HOSPITAL ENGINEERING PLANNED PREVENTIVE MAINTENANCE
(HEPPM) Page : 1 of 5
CAUTION:
Ensure the stipulated safety procedures are followed while carrying Estimated
out the PM activities PM hours:
3 Test high temperature trip, low lube oil pressure trip, over speed
trip, over voltage and over current trip.
4 STOP THE GENERATOR AND SIMULATE MAINS FAILURE AT
UNDER VOLTAGE RELAY / AMF PANEL OR PERFORM MAINS
SHUTDOWN
5 For sets running in parallel, synchronize the two generators on
‘Auto’ mode.
6 Run the engine “ON LOAD” for at least one (1) hour
7 Ensure emergency supply is provided to the appropriate areas.
8 Check operation of gauges and indicator lights.
13 Inspect for signs of leakages of: fuel, lube oil, engine oil, exhaust
and coolant/water.
14 Check the exhaust smoke appearance.
15 If any engine alarm is on while running, identify the faults and stop
the engine.
16 Check alternator battery charging operations.
17 Check operation of ventilation fans.
G QUANTITATIVE/ INSPECTION CHECKLIST (If applicable, record all measured data for the various
parameters in space provided below):
Parameter: Lubrication Water Engine Output Voltage Hour Run Voltage
Oil Pressure Temperature speed Frequency Battery Meter Generator
(psi) (rpm) (Hertz) (Volt) (Volt)
Set Limits: - <90 deg 1500-1520 50 Hz 24 V - 400 V
Celcius (+10%/-6%)
Data:
Parameter: Load
Current
(Amp)
Data:
J. Tools/Equipment used:
Multimeter
PPM has been performed in compliance to the checklist and the plant/equipment functions satisfactory to the
intended purpose.
Remarks: ___________________________________________________________________________________
___________________________________________________________________________________
Performed By :
Signature : _____________________________
Name :
Designation :
Company :
Date :
Done by 1: ____________________