Power & Water Utility Company for Jubail and Yanbu (MARAFIQ)
Page 1 of 6
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
SECTION 1- Marafiq Department /Contractor: Abdullah Falah AL Dossary Sons Contracting Co. Ltd . PO. #
Validity: Three year from the date of approval or till completion of the specified activity.
Approved Safety:
Name: Naveed Gull Approval Number: 2019/26
OPRIETARY NOTICE IMPORTANT
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Document ID No : MSSF-1-SF-0018
Power & Water Utility Company for Jubail and Yanbu (MARAFIQ)
Page 2 of 6
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
3. Fire. Fatality.
Emergency Explosion. Personal injury. (SHALL COMPLY WITH
Medical. Damage to the property. OHSMS 43 EMERGENCY
Natural Disaster. EVACUATION)
1. Safe Evacuation should be established
2. Action to be taken
a) All work to be stopped
b) All Equipment to be stopped.
c) All men are evacuated to the
assigned assembly Point.
d) A roll call is taken and headcount
will be done.
3. No one will be return back to work
until the clearance notification.
H elp in Emergency:
1) Marafiq # 0142966333
2) Royal Commission # 1911
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
The purpose of this form is to enable the significant findings of dynamic risk assessments to be recorded and communicated. Note that this risk
assessment form does not include a section for recording an evaluation of the level of risk for prioritization purposes. The reason for this is that
control measures are selected for this unique situation to reduce the level of risk for each hazard to an acceptable level of risk, failing that, to a
tolerable level of risk. Under no circumstances may the activity proceed where there is an unacceptable level of risk.
Section 1
Name of Marafiq Department / contractor – who intends to undertake work activity in Marafiq areas
Date – on which it is prepared
Facility / Department – Area in which the intended work activity will be performed
Job Location – Exact workplace where the intended work activity will be performed
Specify Work Activity to be assessed - Actual work
Assessment team member – Team comprising of competent personnel from management, supervisor and employee intending to undertake
work activity
Signature – signatures of team members
Job steps involved in the work activity –should be listed
Potential hazard –should be identified against each job step and recorded
Severity / consequences –which are likely to occur should be specified
Control measures –to eliminate or reduce the risks associated with identified hazards should be specified clearly
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Marafiq Department or the contractor who intends to undertake activity on completion of Section 1 and 2 of the risk assessments shall:
get it reviewed by Marafiq coordinating department and Marafiq OHS Section on first page in Section 1 and
further approved by Marafiq operations department
Marafiq coordinating department who is either directly undertaking the activity, or coordinating with the contractor assigned to undertake the activity,
shall review the risk assessment, give comments accordingly and ensure the following:
i. job steps involved in the work activity – are identified and correctly listed
ii. potential hazard –against each job step is identified and recorded
iii. severity / consequences – likely to occur on exposure are specified
iv. control measures –to eliminate or reduce the risks associated with identified hazards are specified clearly
v. List of material – All tools, work equipment, safety and emergency items are listed
Marafiq Operations department / BU Owner (Manager or superintendent or lead engineer) shall approve the risk assessment and acknowledge the
same.
II) Safety and emergency items used for protection of employees against hazards or mitigating effects from tolerable residual risks. Examples
include:
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
Personal protective equipment – helmets, safety shoes, goggles, face shields, full body harness, respirators, special clothing, etc.
Emergency items – Emergency rescue arrangement – tripod and winch assembly, firefighting equipment, etc.
On review and approval of risk assessment, Authorized Permit Receiver / Supervisor of Marafiq department or the contractor intending to perform
the activity in Marafiq areas, shall:
i. Give information on details of job, hazards, risks and safety precautions to all personnel involved in the job, and
ii. Acknowledge the same with Name of the employee, Profession, ID No, Signature prior to obtaining Permit to Work Certificate.
Prior to obtaining Permit to Work Certificate, Marafiq Department or the contractor shall:
i. Ensure that all the control measures identified in the risk assessment and safe method of work are in place before work commences.
ii. Arrange, inspect and ensure that all tools, work equipment, safety and emergency items are in a safe working condition before bringing them
to the workplace
iii. Ensure personnel who will be performing work are trained and competent to do the job safely using listed tools, work equipment, safety and
emergency items
iv. Submit all copies of risk assessment to operations department / Area owner
i. Risk assessment are obtained for all works that are inherent with significant risks and repeated whenever there are likely changes in
intended work activity / location / work environment, etc.
ii. The Marafiq Department or the contractor, (whoever submits the reviewed and approved risk assessment) has all specified risk control
measures in place prior to issue of Permit to Work Certificate
Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015
iii. Risk control measures specified in risk assessment are in place and utilized while performing the intended activity