Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CITY : PROBOLINGGO
XL HUAWEI
Approved by, Approved by,
PT. Huawei Tech. Investment
o Kec.Paiton
1. GENERAL INFORMATION
Project Name XL DWDM UNIFIED 2019
Site Name PAITON City PROBOLINGGO
Site ID 1643 Longitude 113.549575
Street Address JL.PB.SUDIRMAN(JALAN GENTENGAN GG.V)DESA PULO LOR,KEC.JOMBANG,JOMBANG,EASTJ
Site Type SHELTER Owner XL
Shelter Type
List of Surveyor:
No. Name Company E-mail
1 Gunoto PT. MKU
2 Eko Budi PT. MKU
3
List of Customer PIC:
No. Name Company E-mail
1 KHOLIK XL
2
3
List of Proposed Equipments:
Cabinet Dimension
No. Equipment Type Quantity (W x D x H) mm
H:2200 x W : 300 x L:
1 600
-
Total
1. GENERAL INFORMATION
XL DWDM UNIFIED 2019
AREA East Java
Latitude -7.71808056
GG.V)DESA PULO LOR,KEC.JOMBANG,JOMBANG,EASTJAVA
Date of Survey 21-12-2019
63 X 2 (DC)
-
0
2. ENVIRONMENT INSPECTION FORM
Site Name PAITON City PROBOLINGGO
Area East Java Site Type SHELTER
double
4 DCPDB 0 Huawei
source and
output design
Phase 1 / 3 Phase 3
ACPDB MCB Capacity Ampere 90
R Current Load (Measured) Ampere 28.9
S Current Load (Measured) Ampere 11.8
T Current Load (Measured) Ampere 45.5
GENSET
REMARKS
4A COOLING CALCULATION
Site Name PAITON AREA Ea
CITY PROBOLINGGO SITE TYPE SH
Site ID SITE OWNER
AC SPLIT
AC SPLIT UNIT AC SPLIT 1 AC SPLIT 2 AC SPLIT 3 AC SPLIT 4 AC SPLIT 5
Location / Room / Shelter
MEREK LG Daikin
CAPACITY PK 2 2
TEMPERATURE INSIDE °C 24 24
QUANTITY Pcs 1 1
TOTAL LOAD PLN VA 1865 1865 0
CAPACITY COOLING BTUH 18000 9000 0
COOLING CALCULATION
EQUIPMENT Watt
LAMP Watt 80
BTUH 272.96
COOLING EXISTING % 1%
UTILIZATION
Watt 1632.5
NEW LOAD
BTUH 5,570.09
COOLING EXISTING + NEW % 22%
LOAD UTILIZATION RESULT
THRESHOLD COOLING % 80%
STATUS COOLING OK/ADD OK
REMAIN CAPACITY COOLING BTUH 12,156.95
CAPACITY PK
QUANTITY Unit
REMARKS
OLING CALCULATION
East Java
SHELTER
AC SPLIT 6 Load
3730
27000
OLING CALCULATION
RESULT
REMARKS
4. DC POWER SUPPLY 1
Site Name PAITON City
Result
Note: Power Supply connect from Rectifier 1
DC POWER SUPPLY 1
Pontianak
CKD
Watt
Watt BWS1600G
Watt
Watt
%
Watt
Watt
Watt
Watt
Watt
Watt
%
Watt
7. LOCATION PHOTOS 1
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER
N/A N/A
N/A N/A
N/A N/A
N/A N/A
3. Existing Equipment Rack internal view 4. Existing Equipment Rack internal view
5. Existing Equipment Rack internal view 6. Existing Equipment Rack internal view
10. EXISTING EQUIPMENT PHOTOS-2
Site Name PAITON City PROBOLINGGO
Area EAST JAVA Site Type SHELTER
N/A
N/A
N/A
N/A
3. View S-N / S Load Current (Ampere) 4. View T-N / T Load Current (Ampere)
3. View R-N / R (Voltage) 4. View T-N / S (Voltage)
1. AC indoor 2. AC indoor
3. AC Model 4. AC Model
N/A N/A
3. Thermometer 4. AC Outdoor
12. PROPOSED FLOOR PLAN
Site Name PAITON
Show the shelter all item diagram and propose install place
OR PLAN
City PROBOLINGGO
Site Type SHELTER