Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021

Project Name: Date: 01 Apr 2011


Contract Number: Page 1 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.

Revision Date Originator's Reviewed/Checked By Pages


No. Name & Initials Name & Initials

A 8/3/2010 Bob Henry Joe Seymour 3


0 9/28/2010 Bob Henry Joe Seymour 6
1 4/1/2011 Wayne Kanemitsu Bob Henry 8

APPROVALS SIGNATURES DATE

Lead Engineer
Project Manager:
Client Approval:

ISSUED FOR : Construction X Other Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 2 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

Record of Revisions
Revision Date Description
No.

A 8/3/2010 Issued for Approval, Table of Contents Only

0 9/28/2010 Issued for Review/Approval

1 4/1/2011 Issued Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 3 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

TABLE OF CONTENTS

1.0 GENERAL .....................................................................................................................................................4


1.1 Summary .............................................................................................................................................4
1.2 References ...........................................................................................................................................4

2.0 PRODUCTS...................................................................................................................................................5
2.1 General ................................................................................................................................................5
2.2 Aluminum Tray ..................................................................................................................................5
2.3 Fiberglass Tray ...................................................................................................................................6
2.4 Fittings and Accessories .....................................................................................................................6
2.5 Fabrication And Manufacture...........................................................................................................7
2.6 Testing .................................................................................................................................................7

3.0 EXECUTION.................................................................................................................................................7

4.0 ATTACHMENTS..........................................................................................................................................8
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 4 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

1.0 GENERAL

1.1 Summary

A. Scope of Specification

This specification describes the general requirements for cable tray systems.

B. Related Specification

1. Work in this specification shall be coordinated with Specification MQ-SP-E-6000:


General Requirements – Electrical Materials and Equipment.

2. See the Request for Quotation (RFQ) or Purchase Order (PO) for additional cable tray
requirements.

1.2 References

The latest issues, amendments, and supplements to these documents shall apply unless otherwise
indicated.

Marafiq Engineering Specifications


MQ-SP-E-6000 General Requirements Electrical Equipment and Materials
MQ-SP-E-6001 Electrical Design

American Society for Testing and Materials (ASTM)


A 123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
A 607 Specification for Steel, Sheet and Strip, High-Strength, Low-Alloy, Columbium or Vanadium,
or Both, Hot-Rolled and Cold-Rolled
A 653 Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated
(Galvannealed) by the Hot-Dip Process
B 633 Specification for Electrodeposited Coatings of Zinc on Iron and Steel

National Electrical Manufacturers Association (NEMA)


VE-1 Metal Cable Tray Systems
FG-1 Fiberglass Tray Systems
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 5 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

2.0 PRODUCTS

2.1 General

A. The materials shall consist of a complete rigid cable support system that includes required
straight sections, fittings, connectors, accessories, and other items as described in the RFQ or
PO.

B. Ladder type cable tray shall be aluminum or fiberglass as indicated on the RFQ/PO documents

C. All hardware such as screws, nuts, and bolts shall be 316 stainless steel and shall be adequate
for the tray duty rating.

D. All tray sections and fittings shall have ends pre-punched with holes to match splice connectors.
Each straight section and fitting shall be furnished with a pair of splice plates and necessary
hardware for connection to another section or fitting.

E. Rigid splice plates and expansion connectors shall be fabricated from the same material as the
tray and fittings to which they are to be supplied.

F. Tray straight section lengths, widths, and installation depths, plus fitting radii shall be as shown
in the RFQ and PO documents..

G. The maximum straight section length of cable tray, when fully loaded in accordance with the
manufacturer's recommendation, shall not deflect more than 50 mm (2”) and shall have a
minimum safety factor of 1.5.

2.2 Aluminum Tray


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 6 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

A. Straight section side rails, fitting side rails and rungs shall be fabricated from Aluminum
Association Alloy 6063. All fabricated parts shall be made from Aluminum Association Alloy
5052.

B. Trays and fittings shall consist of two longitudinal members (side rails) connected by transverse
members (rungs) welded to the side rails. Rungs shall be spaced 9 inches (20cm) on center,
shall have a minimum bearing surface of 7/8 inch (20mm) and have rounded edges. No portion
of the rung shall protrude below the bottom plane of the side rail. Each rung must be capable of
supporting the maximum cable load, with a safety factor of 1.5 and a 200 pound load when
tested in accordance with NEMA standards.

C. Tray shall have a Class 20C+ load rating.

D. Splice plates shall be made of 6063-T6 aluminum using four square neck bolts and serrated
flange locknuts.

E. Manufacturer’s standard HPDE isolator or nylon pad shall be provided for isolating aluminum
tray from potentially corrosive contact with dissimilar materials.

2.3 Fiberglass Tray

A. Straight section structural elements shall be pultruded from reinforced polyester resin. They
shall be constructed with a surface veil to insure a resin rich surface and ultra violet resistance.

B. Tray shall have a Class C load rating.

C. All bonded connections shall be sanded to maximize adhesion and structural integrity.

D. All cut ends and drilled holes shall be resin coated.

E. Trays and fittings shall consist of two longitudinal members (side rails) connected by transverse
members (rungs) mechanically fastened and adhesively bonded to the side rails. Rungs shall be
spaced 9 inches (20cm) on center, shall have a minimum bearing surface of 7/8 inch (20mm)
and have rounded edges. No portion of the rung shall protrude below the bottom plane of the
side rail. Each rung must be capable of supporting the maximum cable load, with a safety factor
of 1.5 and a 200 pound load when tested in accordance with NEMA standards.

2.4 Fittings and Accessories

A. Cable tray manufacturer’s proprietary accessories shall be provided to insure compatibility and
to limit the amount of site fabrication. This shall include horizontal and vertical bends; drop
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 7 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

outs: expansion joints; end plates; clamps and glides; barriers; plus bonding jumpers and ground
clamps for aluminum trays.

B. All fittings shall have a three inch tangent section after the radii.

C. Cable tray covers shall be of the same material as the cable tray. Required hardware to install
covers shall be provided.

2.5 Fabrication And Manufacture

A. Inside of cable tray system shall have no sharp edges, burrs, or projections that could damage
cables.

B. Splice plates shall be sized so that they shall not affect the load capacity of the tray.

2.6 Testing

A. Vendor shall perform a quality control inspection of the cable tray to ensure materials and
workmanship conforms to the specified standards.

B. Vendor shall provide Marafiq free entry into shops at all times, and shall arrange all reasonable
facilities, including witnessing of any type or routine tests, necessary to verify the materials and
fabrication are in accordance with the specifications.

C. Any work or materials rejected shall be repaired or replaced. Repair procedures shall be subject
to Company approval.

D. Vendor shall fully describe in proposal the details of the tests and quality control program.
Vendor shall provide type test reports, witnessed by an independent testing laboratory, of the
loading conditions prescribed in this specification and performed in accordance with NEMA
VE-1 or FG-1.

E. If certified test reports are not available for identical tray systems, the tray shall be tested in
accordance with the applicable standard as follows:

1. Destruction load test


2. Deflection test
3. Electrical continuity of connections

3.0 EXECUTION
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-E-6021
Project Name: Date: 01 Apr 2011
Contract Number: Page 8 of 8
Revision 1

SPECIFICATION – CABLE TRAY SYSTEM

Not applicable.

4.0 ATTACHMENTS

Not applicable.

End of Specification