM 1.35 3,410.00 4,603.50
thick clear glass in counter including M.S. frame
as per drawing
###
flush door shutter
a. Gamari Sqm 62.00 11779.00 730,298.00
(b) Using M.S. structural frame and shutter of SqM 6.10 3,295.00 20,099.50
window/ventilator
15 a. Supplying, fitting & fixing of Aluminium SqM 65.90 3,563.00 234,801.70
sliding window having 1.5 mm thick outer
bottom
15 b. Supplying, fitting & of Aluminium sliding SqM 65.90 1,352.00 89,096.80
window 5 mm thick tinted glass
463607067.xls Page-5
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
16 Supplying, fitting and fixing MS grills of any SqM 84.00 2,473.00 207,732.00
design made with approx 12 x 12 mm M.S. solid
bar 140 mm c/c with outer frame of approx
38x6mm F. I. bar including fabricating, welding
cost of electricity and tools and plants etc.
complete for all floors accepted by the Engineer.
(Total weight per sqm should be min 12 kg. and
add or deduct. @ Tk. 136 for each kg. excess or
less respectively)
17 Supplying, fitting and fixing of approved best Each 14.00 375.00 5,250.00
quality pad lock (62mm) Foreign made
18 Plaster work 0.00
(a) 12mm thick cement plaster skirting/dado SqM 160.00 280.00 44,800.00
on any other places in 1:4 with neat
cement finishing
(b) 12mm thick cement plaster in 1:6 to wall 0.00
(i) Ground floor SqM 832.00 228.00 189,696.00
(ii) 1st floor SqM 710.00 242.00 171,820.00
23 Plastic emulsion paint to wall and ceiling, 2 coats SqM 1775.00 273.00 484,575.00
over a coat of sealer
25 Providing apron with 100mm thick brick bonded SqM 18.00 832.00 14,976.00
concrete in 1:2:4 including neat cement finishing
26 Door sill work 0.00
463607067.xls Page-6
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
28 Manufacturing and supplying, fitting & fixing of SqM 13.90 5,361.00 74,517.90
stair railing using Stainless Steel (S.S.) of
standard height with 2 mm thick 2.5" dia pipe for
hand rail as per drawing and accepted by the
Engineer.
32 Water proofing work using R.C. pad in 1:2:4 CuM 19.25 7,602.00 146,338.50
including neat cement finishing, using
33 reinforcement
Supplying, andand
fitting paidfixing
underofreinforcement
room numberitem
and Each 8.00 600.00 4,800.00
name plate including lettering and
painting/polishing work using kathal wood upto
300mm x 125mm sizes and 20mm thick
34 Site cleaning work after completion of all works L.S. 1.00 10,000.00 10,000.00
###
1 Sanitary equipment works 0.00
2 Stainless steel sink, 450mm x 1050mm size of Set 2.00 4,144.00 8,288.00
Teca brand, made Span/Itali or approved best
quality
463607067.xls Page-7
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
3 Sanitary fixture works 0.00
(a) Shower rose, C.P. fixed type 100mm dia, Each 5.00 1,396.00 6,980.00
best quality
(b) Towel rail, C.P. 600mm long, 20mm dia, Each 9.00 711.00 6,399.00
super quality
(c) Soap tray, C.P. 150mm size, best quality Each 15.00 363.00 5,445.00
(d) Belgium mirror, 350mm x 450mm, super Each 7.00 886.00 6,202.00
quality
(e) Glass shelf, 5mm thick glass, 600mm x Each 7.00 1,412.00 9,884.00
125mm, size with C.P. rial, super quality
(iii) 125mm dia stainless steel floor Each 10.00 257.00 2,570.00
grating
(g) Bib cock, C.P. 12mm dia Each 15.00 1,104.00 16,560.00
(h) Goose neck vent pipe, 12mm dia and 1.5m Each 2.00 360.00 720.00
long G.I. pipe
(i) Elbow operated C.P. pillar cock Each 1.00 1,280.00 1,280.00
(b) C.P. stop cock, 12mm dia for shower only Each 5.00 1,197.00 5,985.00
(c) C.P. Angle concealed stop cock Each 15.00 913.00 13,695.00
5 uPVC pipe line works with uPVC fittings in RM 48.00 617.00 29,616.00
100mm dia soil-cum-vent pipe
6 uPVC pipe line works with uPVC fifftings for 0.00
waste water and rain water
(a) 100mm dia RM 87.00 617.00 53,679.00
463607067.xls Page-8
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
(a) 40mm dia RM 16.00 669.00 10,704.00
9 G.I. pipe concealing work in brick or R.C. places RM 75.00 65.00 4,875.00
10 Inspection chamber with R.C. cover slab of clear Each 8.00 9,993.00 79,944.00
600 x 600mm and maximum 750mm depth
11 Collection pit work in 450mm x 450mm clear size Each 1.00 3,530.00 3,530.00
and depth 750mm
12 Septic tank for 50 users Each 1.00 121,120.00 121,120.00
15 40mm dia 450mm long uPVC rain spout with one Each 2.00 135.00 270.00
bend in end
463607067.xls Page-9
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
i. 1C-2x2.5mm2 BYM cable with 2.5mm² RM 700.00 190.00 133,000.00
(BYA) ECC wire through PVC pipe of
minimum inner dia 16mm having wall
thickness 1.5mm
ii. 1C-2x4mm2 BYM cable with 4mm2 (BYA) RM 40.00 259.00 10,360.00
ECC through PVC pipe of minimum inner
dia 20mm having minimum wall thickness
1.5mm
iii. 1C-2x6mm2 BYM Cable with 6mm2 (BYA) RM 25.00 335.00 8,375.00
ECC through PVC Pipe 25mm dia
3 Distribution/Sub-Distribution/Meter/ Machine Box: 0.00
463607067.xls Page-10
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
d. Security Light 0.00
b. Energy Saving Lamp 25watt (Pin Type Each 60.00 296.00 17,760.00
Energypac, Grameen Shakti or Equivalent
product or any brand )
c. Energy Saving Lamp 11watt (Pin Type Each 20.00 260.00 5,200.00
Energypac, Grameen Shakti or Equivalent
product or any brand )
8 Supply and installation of A.C. Capacitor type 0.00
ceiling fan of sizes as mentioned in the bill of
quantities complete ith 16mm dia 3.048m (or of
required length) long M.S. down rod, blades,
canopy, capacitory, regulator, connecting PVC
wire etc. all complete in all respect as per
direction of the Engineer-in-Charge.
9 i. Providing & fixing of Box-type Fan clamp Each 22.00 133.00 2,926.00
made of 25.4mm x 6.35mm flat bar with
16mm dia M.S. Rod hook.
10 a. Supply and installation of 250 volts single 0.00
phase 3-pin 15A combined switch socket
outlet (MK England or equivalent product
of Germany/ USA/UK/France/Japan/Itally/
Sweden/Switzerland/Australia) mounted on
required size 18 SWG galvanized plain
sheet board of 76.2mm depth with 3mm
thick ebonite cover etc. complete in all
respect as per direction of the Engineer-in-
Charge.
Providing and fixing of 250 volts grade wall bell. Each 4.00 622.00 2,488.00
B. EXTERNAL WORKS
###
463607067.xls Page-11
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
###
B.1 LAND DEVELOPMENT WORK
1 Earth fill work in low laying area using imported CuM 2,662.00 302.00 803,924.00
earth including compaction
Total for Land Development Works (B.1) 803,924.00
###
1 Earth work in excavation in all kind of soil in Cum 27.60 189.00 5,217.25
foundation.
2 Earth re-filling in foundation trenches Cum 18.50 149.00 2,755.76
463607067.xls Page-12
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
6 a. 250 mm or above thick brick work in Cum 0.00 6040.00 0.00
foundation/ gaid wall(1:6).
b. 125mm thick non exposed brick work in Sqm. 96.98 948.00 91,938.38
(1:4)
7 Average 12mm thick cement sand plaster (1:6) Sqm. 193.96 228.00 44,223.52
8 Minimum 6mm thick cement sand plaster (1:4) Sqm. 90.71 186.00 16,871.38
10 Manufacturing supplying, fitting, fixing, G.I. pipe Sqm. 6.69 9011.00 60,296.65
gate (double leaf) of any design and shape
11 having 38mm
Providing dia wire
barbed G.I. pipe outer
fencing frame
with RCCand
(1:2:4) Sqm. 124.72 155.00 19,331.60
19mm
pillars. dia G.I. pipe vertical member placed @
75mm c/c by welding at top and bottom G.I. pipe
12 Lettering work of sign board LS 1.00 5,000.00 5,000.00
frame etc. all complete as per drawing and
direction of the Engineer-in-charge.
Total for Construction of Boundary Wall with Gate (B.2) 925,470.27
###
1 Supplying and sinking 40 mm dia water grade 0.00
uPVC tube well pipe having wall thickness 2.5
mm to 3.0 mm including trial boring and with all
necessary fittings as required etc. all complete
and accepted by the Engineer.
(c) 40mm dia uPVC strainer 3M long Each 3.00 500.00 1,500.00
463607067.xls Page-13
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
Providing Apron with 50mm thick cement
6 concrete sqm 32.11 917.00 29,440.62
a. Spum P.C Pole : 29.52' long pole with pole Each 1.00 12,074.00 12,074.00
erection.
2 Cross Arm (For L.T.) 0.00
a. Providing and fixing 3 spool vertical type Each 1.00 604.00 604.00
609.6mm (3'-0" long) M.S. channel wire
4 rack of size (38.10mm x 38.10mm x
L.T. Insulator 0.00
6.35mm (1.5" x 3" x 1.5"x0.25") with 2 Nos.
of `U' clamp 1 Nos. of `D' clamp made of
Providing and installation of 500 Volts grade 0.00
25.4mm x 6.3mm (1"x¼") flat M.S. bar for
porcelain shackle type L.T. insulator of size
fixing insulators and clamping the rack
89mm
a. x 76mmtype
Shackle (3.5"(L.T.
x 3") etc. all complete in all
line) Each 2.00 121.00 242.00
respectively including necessary G.I. nut,
respect as per direction of the Engineer-in-
bolts washer etc. with painting etc. all
charge.
5 Service Bracket in all respect as per direction of
complete 0.00
the Engineer-in-charge.
Providing and fixing of 1524mm (5') long 38.1mm Each 1.00 1,582.00 1,582.00
(1.5") dia G.I. pipe service bracket complete with
6 1
Guy No. of G.I. bend 2 Nos. fixing clamps of
assembly 0.00
38.10mm x 6.35mm (1.5" x 1/2") size iron flat bar
bolts nuts etc. complete as required.
Providing and fixing following size pole stay 0.00
made of stranded G.I. wires complete with Guy
insulator,
a. 8 SWG,anchor plate of size 304.8mm x
7 - strand Each 2.00 1,630.00 3,260.00
304.8mm x 6.35mm (1'x1'x¼"), 12.7mm (½") dia
stay rod of necessary length and frame, bolts,
7 Catenary wiring for service connection 0.00
nuts with necessary adjusting arrangement
complete as required to be placed within 30°-45°
(i)
angle 1C-2x10mm²
with the pole NYY Cable
etc. complete as required as RM 30.00 452.00 13,560.00
per direction of the Engineer-in-charge.
8 Energy Meter 0.00
###
B.6 ROAD AND PAVEMENT WORK
1 Earth work in box cutting upto 300mm depth and SqM 122.68 50.00 6,133.83
in all types of soil
2 Sand filling in foundation trenches F.M 8.80 Cum 18.69 635.00 11,869.16
3 Single layer brick flat soling with 1st class or SqM 122.55 438.00 53,678.61
picked jhama bricks and filled with sand of F.M.
0.80
4 250mm or above thick brick work in foundation/ guid Cum 15.51 6,040.00 93,704.67
wall(1:6).
5 Cement concrete work 1:2:4 Cum 13.08 7,517.00 98,313.93
###
Ref. of Drawing - F2 Each 1.00 7,230.00 7,230.00
###
Ref. of Drawing - F3 Each 2.00 9,330.00 18,660.00
463607067.xls Page-15
Sl. Description of Item in Short Unit Quantity Rate Amount
No. in Taka in Taka
###
1.9 Long bench
###
Ref. of Drawing - F10 Each 3.00 13,370.00 40,110.00
###
Ref. of Drawing - F11 Each 3.00 9,400.00 28,200.00
###
Ref. of Drawing - F12 Each 1.00 5,280.00 5,280.00
###
Ref. of Drawing - F13 Each 1.00 2,790.00 2,790.00
### ###
mentioned below including hammer/brass
painting,
2.1 Steel delivery
infant at
bedsite and placing in position.
###
Ref. of Drawing - F15 Each 3.00 5,170.00 15,510.00
###
Ref. of Drawing - F16 Each 4.00 17,270.00 69,080.00
463607067.xls Page-16
Estimate for Construction of NoImuri UH&FWC at Goshairhat Upazila in
Shariatpur District.
ABSTRACT OF COST
A. BUILDING WORKS AMOUNT IN TAKA
In words Taka: One crore forty eight lac seventeen thousand six hundred fifty seven and
paisa twenty two only.
Chargirish
Name of Works: Construction of Boheratola (south) UH&FWC Center at Shibc
Madaripur District. Package-No.WP-698/SDP (GOB)-HED
Item no 02
Earth work in foundation trenches.
a.Upto 1.50m Depth
= 1 x 65.33 x 34.83 x
= 2 x 15.00 x 4.75 x
= 1 x 18.75 x 8.50 x
Item no 3
Brick flat soling
(b) In foundation
= 1 x 65.33 x
= 2 x 15.00 x
= 1 x 18.75 x
Item no 05
Sand filling work in foundation, plinth & any other places of following quality sand
Sand of F.M.1.2
= 1 x 65.33 x 34.83 x
= 2 x 15.00 x 4.75 x
= 1 x 18.75 x 8.50 x
Item no 06
Earth Filling work in outer foundation trench
a)By Cutted Earth (Back filling)
Sl no.02
Deduction:(-)
Soling
= 1 x 65.33 x 34.83 x
= 2 x 15.00 x 4.75 x
= 1 x 18.75 x 8.50 x
Concrete
= 1 x 65.33 x 34.83 x
= 2 x 15.00 x 4.75 x
= 1 x 18.75 x 8.50 x
Padestal column
C1 = -2 x 1.25 x 1.50 x
C2 = -4 x 1.25 x 1.50 x
C3 = -8 x 1.25 x 1.50 x
C4 = -4 x 1.25 x 1.75 x
Item no.16
Reinforced cement concrete work (1:2:4)
= 1 x 18.75 x 8.50 x
Item no 17
= 1 x 209.83 x
= 2 x 54.50 x
Item no.18
Supplying fabrication and fixing to details as per design deformed bar.
a.40 grade deformed bar with minimum fy=276 Mpa.
(i) In all floor
(a) in foundation Raft footing
Bottom Leyer L/D
16mm dia = 1 x 11 x 67.50 =
16mm dia lap = 1 x 11 x 2.17 =
'' 6`-2`` = 2 x 10 x 6.17 =
''' 6`-1`` = 2 x 10 x 6.08 =
'' 5`-4`` = 2 x 10 x 5.33 =
Mid leyer ©
16mm dia = 1 x 12 x 67.50 =
16mm dia lap = 1 x 12 x 2.17 =
'' 6`-2`` = 2 x 11 x 6.17 =
''' 6`-1`` = 2 x 11 x 6.08 =
'' 5`-4`` = 2 x 11 x 5.33 =
5`-6``. B
16mm dia = 1 x 8 x 67.50 =
16mm dia lap = 1 x 8 x 2.17 =
'' 6`-2`` = 2 x 7 x 6.17 =
''' 6`-1`` = 2 x 7 x 6.08 =
'' 5`-4`` = 2 x 7 x 5.33 =
5`-3``. C
16mm dia = 1 x 7 x 67.50 =
16mm dia lap = 1 x 7 x 2.17 =
'' 6`-2`` = 2 x 6 x 6.17 =
''' 6`-1`` = 2 x 6 x 6.08 =
'' 5`-4`` = 2 x 6 x 5.33 =
5`-9``. B
16mm dia = 1 x 9 x 67.50 =
16mm dia lap = 1 x 9 x 2.17 =
'' 6`-2`` = 2 x 8 x 6.17 =
''' 6`-1`` = 2 x 8 x 6.08 =
'' 5`-4`` = 2 x 8 x 5.33 =
S/D
6`-1`` a
20mm dia = 2 x 9 x 37.00 =
'' 7`-2`` = 2 x 8 x 7.17 =
'' 5`-6`` = 2 x 8 x 5.50 =
'' 5`-9`` = 2 x 8 x 5.75 =
'' 11`-2`` = 2 x 8 x 11.17 =
6`-3``. B
16mm dia = 2 x 9 x 37.00 =
'' 7`-2`` = 2 x 8 x 7.17 =
''' 5`-6`` = 2 x 8 x 5.50 =
'' 5`-9`` = 2 x 8 x 5.75 =
'' 11`-2`` = 2 x 8 x 11.17 =
6`-2`` a
20mm dia = 2 x 9 x 37.00 =
'' 7`-2`` = 2 x 8 x 7.17 =
'' 5`-6`` = 2 x 8 x 5.50 =
'' 5`-9`` = 2 x 8 x 5.75 =
'' 11`-2`` = 2 x 8 x 11.17 =
6`-7``. B
16mm dia = 2 x 10 x 37.00 =
'' 7`-2`` = 2 x 9 x 7.17 =
''' 5`-6`` = 2 x 9 x 5.50 =
'' 5`-9`` = 2 x 9 x 5.75 =
'' 11`-2`` = 2 x 9 x 11.17 =
5`-4`` a
20mm dia = 2 x 8 x 37.00 =
'' 7`-2`` = 2 x 7 x 7.17 =
'' 5`-6`` = 2 x 7 x 5.50 =
'' 5`-9`` = 2 x 7 x 5.75 =
'' 11`-2`` = 2 x 7 x 11.17 =
``. B
16mm dia = 1 x 6 x 41.75 =
'' 7`-2`` = 1 x 5 x 7.17 =
''' 5`-6`` = 1 x 5 x 5.50 =
'' 5`-9`` = 2 x 5 x 5.75 =
'' 11`-2`` = 2 x 5 x 11.17 =
Porch
16mm dia = 1 x 24 x 18.25 =
16mm dia = 1 x 51 x 8.17 =
Top leyer
7`-2``. 2 L/D
16mm dia = 1 x 7 x 67.50 =
16mm dia lap = 1 x 7 x 2.17 =
'' 6`-3`` = 2 x 6 x 6.25 =
''' 6`-8`` = 2 x 6 x 6.67 =
'' 4`-5`` = 2 x 6 x 4.42 =
11`-2``. 3
16mm dia = 1 x 8 x 67.50 =
16mm dia lap = 1 x 8 x 2.17 =
'' 6`-3`` = 2 x 7 x 6.25 =
''' 6`-8`` = 2 x 7 x 6.67 =
5`-6``. 2
16mm dia = 1 x 6 x 67.50 =
16mm dia lap = 1 x 6 x 2.17 =
'' 6`-3`` = 2 x 5 x 6.25 =
''' 6`-8`` = 2 x 5 x 6.67 =
5`-3``. 3
16mm dia = 1 x 6 x 67.50 =
16mm dia lap = 1 x 6 x 2.17 =
'' 6`-3`` = 2 x 5 x 6.25 =
''' 6`-8`` = 2 x 5 x 6.67 =
5`-9``. 2
16mm dia = 1 x 6 x 67.50 =
16mm dia lap = 1 x 6 x 2.17 =
'' 6`-3`` = 2 x 5 x 6.25 =
''' 6`-8`` = 2 x 5 x 6.67 =
Porch
16mm dia = 1 x 16 x 18.25 =
16mm dia = 1 x 34 x 8.17 =
S/D
6`-1``. 1
16mm dia = 2 x 8 x 37.00 =
'' 11`-2`` = 2 x 7 x 11.17 =
''' 5`-3`` = 2 x 7 x 5.25 =
6`-3``. 2
16mm dia = 2 x 6 x 37.00 =
'' 11`-2`` = 2 x 5 x 11.17 =
''' 5`-3`` = 2 x 5 x 5.25 =
6`-2``. 1
16mm dia = 2 x 6 x 37.00 =
'' 11`-2`` = 2 x 5 x 11.17 =
''' 5`-3`` = 2 x 5 x 5.25 =
6`-7``. 2
16mm dia = 2 x 7 x 37.00 =
'' 11`-2`` = 2 x 6 x 11.17 =
''' 5`-3`` = 2 x 6 x 5.25 =
5`-4``. 1
16mm dia = 2 x 7 x 37.00 =
'' 11`-2`` = 2 x 6 x 11.17 =
''' 5`-3`` = 2 x 6 x 5.25 =
4`-5``. 2
16mm dia = 2 x 5 x 37.00 =
'' 11`-2`` = 2 x 4 x 11.17 =
''' 5`-3`` = 2 x 4 x 5.25 =
20 mm dia st = 3 x 6 x 34.00 =
" Lap = 3 x 6 x 2.67 =
" Ext top end = 3 x 2 x 7.50 =
" middle = 3 x 3 x 13.00 =
" Ext bott. = 3 x 3 x 15.00 =
" 25mm saparator = 3 x 15 x 0.75 =
10 mm stirrup
= 3 x 110 x 5.50 =
10 mm=bin 3 x 2 x 35.00 =
10 mm =st 3 x 110 x 1.25 =
GB2=2
"16 mm st = 2 x 6 x 34.00 =
" Lap = 2 x 6 x 2.17 =
" 20 Ext top end = 2 x 2 x 7.50 =
" middle = 2 x 3 x 12.00 =
" Ext bott. = 2 x 2 x 15.00 =
" 25mm saparator = 2 x 10 x 0.75 =
10 mm stirrup = 2 x 110 x 5.50 =
GB2A=2
"16 mm st = 2 x 6 x 47.17 =
" Lap = 2 x 12 x 2.17 =
"20 middle = 2 x 2 x 7.75 =
"20 middle = 2 x 2 x 12.00 =
"16 mm bot = 2 x 2 x 15.00 =
10 mm stirrup = 2 x 120 x 5.00 =
GB3=3
20 mm dia st = 3 x 6 x 64.50 =
" Lap = 3 x 24 x 2.67 =
"16 mm Ext top end = 3 x 4 x 6.50 =
"20mm middle = 3 x 4 x 13.00 =
"20mm middle = 3 x 4 x 12.00 =
"16 mm bot = 3 x 4 x 12.00 =
"16 mm bot = 3 x 4 x 12.50 =
" 25mm saparator = 3 x 25 x 0.75 =
10 mm stirrup
= 3 x 170 x 5.00 =
10 mm=bin 3 x 4 x 27.42 =
10 mm =st 3 x 170 x 1.25 =
GB4=1
"16 mm st = 2 x 6 x 64.50 =
" Lap = 2 x 24 x 2.17 =
"16 mm Ext top end = 2 x 4 x 6.50 =
"20mm middle = 2 x 4 x 12.00 =
"20mm middle = 2 x 4 x 11.00 =
"16 mm bot = 2 x 4 x 11.00 =
"16 mm bot = 2 x 4 x 12.00 =
" 25mm saparator = 2 x 18 x 0.75 =
10 mm stirrup
= 2 x 175 x 5.00 =
GB5=2
20 mm dia st = 2 x 3 x 27.96 =
"16 mm st = 2 x 3 x 27.96 =
10 mm stirrup
= 2 x 105 x 4.50 =
GB6=3
"16 mm st = 3 x 5 x 13.75 =
10 mm stirrup
= 3 x 50 x 4.50 =
GB6=2
"16 mm st = 2 x 5 x 13.00 =
10 mm stirrup
= 2 x 50 x 4.50 =
GB6=1
"16 mm st = 3 x 5 x 7.42 =
10 mm stirrup
= 3 x 35 x 4.50 =
GB7=5
"16 mm st = 5 x 4 x 9.17 =
10 mm stirrup
= 5 x 40 x 4.00 =
GB7=1
"16 mm st = 1 x 4 x 7.08 =
10 mm stirrup
= 1 x 20 x 4.00 =
GB7=2
"16 mm st = 2 x 4 x 6.38 =
10 mm stirrup
= 2 x 25 x 4.00 =
GB8=1
"16 mm st = 1 x 5 x 11.00 =
10 mm stirrup
= 1 x 35 x 4.50 =
GB8=1
"16 mm st = 1 x 5 x 18.08 =
10 mm stirrup
= 1 x 44 x 4.50 =
Item no19
Testing of Concrete Cylinder
= 4 x 1.67 x 0.83 x
Item no 2
125mm wide brick work in 1:4
(a) In Ground Floor
Ground floor
Ward = 1 x 12.08 x
Fwa = 1 x 12.08 x
= 1 x 20.67 x
Dis = 1 x 30.83 x
Fpi = 1 x 10.00 x
iud = 1 x 10.29 x
Toilet = 1 x 6.25 x
= 1 x 4.17 x
Toilet = 2 x 5.00 x
Fwv = 2 x 10.42 x
= 1 x 9.58 x
Sacmo = 1 x 29.17 x
Madical officer = 1 x 11.54 x
Stair = 2 x 9.58 x
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
Stair = 2 x 3.33 x
Dark
= 4 x 14.17 x
= 2 x 6.67 x
= 4 x 9.58 x
= 2 x 7.08 x
= 2 x 6.67 x
= 2 x 12.50 x
= 2 x 6.25 x
Deduction:(-)
D1 = 9 x 3.33 x
D2 = 4 x 2.50 x
Lintel = 1 x 94.17 x
(ii) 1st Floor
W-1 = 10 x 5.00 x
W-2 = 2 x 3.33 x
Hw-2 = 4 x 7.04 x
HW3 = 2 x 2.50 x
Stair = 2 x 3.33 x
Dark
= 4 x 14.17 x
= 2 x 6.67 x
= 4 x 9.58 x
= 2 x 7.08 x
= 2 x 6.67 x
= 2 x 12.50 x
= 2 x 6.25 x
M bed = 2 x 12.08 x
' = 2 x 11.67 x
Living = 1 x 16.67 x
Toilet = 2 x 4.17 x
C Bed = 2 x 22.38 x
Toilet = 2 x 26.67 x
'' = 2 x 4.17 x
Stair = 2 x 9.58 x
Toilet = 2 x 5.00 x
Ver = 2 x 8.13 x
= 1 x 6.25 x
= 2 x 4.58 x
= 2 x 7.92 x
Deduction:(-)
D1 = 6 x 3.33 x
D2 = 2 x 2.92 x
D3 = 6 x 3.50 x
Lintel = 1 x 81.00 x
= 2 x 9.58 x
= 2 x 7.75 x
= 2 x 8.13 x
Deduction:(-)
D1 = 1 x 3.33 x
Parapat wall
= 1 x 167.75 x
= 1 x 39.17 x
Item no 3
R C C work in 1:2:4 with Brick chips
A) In ,Column
(i) Ground floor
C1 = 2 x 1.00 x 1.25 x
C2 = 4 x 1.00 x 1.25 x
C3 = 8 x 1.00 x 1.25 x
C4 = 4 x 1.00 x 1.50 x
C1 = 2 x 1.00 x 1.25 x
C2 = 4 x 1.00 x 1.25 x
C3 = 8 x 1.00 x 1.25 x
C4 = 4 x 1.00 x 1.50 x
C3 = 2 x 1.00 x 1.25 x
C4 = 2 x 1.00 x 1.50 x
lse column
C1 = 12 x 1.00 x 1.25 x
C4 = 2 x 1.00 x 1.50 x
L1 = 1 x 94.17 x 0.42 x
L2 = 2 x 167.75 x 0.42 x
L3 = 2 x 167.75 x 0.21 x
L1 = 1 x 81.00 x 0.42 x
L2 = 2 x 167.75 x 0.42 x
L3 = 2 x 167.75 x 0.21 x
(a) concrete
(i) In Ground Floor
Hospital
L/D FB1 = 2 x 54.33 x 0.83 x
FB2 = 2 x 23.29 x 0.83 x
FB3 = 6 x 26.25 x 0.83 x
FB4 = 2 x 6.46 x 0.63 x
FB5 = 2 x 16.42 x 0.63 x
Hospital
FB1 = 2 x 54.33 x 0.83 x
FB2 = 2 x 23.29 x 0.83 x
FB3 = 6 x 26.25 x 0.83 x
FB4 = 2 x 6.46 x 0.63 x
FB5 = 2 x 16.42 x 0.63 x
= 2 x 27.38 x 31.67 x
= 1 x 19.58 x 7.58 x
= 1 x 16.67 x 4.58 x
= 2 x 28.88 x 35.00 x
= 1 x 19.58 x 7.75 x
= 1 x 20.00 x 6.25 x
= 2 x 5.00 x 3.13 x
= 3 x 7.08 x 3.13 x
= 3 x 2.92 x 3.13 x
= 2 x 5.00 x 3.13 x
= 3 x 7.08 x 3.13 x
= 3 x 2.92 x 3.13 x
Hospital
W-1 = 10 x 5.00 x 1.25 x
W-3 = 2 x 2.63 x 1.25 x
HW1 = 2 x 5.00 x 1.25 x
HW3 = 2 x 2.50 x 1.25 x
alse celling
= 4 x 7.08 x 5.00 x
Shelves = 1 x 3.33 x 2.08 x
"= 1 x 30.00 x 1.67 x
A) In ,Column
(i) Ground floor
C1 = 2 x 4.50 x
C2 = 4 x 4.50 x
C3 = 8 x 4.50 x
C4 = 4 x 5.00 x
Chilacota
C3 = 2 x 4.50 x
C4 = 2 x 5.00 x
lse column
C1 = 12 x 4.50 x
C4 = 2 x 5.00 x
L1 = 1.00 x 81.00 x
L2 = 2.00 x 167.75 x
L3 = 2.00 x 167.75 x
FB1 = 2 x 54.33 x
FB2 = 2 x 23.29 x
FB3 = 6 x 26.25 x
FB4 = 2 x 6.46 x
FB5 = 1 x 16.42 x
= 2 x 27.38 x
= 1 x 19.58 x
= 1 x 16.67 x
Side = 1 x 190.75 x
= 2 x 10.00 x
= 3 x 14.17 x
= 3 x 5.83 x
= 2 x 10.00 x
= 3 x 14.17 x
= 3 x 5.83 x
A) In ,Column
(i) In Ground Floor
C1=2 Nos
20 mm dia = 2 x 8 x 12.50 =
20 mm Lap = 2 x 8 x 2.67 =
10mm stirrup = 2 x 34 x 4.00 =
C2= 4 Nos
20 mm dia = 4 x 8 x 12.50 =
20 mm Lap = 4 x 8 x 2.67 =
16mm=dia 4 x 2 x 12.50 =
16mm=Lap 4 x 2 x 2.17 =
10mm stirrup = 4 x 34 x 4.00 =
C3= 8 Nos
20mm dia = 8 x 10 x 12.50 =
20 mm Lap = 8 x 10 x 2.67 =
16mm=dia 8 x 2 x 12.50 =
16mm=Lap 8 x 2 x 2.17 =
10mm stirrup = 8 x 34 x 4.00 =
10mm stirrup = 8 x 34 x 3.00 =
C4= 4 Nos
20mm dia = 4 x 12 x 12.50 =
20 mm Lap = 4 x 12 x 2.67 =
10mm stirrup = 4 x 34 x 4.50 =
10mm stirrup = 4 x 34 x 3.25 =
Bc 1=6 nos
20mm dia = 6 x 2 x 10.00 =
8mm stirrup = 6 x 14 x 2.17 =
1st Floor
Column
C1=2 Nos
20 mm d= 2 x 4 x 10.00 =
20 mm dia Lap = 2 x 4 x 2.67 =
16mm dia = 2 x 4 x 10.00 =
16mm dia Lap = 2 x 4 x 2.17 =
10mm = 2 x 27 x 4.00 =
C2= 4 Nos
20 mm d= 4 x 4 x 10.00 =
20 mm dia Lap = 4 x 4 x 2.67 =
16mm dia = 4 x 6 x 10.00 =
16mm dia Lap = 4 x 6 x 1.17 =
10mm = 4 x 27 x 4.00 =
C3= 8 Nos
20 mm d= 8 x 6 x 10.00 =
20 mm dia Lap = 8 x 6 x 2.67 =
16mm dia = 8 x 6 x 10.00 =
16mm dia Lap = 8 x 6 x 2.17 =
10m = 8 x 27 x 4.00 =
10mm = 8 x 27 x 3.00 =
C4= 4 Nos
20 mm d= 4 x 6 x 10.00 =
20 mm dia Lap = 4 x 6 x 2.67 =
16mm dia = 4 x 6 x 10.00 =
16mm dia Lap = 4 x 6 x 2.17 =
10mm = 4 x 27 x 4.50 =
10m = 4 x 27 x 3.25 =
C1=2 Nos
20 mm dia = 2 x 8 x 2.25 =
10mm stirrup = 2 x 6 x 4.00 =
C2= 4 Nos
20 mm dia = 4 x 8 x 2.25 =
16mm=dia 4 x 2 x 2.25 =
10mm stirrup = 4 x 6 x 4.00 =
C3=6 Nos
20mm dia = 6 x 10 x 2.25 =
16mm=dia 6 x 2 x 2.25 =
10mm stirrup = 6 x 6 x 4.00 =
10mm stirrup = 6 x 6 x 3.00 =
C4=2Nos
20mm dia = 4 x 12 x 2.25 =
10mm stirrup = 4 x 6 x 4.50 =
10mm stirrup = 4 x 6 x 3.25 =
(b)Lintel
Ground Floor
L1
10mm dia bar = 1 x 4 x 94.17 =
8mm dia sti = 1 x 226 x 1.25 =
L1
10mm dia bar = 3 x 4 x 167.75 =
8mm dia sti = 3 x 401 x 1.25 =
L2
10mm dia bar = 1 x 2 x 167.75 =
8mm dia sti = 1 x 194 x 0.83 =
1st floor
L1
10mm dia bar = 1 x 4 x 81.00 =
8mm dia sti = 1 x 194 x 1.25 =
L1
10mm dia bar = 3 x 4 x 167.75 =
8mm dia sti = 3 x 401 x 1.25 =
L2
10mm dia bar = 1 x 2 x 167.75 =
8mm dia sti = 1 x 194 x 0.83 =
(C) In Tee beam, Ell beam, ,Reetangular beam)
16 mm dia St = 2 x 6 x 62.08 =
16 mm diaLap = 2 x 18 x 2.17 =
16mm end ext.top end= 2 x 4 x 4.75 =
20mm dia mid. ext. top midd.
= 2 x 4 x 8.83 =
" = 2 x 4 x 7.67 =
16mm ext. bott. = 2 x 4 x 8.17 =
" = 2 x 4 x 8.58 =
" = 2 x 2 x 5.67 =
10mm dia stirrup = 2 x 130 x 4.67 =
FB2
16 mm dia St = 2 x 6 x 28.04 =
16mm end ext.top end= 2 x 2 x 4.75 =
16mm end ext.top end= 2 x 2 x 4.92 =
20mm dia ext. top midd.
= 2 x 2 x 8.83 =
16mm ext. bott. = 2 x 2 x 8.17 =
" = 2 x 2 x 8.58 =
10mm dia stirrup = 2 x 65 x 4.67 =
FB3
20 mm dia St = 6 x 6 x 31.75 =
20mm ext. top end = 6 x 2 x 6.33 =
0mm ext. top midd. = 6 x 3 x 10.08 =
20mm dia . ext.bot = 6 x 2 x 12.00 =
10mm dia stirrup = 6 x 65 x 5.00 =
FB4
12 mm dia St = 2 x 2 x 8.04 =
16mm st = 2 x 2 x 8.04 =
10mm dia stirrup = 2 x 28 x 4.00 =
FB5 S/D
12 mm dia St = 1 x 2 x 18.25 =
16mm st = 1 x 5 x 18.25 =
10mm dia stirrup = 1 x 50 x 4.00 =
16 mm dia St = 2 x 6 x 62.08 =
16 mm diaLap = 2 x 12 x 2.17 =
16mm end ext.top end= 2 x 4 x 4.75 =
20mm dia mid. ext. top midd.
= 2 x 4 x 8.83 =
" = 2 x 4 x 7.67 =
16mm ext. bott. = 2 x 4 x 8.17 =
" = 2 x 4 x 8.58 =
" = 2 x 2 x 5.67 =
10mm dia stirrup = 2 x 130 x 4.67 =
FB2
16 mm dia St = 2 x 6 x 28.04 =
16mm end ext.top end= 2 x 2 x 4.75 =
16mm end ext.top end= 2 x 2 x 4.92 =
20mm dia ext. top midd.
= 2 x 2 x 8.83 =
16mm ext. bott. = 2 x 2 x 8.17 =
" = 2 x 2 x 8.58 =
10mm dia stirrup = 2 x 65 x 4.67 =
FB3
20 mm dia St = 6 x 6 x 31.75 =
20mm ext. top end = 6 x 2 x 6.33 =
0mm ext. top midd. = 6 x 3 x 10.08 =
20mm dia . ext.bot = 6 x 2 x 12.00 =
10mm dia stirrup = 6 x 65 x 5.00 =
FB4
12 mm dia St = 2 x 2 x 8.04 =
16mm st = 2 x 2 x 8.04 =
10mm dia stirrup = 2 x 28 x 4.00 =
FB5 S/D
12 mm dia St = 1 x 2 x 18.25 =
16mm st = 1 x 5 x 18.25 =
10mm dia stirrup = 1 x 50 x 4.00 =
S/D
10mm st bar = 2 x 24 x 31.50 =
10mm st bar = 1 x 19 x 22.83 =
10mm cut = 1 x 61 x 12.50 =
10mm cut = 2 x 23 x 7.17 =
10mm cut = 1 x 18 x 5.33 =
10mm Top bar = 2 x 50 x 6.17 =
10mm Binder = 2 x 10 x 21.75 =
10mm Top bar = 2 x 45 x 9.58 =
10mm Binder = 1 x 18 x 16.50 =
10mm Top bar = 2 x 75 x 9.58 =
10mm Binder = 2 x 14 x 25.33 =
10mm Top bar = 1 x 22 x 9.58 =
10mm Binder = 1 x 14 x 7.75 =
10mm Top bar = 2 x 55 x 4.42 =
10mm Binder = 2 x 7 x 24.33 =
S/D
10mm st bar = 1 x 19 x 62.33 =
10mm st bar = 2 x 12 x 27.04 =
10mm porch = 1 x 12 x 16.50 =
10mm cut = 2 x 29 x 8.54 =
10mm cut = 2 x 29 x 8.92 =
10mm cut = 1 x 17 x 5.83 =
10mm top bar = 2 x 60 x 4.83 =
10mm Binder = 2 x 8 x 27.50 =
10mm top bar = 2 x 90 x 8.58 =
10mm Binder = 2 x 13 x 27.50 =
10mm top bar = 1 x 58 x 17.33 =
10mm Binder = 1 x 25 x 16.67 =
10mm top bar = 2 x 25 x 3.75 =
10mm Binder = 2 x 6 x 9.58 =
Corner bar
10mm = 8 x 20 x 4.50 =
(ii) 1st floor
S/D
10mm st bar = 2 x 24 x 34.83 =
10mm st bar = 1 x 19 x 24.50 =
10mm cut = 1 x 61 x 12.50 =
10mm cut = 2 x 23 x 7.17 =
10mm cut = 1 x 18 x 5.33 =
10mm Top bar = 2 x 50 x 7.83 =
10mm Binder = 2 x 12 x 21.75 =
10mm Top bar = 1 x 40 x 11.25 =
10mm Binder = 1 x 14 x 19.83 =
10mm Top bar = 2 x 75 x 9.58 =
10mm Binder = 2 x 14 x 25.33 =
10mm Top bar = 1 x 22 x 9.58 =
10mm Binder = 1 x 14 x 7.75 =
10mm Top bar = 2 x 55 x 6.17 =
10mm Binder = 2 x 10 x 24.33 =
10mm Binder = 2 x 5 x 34.83 =
S/D
10mm st bar = 1 x 19 x 65.67 =
10mm st bar = 2 x 12 x 28.71 =
10mm porch = 1 x 12 x 19.83 =
10mm cut = 2 x 29 x 8.54 =
10mm cut = 2 x 29 x 8.92 =
10mm cut = 1 x 18 x 5.83 =
10mm top bar = 2 x 60 x 6.50 =
10mm Binder = 2 x 8 x 29.17 =
10mm top bar = 2 x 90 x 8.58 =
10mm Binder = 2 x 13 x 27.50 =
10mm top bar = 1 x 58 x 17.33 =
10mm Binder = 1 x 25 x 16.67 =
10mm top bar = 2 x 21 x 3.75 =
10mm Binder = 2 x 6 x 9.58 =
10mm Binder = 2 x 5 x 65.67 =
Corner bar
10mm = 8 x 20 x 4.50 =
2nd floor
Long direction(L/D)
Short direction(S/D)
w1
10mm = 10 x 11 x 1.42 =
10mm Binder = 10 x 4 x 5.00 =
w3
10mm = 2 x 9 x 1.42 =
10mm Binder = 2 x 5 x 2.58 =
alse celling
10mm = 4 x 13 x 7.08 =
10mm Binder = 4 x 17 x 5.00 =
Self
10mm = 1 x 75 x 1.50 =
10mm Binder = 1 x 6 x 33.33 =
(ii) 1st floor
w1 nshade
10mm = 10 x 11 x 1.42 =
10mm Binder = 10 x 4 x 5.00 =
w3
10mm = 2 x 9 x 1.42 =
10mm Binder = 2 x 5 x 2.58 =
alse celling
10mm = 2 x 13 x 7.08 =
10mm Binder = 2 x 17 x 5.00 =
10mm = 2 x 13 x 8.33 =
10mm Binder = 2 x 20 x 5.00 =
(g) In stair case,slab & steps,
(i) In Ground Floor
1st flight
10mm st = 1 x 12 x 13.42 =
10mm binder = 1 x 25 x 3.50 =
10mm ext top = 1 x 6 x 3.92 =
10mm binder = 1 x 5 x 3.50 =
10mm ext top = 1 x 12 x 4.38 =
12mm dia binder = 1 x 16 x 3.50 =
10mm ext top = 1 x 5 x 4.38 =
10mm binder = 1 x 9 x 3.50 =
10mm ext top = 1 x 12 x 3.50 =
10mm binder = 1 x 5 x 3.50 =
2nd flight
10mm st = 1 x 11 x 14.08 =
m dia binder = 1 x 15 x 3.50 =
10mm binder = 1 x 17 x 3.50 =
10mm ext top = 1 x 11 x 7.17 =
10mm binder = 1 x 14 x 3.50 =
10mm ext top = 1 x 11 x 6.33 =
12mm bin = 1 x 21 x 3.50 =
10mm ext top = 1 x 11 x 6.92 =
10mm binder = 1 x 13 x 3.50 =
(ii) 1st floor
3rd flight
10mm st = 1 x 12 x 13.42 =
10mm binder = 1 x 25 x 3.50 =
10mm ext top = 1 x 6 x 3.92 =
10mm binder = 1 x 5 x 3.50 =
10mm ext top = 1 x 12 x 4.38 =
12mm dia binder = 1 x 16 x 3.50 =
10mm ext top = 1 x 5 x 4.38 =
10mm binder = 1 x 9 x 3.50 =
10mm ext top = 1 x 12 x 3.50 =
10mm binder = 1 x 5 x 3.50 =
4th flight
10mm st = 1 x 11 x 14.08 =
m dia binder = 1 x 15 x 3.50 =
10mm binder = 1 x 17 x 3.50 =
10mm ext top = 1 x 11 x 7.17 =
10mm binder = 1 x 14 x 3.50 =
10mm ext top = 1 x 11 x 6.33 =
12mm bin = 1 x 21 x 3.50 =
10mm ext top = 1 x 11 x 6.92 =
10mm binder = 1 x 13 x 3.50 =
G/Total
Item no 6
114mm thick brick bonded concrete in 1:2:4 without neat cement finishing
Ward = 1 x 11.67 x
Fwa = 1 x 9.17 x
muli = 1 x 15.00 x
Dis = 1 x 10.83 x
Fpi = 1 x 10.00 x
= 4 x 6.25 x
Lup = 1 x 10.29 x
Cor = 1 x 25.29 x
= 1 x 9.58 x
Fwv = 1 x 8.33 x
= 1 x 2.75 x
Sacmo = 1 x 8.33 x
Madical officer = 1 x 11.54 x
b. Supplying fitting & fixing of unglazed homogeneous floor tiles (size 300mmx300mm
Ground floor Hospital
Toilet = 4 x 6.25 x
Toilet font = 4 x 4.33 x
(ii) 1st floor
Toilet = 2 x 7.50 x
Toilet = 2 x 6.25 x
Toilet font = 3 x 4.33 x
Item no. 8
c. Supplying Fitting & fixing white glazed wall tiles (size 250mmx400mm)
i. Ground floor Hospital
Toilet = 4 x 20.83 x
Ward = 1 x 47.50 x
Delevery = 1 x 41.42 x
(ii) 1st floor
Toilet = 2 x 23.33 x
Toilet = 2 x 20.83 x
Item no.10
Supplying &cutting fiting and fixing of 5 mm thick clear glass in counter including M S frame
= 1 x 3.33 x
Item no.11
S F F of 38mm thick wooden grooved single panel flush door shutter
(a) Gamari
CD1 = 1.00 x 8.33 x
GD1 = 1.00 x 3.33 x
D3 = 4.00 x 2.50 x
Cat door = 4.00 x 2.50 x
1st floor
D2 = 2.00 x 2.92 x
D3 = 6.00 x 2.50 x
CD2 = 2.00 x 7.50 x
Cat door = 4.00 x 2.50 x
Item no.12
S F F of 36mm thick and having density 400 kg/cum solid
(a) Burma Teak Veneered
D-1 = 9.00 x 3.33 x
1st floor
D-1 = 6.00 x 3.33 x
Item no.13
M S Structural door in pent house
= 1 x 3.33 x
Item no.14
Fly proofing wire mesh net work
(a) Using gammari/kathali wood frame for door
= 2 x 3.33 x
(b) Using M S Structural frame and shutterof window/ ventilator and wooden bead
HW1 = 2 x 5.00 x
Item no.15 Manufacturing & s f f window shuter with Z section , T section & F I bar
Ground floor
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
Stair = 2 x 3.33 x
1st floor
W-1 = 10 x 5.00 x
W-2 = 2 x 3.33 x
Hw-2 = 4 x 2.63 x
HW3 = 2 x 2.50 x
Stair = 2 x 3.33 x
Same as sl no 15.00
1st floor Ver = 2 x 5.00 x
Ver = 2 x 7.08 x
Ver = 2 x 4.75 x
Item no.1.40
S.F.F of 62 mm size pad lock.
= 1 x 1.00 x
Deduction
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
D-1 = 9.00 x 3.33 x
CD1 = 1.00 x 8.33 x
GD1 = 1.00 x 3.33 x
(iii)2nd Floor
Stair = 2 x 10.00 x
W-54 = 2 x 7.75 x
Parapat wall
= 4 x 62.50 x
= 4 x 31.67 x
(iii)2nd Floor
= 1 x 16.25 x
False column
C1 = 12 x 4.50 x
C4 = 2 x 5.00 x
Item no.19
= 2.25 x
Item no.20
= 1 x 32.75 x
2.25 x
Item no.21
Item no.22
On exterior surface applying
i Ground floor
Dado
= 2 x 62.50 x
= 2 x 31.67 x
Outter wall
= 2 x 62.50 x
= 2 x 31.67 x
Deduction
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
(ii)1st floor
Outter wall
= 2 x 62.50 x
= 2 x 31.67 x
Deduction
W-1 = 10 x 5.00 x
W-2 = 2 x 3.33 x
Hw-2 = 4 x 2.63 x
HW3 = 2 x 2.50 x
(iii)2nd Floor
False column
C1 = 12 x 4.50 x
C4 = 2 x 5.00 x
Stair = 2 x 10.00 x
W-54 = 2 x 7.75 x
Parapat wall
= 2 x 2 x 62.50 x
= 2 x 2 x 31.67 x
Item no.23
Plastic emulsion paint to wall and celling 2coats over a coat of sealer
Inner wall
Ward = 2 x 47.50 x
Fwa = 2 x 42.50 x
muli = 1 x 12.08 x
Dis = 2 x 41.67 x
Dis = 2 x 20.83 x
Fpi = 1 x 40.00 x
Iud = 2 x 41.42 x
Fwv = 1 x 40.00 x
Stair = 2 x 10.00 x
Sacmo = 1 x 37.50 x
Madical officer = 2 x 43.92 x
Cor = 2 x 50.58 x
Stair = 2 x 10.00 x
Deduction
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
D-1 = 9.00 x 3.33 x
CD1 = 1.00 x 8.33 x
GD1 = 1.00 x 3.33 x
(ii) 1st floor
Inner wall
M bed = 2 x 47.50 x
Living = 2 x 50.21 x
C bed = 2 x 44.75 x
Kit = 2 x 32.50 x
Stair = 2 x 10.00 x
Cor = 2 x 50.58 x
Deduction
W-1 = 5 x 5.00 x
W-2 = 2 x 3.33 x
(iii)2nd Floor
Stair = 2 x 10.00 x
W-54 = 2 x 7.75 x
Deduction
W-2 = 2 x 3.33 x
D1 = 1 x 3.33 x
Celling
(i) Ground floor
Ward = 1 x 11.67 x
Fwa = 1 x 9.17 x
muli = 1 x 15.00 x
Dis = 1 x 10.83 x
Fpi = 1 x 10.00 x
= 4 x 6.25 x
Lup = 1 x 10.29 x
Cor = 1 x 25.29 x
= 1 x 9.58 x
Fwv = 1 x 8.33 x
= 1 x 2.75 x
= 1 x 6.20 x
Sacmo = 1 x 8.33 x
Madical officer = 1 x 11.54 x
Sunshad
W-1 = 10 x 5.00 x
W-3 = 2 x 2.63 x
HW1 = 2 x 5.00 x
HW3 = 2 x 2.50 x
False celling
= 4 x 7.08 x
Selves = 1 x 3.33 x
= 1 x 30.00 x
Column
c1, c2, c3, c4 = 12 x 1.25 x
Beam = 1 x 348.00 x
(i) 1st floor
M bed = 2 x 11.67 x
Living = 2 x 16.67 x
C bed = 2 x 11.96 x
Kitchen = 2 x 8.33 x
Ver = 2 x 7.92 x
'' = 2 x 8.13 x
Toilet Front = 2 x 4.17 x
'' = 2 x 4.33 x
= 2 x 9.58 x
W-1 = 10 x 5.00 x
W2 = 2 x 3.33 x
HW2 = 4 x 2.63 x
HW3 = 2 x 2.50 x
False celling
= 2 x 7.08 x
= 2 x 8.33 x
Column
c1, c2, c3, c4 = 12 x 1.25 x
Beam = 1 x 348.00 x
(iii)2nd Floor
= 1 x 16.25 x
False column
C1 = 12 x 4.50 x
C4 = 2 x 5.00 x
Item no.24
Providing drip course/nosing/throating with cement mortar(1:2)
Item no.25
Providing apron with 100mm thick brick bonded concrete in 1:2:4
= 1 x 188.33 x
Item no.26 Door sill work
(a) using floor tiles.
Hospital
D3 = 1 x 10.00 x
Item no.27
Construction of black board on wall
= 1 x 7.00 x
Item no.28
Item no.29
= 1 x 50.50 x 0.25 x
Item no.30
Ladder work of size 2.44m long 380mm dia G I pipe beam and 25mm dia G I pipe step
= 1 x 1.00 x
Item no.31
Cloth drying arrangement on roof using M S Structural including painting
= 1 x 1.00 x
Item no.32
Item no.33
Item no.34
Item no.35
Site cleaning work
Total
Say
SL. no. 6.00 uPVC pipe line works with uPVC fifftings for waste water and rain water
(a) 100mm dia
R.S.= 6 X 28.00'
= 9 X 5.00'
Pent House= 2 X 10.00'
Total
Say
(b) 75mm dia
= 1 X 50.00'
Total
Say
SL. no. 7.00 Underground pipe line works in uPVC pipe
(a) 150mm dia
Pit To Pit= 2 X 25.00'
= 2 X 28.00'
= 2 X 10.00'
= 1 X 22.00'
= 2 X 15.00'
Total
Say
SL. no. 8.00 Pipe line work in G.I. pipe
(a) 40mm dia
From tank to on roof= 2 X 35.00'
Total
Say
(b) 25mm dia
To Water Tank= 2 X 30.00'
= 1 X 55.00'
To B&C= 2 X 8.00'
Vertical Line (A)= 1 X 8.00'
Vertical line (B)= 1 X 8.00'
Vertical line (C)= 1 X 8.00'
Vertical line (D)= 1 X 8.00'
Total
Say
(c) 20mm dia
Point (A), 1st floor (Upto shower)= 1 X 4.75'
Vertical= 1 X 12.50'
= 1 X 25.00'
Total
Say
(d) 12mm dia
Point (A), 1st floor (Shower)= 1 X 6.00'
Point (A), 1st floor (Basin)= 1 X 3.25'
Point (A), 1st floor (TWC)= 1 X 9.50'
Point (A), Ground floor (Basin delivary)= 1 X 2.00'
Point (A), Ground floor (Shower)= 1 X 6.00'
Point (A), Ground floor (TWC)= 1 X 2.00'
Point (A), Ground floor (Basin)= 1 X 1.00'
Point (A), Ground floor (Cistern)= 2 X 1.00'
Point (B), 1st floor (TW)= 1 X 3.00'
Point (B), 1st floor (TWC)= 1 X 2.00'
Point (B), 1st floor (Cistern)= 1 X 6.50'
Point (B), 1st floor (SK)= 1 X 1.25'
Point (B), 1st floor (Shower)= 1 X 6.00'
Point (B), 1st floor (Basin)= 1 X 3.50'
Point (B), Ground floor (TWC)= 1 X 2.00'
Point (B), Ground floor (Cistern)= 1 X 6.50'
Point (B), Ground floor (Basin)= 1 X 7.75'
Point (B), Ground floor (Cistern)= 2 X 1.00'
Point (C), 1st floor (TW)= 1 X 1.50'
Point (C), 1st floor (TWC)= 1 X 5.00'
Point (C), 1st floor (Shower)= 1 X 6.00'
Point (C), 1st floor (Basin)= 1 X 3.50'
Point (C), Ground floor (TWC)= 1 X 5.00'
Point (C), Ground floor (Basin)= 1 X 7.75'
Point (C), Ground floor (Cistern)= 2 X 1.00'
Point (D), 1st floor (TWC)= 1 X 2.00'
Point (D), 1st floor (Shower)= 1 X 6.00'
Point (D), 1st floor (Basin)= 1 X 3.00'
Point (D), Ground floor (Basin to Cistern)= 3 X 13.50'
= 1 X8
SL. no. 11.0 Collection pit work in 450mm x 450mm clear size and depth 750mm
= 1 X1
SL. no. 15.0 40mm dia 450 mm long uPVC rain spout with one bend in end
= 1 X2
SL. no. 17.0 Supplying, fitting & fixing of food grade plastic overhead water tank
(a) 1000 liter capacity
= 1 X2
A.3 Internal Electrical Works
SL. no. 1.00 PVC concealed conduit wiring
i. Light/Exhaust or wall bracket fan point
Ground floor= 1 X 44.00 =44.00 Nos
=82.00 Nos
=20.00 Nos
=4.00 Nos
=22.00 Nos
1st Floor
SDB-2=
SDB-2 to SB-18= 1 X2 X 40.00' = 80.00Rft
Total = 2,790.00Rft
Say =850.61 Rm
ii. 1C-2x4mm2 BYM cable with 4mm2 (BYA) ECC through PVC pipe of minimum inner dia 20mm having
thickness 1.5mm
1st floor
SDB-2 to DB= 1 X 80.00' = 80.00Rft
Total = 158.67Rft
Say =48.38 Rm
iii. 1C-2x6mm2 BYM Cable with 6mm2 (BYA) ECC through PVC Pipe 25mm dia havi
DB to SDB-1= 1 X 115.00' thickness
= 115.00Rft of 1.5mm.
Total = 115.00Rft
Say =35.06 Rm
SL. no. 3.00 Distribution/sub-distribution box
i. Box size = 600 x 450 x 125mm (SDB/MDB)
Ground floor= 1 X 2.00 =2.00 Nos
d. Security Light
i. Crescent Cat No. CML-40
Ground floor= 1 X 4.00 =4.00 Nos
B. External Works
B.1 Land Development Works
SL. no. 1.00 Earth fill work in Low Laying area
A-Block Filling = 1 x 82.00 x 71.67 x
B-Block '' = 1 x 71.67 x 20.00 x
Sl no 02 (a)-06 (a)
F1 = 24 x 3.33 x 2.75 x
F2 = 5 x 4.50 x 3.25 x
F3 = 2 x 4.00 x 4.00 x
F-1 = 24 x 3.33 x
F-2 = 5 x 4.50 x
F-3 = 2 x 4.00 x
Item no 4.
= 1 x 1.00 x 0.67 x
i. Concrete.
F1 = 24 x 3.33 x 2.75 x
F2 = 5 x 4.50 x 3.25 x
F3 = 2 x 4.00 x 4.00 x
In grade beam
Column
Coping
Formwork /shuttering
F1 = 24 x 12.17 x 1.00 x
F2 = 5 x 15.50 x 1.00 x
F3 = 2 x 16.00 x 1.00 x
In grade beam
Column
Coping
Item no 6
Supplying fabrication & fixing to details as per design deformed bar
Footing
F-1
10mm dia st bar = 24 x 9 x 2.67 =
" = 5 x 6 x 4.50 =
F-3
" = 2 x 12 x 4.00 =
Grade beam
GB-1
C-1
C-2
lap = 2 x 4 x 1.50 =
Item no. 7
a. 125mm Non-exposed brick work.
= 1 x 173.92 x
Item no.8
Average 12mm thick cement sand plaster.
Item no. 9
Minimum 6mm thick cement sand plaster.
C-1 = 34 x 2.50 x
C-2 = 2 x 5.00 x
Coping = 1 x 232.00 x
Item no. 10
Chalk washing with slaked lime
C-1 = 34 x 2.50 x
C-2 = 2 x 5.00 x
Coping = 1 x 232.00 x
Item no. 11
M S gate by G I pipe
Main
gate = 1 x 12.00 x
Item no. 2
Hospital = 1 x 188.33 x
Item no. 3
Item no. 4.
Hospital = 1 x 188.33 x
Item no. 6.
Master drain
Hospital = 1 x 188.33 x
Item no. 6.
Master drain
Hospital = 1 x 188.33 x
= 1 x 1.00 x
SL. no. 9.00 L. T. Line Connection PDB/REB Charge and Load Security deposit
Gr. Floor = 1.00 x
1st. Floor = 2.00 x
SL. no. 10.0 Earthing the electrical installation with 40 mm dia (1.5") dia G.I. pipe
(i) Depth of Main electrode at 12192. mm (40 ft)
= 1 x 1.00 x
Item no. 2
Sand filling in foundation trenches F.M 8.80
= 1 x 132.00 x 10.00 x
Item no. 3
Single brick flat soling.
= 1 x 132.00 x
Item no. 4
250mm or above thick brick work in foundation/ guid wall(1:6).
= 2 x 132.00 x 0.83 x
Item no. 5
Reinforced cement concrete work with brick chips in (1:2:4).
i.
Concrete.
= 1 x 132.00 x 8.33 x
Item no 6
Supplying fabrication & fixing to details as per design deformed bar
SL. no.4.01 Reinforced cement concrete work with brick chips in (1:2:4).
i. Concrete.
= 1 x 50.00 x 7.50 x
C. FURNITURE WORKS
SL. no. 1.00 Manufacturing & supplying of wood in furniture
1.1 Half Secretariat Table = 1 X 3.00 =3.00 Nos
1.2 Instrument Table= 1 X 1.00 =1.00 Nos
1.3 Dispensary Table= 1 X 2.00 =2.00 Nos
1.4 Insertion Table= 1 X 1.00 =1.00 Nos
1.5 Arm Cushion Chair= 1 X 3.00 =3.00 Nos
1.6 Arm Wooden Chair= 1 X 5.00 =5.00 Nos
1.7 Armless Wooden Chair= 1 X 12.00 =12.00 Nos
1.8 Peon's stool= 1 X 2.00 =2.00 Nos
1.9 Long Bench= 1 X 4.00 =4.00 Nos
1.10 Hospital Bed= 1 X 3.00 =3.00 Nos
1.11 Examination Couch= 1 X 3.00 =3.00 Nos
1.12 What-Not-Rack= 1 X 1.00 =1.00 Nos
1.13 Wall hung notice board= 1 X 1.00 =1.00 Nos
SL. no. 2.00 Supply of Steel Furniture
2.1 Steel infant bed= 1 X 3.00 =3.00 Nos
2.2 Steel Bed side locker= 1 X 3.00 =3.00 Nos
2.3 Steel Almirah= 1 X 4.00 =4.00 Nos
2.4 Steel Rack= 1 X 1.00 =1.00 Nos
NON TENDER ITEM
Civil Works
SL. no. 2.00
= 297.58 = 385.08
= 8.50229 = 11.00229
UH&FWC Center at Shibchar Upazila in
.WP-698/SDP (GOB)-HED
= 25773.19 Cft
742.50 = 357.67 Kg
23.87 = 11.50 ''
123.40 = 59.44 ''
121.60 = 58.58 ''
106.60 = 51.35 ''
810.00 = 390.18 Kg
26.04 = 12.54 ''
135.74 = 65.39 ''
133.76 = 64.43 ''
117.26 = 56.49 ''
540.00 = 260.12 Kg
17.36 = 8.36 ''
86.38 = 41.61 ''
85.12 = 41.00 ''
74.62 = 35.95 ''
472.50 = 227.61 Kg
15.19 = 7.32 ''
74.04 = 35.67 ''
72.96 = 35.15 ''
63.96 = 30.81 ''
607.50 = 292.64 Kg
19.53 = 9.41 ''
98.72 = 47.55 ''
97.28 = 46.86 ''
85.28 = 41.08 ''
666.00 = 501.53 Kg
114.72 = 86.39 Kg
88.00 = 66.27 Kg
92.00 = 69.28 Kg
178.72 = 134.58 Kg
666.00 = 320.82 Kg
114.72 = 55.26 ''
88.00 = 42.39 ''
92.00 = 44.32 ''
178.72 = 86.09 Kg
666.00 = 501.53 Kg
114.72 = 86.39 Kg
88.00 = 66.27 Kg
92.00 = 69.28 Kg
178.72 = 134.58 Kg
740.00 = 356.46 Kg
129.06 = 62.17 ''
99.00 = 47.69 ''
103.50 = 49.86 ''
201.06 = 96.85 Kg
592.00 = 445.80 Kg
100.38 = 75.59 Kg
77.00 = 57.98 Kg
80.50 = 60.62 Kg
156.38 = 117.76 Kg
250.50 = 120.67 Kg
35.85 = 17.27 ''
27.50 = 13.25 ''
57.50 = 27.70 ''
111.70 = 53.81 Kg
438.00 = 210.99 Kg
416.67 = 200.71 ''
472.50 = 227.61 Kg
15.19 = 7.32 ''
75.00 = 36.13 ''
80.04 = 38.56 ''
53.04 = 25.55 ''
540.00 = 260.12 Kg
17.36 = 8.36 ''
87.50 = 42.15 ''
93.38 = 44.98 ''
405.00 = 195.09 Kg
13.02 = 6.27 ''
62.50 = 30.11 ''
66.70 = 32.13 ''
405.00 = 195.09 Kg
13.02 = 6.27 ''
62.50 = 30.11 ''
66.70 = 32.13 ''
405.00 = 195.09 Kg
13.02 = 6.27 ''
62.50 = 30.11 ''
66.70 = 32.13 ''
292.00 = 140.66 Kg
277.78 = 133.81 ''
592.00 = 285.17 Kg
156.38 = 75.33 ''
73.50 = 35.41 ''
444.00 = 213.88 Kg
111.70 = 53.81 ''
52.50 = 25.29 ''
444.00 = 213.88 Kg
111.70 = 53.81 ''
52.50 = 25.29 ''
518.00 = 249.52 Kg
134.04 = 64.57 ''
63.00 = 30.35 ''
518.00 = 249.52 Kg
134.04 = 64.57 ''
63.00 = 30.35 ''
370.00 = 178.23 Kg
89.36 = 43.05 ''
42.00 = 20.23 ''
s/total = 10237.14
212.00 = 159.65 Kg
280.00 = 52.93 "
424.00 = 319.29 Kg
106.00 = 51.06 "
560.00 = 105.85 "
1161.00 = 874.29 Kg
n cement
=143.98 Cft
=31.97 Cft
=86.64 Cft
=17.64 Cft
=16.60 Cft
=2.43 Cft
=17.26 Cft
=316.52 Cft
=8.96 Cum
=143.98 Cft
=31.97 Cft
=74.70 Cft
=11.89 Cft
=17.26 Cft
=12.13 Cft
=291.94 Cft
=8.27 Cum
=101.76 Cft
=146.23 Cft
=27.57 Cft
=275.55 Cft
=7.80 Cum
Or = 322.53 Sqm
4.00 = 200.00 Sft
4.00 = 26.64 "
6.50 = 183.04 "
6.50 = 32.50 "
4.00 = 26.64 "
4303.28
7.00 = -139.86 "
7.00 = -40.88 "
7.00 = -147.00 "
0.50 = -40.50 "
Total = 3935.54 sft
Or = 365.76 Sqm
430.91
7.00 = -23.31 "
Or = 85.96 Sqm
=34.69 Cft
=19.08 Cft
=12.90 Cft
=14.01 Cft
=80.67 Cft
=2.28 Cum
=42.49 Sft
=24.47 Sft
=36.49 Sft
=12.49 Sft
=15.12 Sft
=16.43 Sft
=9.46 Sft
=6.26 Sft
=25.81 Sft
=1.52 Sft
=43.50 Sft
=234.03 Sft
=21.75 Sqm
=42.49 Sft
=24.47 Sft
=36.49 Sft
=12.49 Sft
=15.12 Sft
=16.43 Sft
=9.46 Sft
=6.26 Sft
=25.81 Sft
=1.52 Sft
=43.50 Sft
=234.03 Sft
=21.75 Sqm
200.00 = 150.61 Kg
42.72 = 32.17 Kg
272.00 = 51.41 "
400.00 = 301.22 Kg
85.44 = 64.34 Kg
100.00 = 48.17 "
17.36 = 8.36 "
544.00 = 102.83 "
72.00 = 54.22 Kg
18.00 = 8.67 "
96.00 = 18.15 "
161.04 = 30.44 Kg
87.50 = 23.74 "
23.52 = 6.38 "
17.50 = 3.31 Kg
52.50 = 14.25 "
56.00 = 15.20 "
21.88 = 5.94 "
31.50 = 5.95 Kg
42.00 = 11.40 "
17.50 = 3.31 Kg
154.88 = 29.28 Kg
52.50 = 14.25 "
59.50 = 11.25 Kg
78.87 = 21.40 "
49.00 = 9.26 Kg
69.63 = 18.89 "
73.50 = 19.94 "
76.12 = 20.65 "
45.50 = 8.60 "
161.04 = 30.44 Kg
87.50 = 23.74 "
23.52 = 6.38 "
17.50 = 3.31 Kg
52.50 = 14.25 "
56.00 = 15.20 "
21.88 = 5.94 "
31.50 = 5.95 Kg
42.00 = 11.40 "
17.50 = 3.31 Kg
154.88 = 29.28 Kg
52.50 = 14.25 "
59.50 = 11.25 Kg
78.87 = 21.40 "
49.00 = 9.26 Kg
69.63 = 18.89 "
73.50 = 19.94 "
76.12 = 20.65 "
45.50 = 8.60 "
G/Total = 22143.97 kg
ent finishing
12.08 = 140.97 sft
Or = 151.54 Sqm
k chips
Or = 151.54 Sqm
Or = 146.58 Sqm
or = 23.07 Sqm
or = 32.09 Sqm
s (size 250mmx400mm)
or = 169.51 Sqm
mx6mm M S angle
or = 5.28 Rm
cluding M S frame
4.00 = 13.32 "
or 1.24 Sqm
or shutter
or 41.82 Sqm
olid
or 32.50 Sqm
or 2.17 Sqm
or 4.33 Sqm
oden bead
2.00 = 20.00 "
Total = 20.00 sft
or 1.86 Sqm
ection , T section & F I bar
Or = 58.04 Sqm
= 624.54 Sft
Or = 72.12 Sqm
Or = 43.76 Sqm
Or = 789.74 Sqm
Or = 569.85 Sqm
Or = 95.58 Sqm
all
Or = 245.82 Sqm
Or = 33.37 Sqm
enamel paint
Or = 6.30 Sqm
Or = 451.82 Sqm
aler
4.50 = -14.99
Or = 77.94 Rm
Or = 2.60 Sqm
Or = 13.70 Sqm
G I pipe step
1.00 = 1.00 "
Total = 1.00 Nos
al including painting
4.00 = 4.00 "
Total = 4.00 Nos
orcement
0.33 = 572.20 cft
0.33 = 97.95 "
0.33 = 50.39 "
Total = 720.54 cft
Or = 20.41 cum
=4.00 Nos
=4.00 Nos
=8.00 Nos
mm x 350mm size of Super Diamond/Tuch & Flush/Royal
=4.00 Nos
=4.00 Nos
=8.00 Nos
mm x 235mm size including all fitting & fixing .
=5.00 Nos
=2.00 Nos
=7.00 Nos
an/Itali or approved best quality
=2.00 Nos
=2.00 Nos
=1.00 Nos
=4.00 Nos
=5.00 Nos
=5.00 Nos
=4.00 Nos
=9.00 Nos
=7.00 Nos
=8.00 Nos
=15.00 Nos
=5.00 Nos
=2.00 Nos
=7.00 Nos
=5.00 Nos
=2.00 Nos
=7.00 Nos
=4.00 Nos
=4.00 Nos
=6.00 Nos
=6.00 Nos
=10.00 Nos
=10.00 Nos
=5.00 Nos
=5.00 Nos
=8.00 Nos
=10.00 Nos
=18.00 Nos
=2.00 Nos
=2.00 Nos
=4.00 Nos
=4.00 Nos
=1.00 Nos
=1.00 Nos
=3.00 Nos
=7.00 Nos
=7.00 Nos
=4.00 Nos
=5.00 Nos
=8.00 Nos
=7.00 Nos
=15.00 Nos
= 175.00Rft
= 80.00Rft
= 40.00Rft
= 295.00Rft
=89.94 Rm
= 168.00Rft
= 140.00Rft
= 45.00Rft
= 20.00Rft
= 373.00Rft
=113.72 Rm
= 50.00Rft
= 50.00Rft
=15.24 Rm
= 50.00Rft
= 56.00Rft
= 20.00Rft
= 22.00Rft
= 30.00Rft
= 12.00Rft
= 40.00Rft
= 230.00Rft
=70.12 Rm
= 70.00Rft
= 20.00Rft
= 90.00Rft
=27.44 Rm
= 60.00Rft
= 55.00Rft
= 16.00Rft
= 8.00Rft
= 8.00Rft
= 8.00Rft
= 8.00Rft
= 163.00Rft
=49.70 Rm
= 4.75Rft
= 12.50Rft
= 22.00Rft
= 5.50Rft
= 11.25Rft
= 10.50Rft
= 22.50Rft
= 5.00Rft
= 12.25Rft
= 25.00Rft
= 131.25Rft
=40.02 Rm
= 6.00Rft
= 3.25Rft
= 9.50Rft
= 2.00Rft
= 6.00Rft
= 2.00Rft
= 1.00Rft
= 2.00Rft
= 3.00Rft
= 2.00Rft
= 6.50Rft
= 1.25Rft
= 6.00Rft
= 3.50Rft
= 2.00Rft
= 6.50Rft
= 7.75Rft
= 2.00Rft
= 1.50Rft
= 5.00Rft
= 6.00Rft
= 3.50Rft
= 5.00Rft
= 7.75Rft
= 2.00Rft
= 2.00Rft
= 6.00Rft
= 3.00Rft
= 40.50Rft
= 2.00Rft
= 1.00Rft
= 2.00Rft
= 159.50Rft
=48.63 Rm
=40.02 Rm
=48.63 Rm
=88.65 Rm
00mm and maximum 750mm depth
=8.00 Nos
=1.00 Nos
=1.00 Nos
=1.00 Nos
=1.00 Nos
=2.00 Nos
=2.00 Nos
=2.00 Nos
Or = 27.60 Cum
Or = 30.20 Sqm
Or = 18.50 Cum
0.83 = 182.42 cft
Or = 8.14 Cum
Or = 12.82 Cum
Or = 10.76 Cum
Or = 1.80 Cum
sft
624.00 = 117.95 Kg
976.00 = 264.83 Kg
976.00 = 470.15 Kg
69.44 = 33.45 Kg
"
696.00 = 84.88 Kg
22.68 = 2.77 "
Total = 2889.59 Kg
Or = 96.98 Sqm
Or = 193.96 Sqm
Or = 90.71 Sqm
Or = 284.67 Sqm
6.00 = 72.00 Sft
Total = 72.00 Sft
Or = 6.69 Sqm
=1342.00 Sft
=1342.00 Sft
=124.72 Sqm
Total = 1.00 LS
be well pipe
Or = 20.27 Cum
Or = 43.10 Sqm
Or = 3.28 Cum
Or = 5.48 Cum
1.00 = 188.33 "
Total = 188.33 Sft
Or = 17.50 Sqm
Or = 101.88 Sqm
Or = 32.11 Sqm
acket complete with 1 No. of G.I. bend 2 Nos. fixing clamps of 38.
4.00 = 4.00 kw
2.00 = 4.00 kw
Total = 8.00 Nos
Or = 18.69 Cum
Or = 15.51 Cum
Or = 13.08 Cum
1716.00 = 324.37 Kg
Total = 640.86 Kg
Or = #VALUE! Sqm
=1010.19 Sft
=93.88 Sqm
2.50 = 14.50
2.50 = 14.83
2.50 = 14.42
2.50 = 14.33
2.50 = 14.25
2.50 = 14.33
2.50 = 14.42
2.50 = 14.50
2.50 = 14.92
2.50 = 14.67
2.50 = 14.92
2.50 = 15.25
2.50 = 15.42
2.50 = 15.50
2.50 = 15.92
2.50 = 16.00
2.50 = 15.92
2.50 = 15.83
269.93
15.00
S/Total = #REF! Sft