Check for deflection 40.

0 mts

Deflection due to prestrees

Grade of concrete M 45
Span length, leff 38800 mm
Girder depth 2275 mm
Girder Length 39600 mm
Mod. Of elasticity of concrete 34 Kn/mm2

Cable -1 -611.5
1137.5 1002.5
4
Moment of inertia -I 6.07E+11 mm
Load P 2668 Kn 526
Eccentricity,e1 1002.5 mm 135
Eccentricity,e2 -611.5 mm

Deflection δ = Px(-5xe1+e2)xl2/48EI
Deflection δ = -23.112 mm

Cable -2 -611.5
1137.5 1002.5
4
Moment of inertia -I 6.07E+11 mm
Load P 2668 Kn 526
Eccentricity,e1 1002.5 mm 135
Eccentricity,e2 -611.5 mm

Deflection δ = Px(-5xe1+e2)xl2/48EI
Deflection δ = -23.112 mm

Cable -3 -295.5
1137.5 1002.5
4
Moment of inertia -I 6.07E+11 mm
Load P 1685 Kn 842
Eccentricity,e1 1002.5 mm 135
Eccentricity,e2 -295.5 mm

Deflection δ = Px(-5xe1+e2)xl2/48EI
Deflection δ = -13.78 mm 137.5

Cable -4
1137.5 782.5
Moment of inertia -I 6.07E+11 mm4
Load P 2668 Kn 1275
Eccentricity,e1 782.5 mm 355
Eccentricity,e2 137.5 mm

Deflection δ = Px(-5xe1+e2)xl2/48EI
Deflection δ = -15.514 mm

557.5

Cable -5
1137.5 562.5
Moment of inertia -I 6.07E+11 mm4
Load P 2668 Kn 1695
Eccentricity,e1 562.5 mm 575
Eccentricity,e2 557.5 mm

Deflection δ = Px(-5xe1+e2)xl2/48EI
Deflection δ = -9.267 mm

Total Deflection Due to Upward δ -84.782 mm Upward

Note : "-" means Upward Direction

Deflection due to DL of Girder = 5*w*l4


384EI
Load P = 0.0246 kn/mm
Length = 38800 mm
Mod. Of elasticity of concrete = 34 kn/mm2
Moment of inertia -I = 6.07E+11 mm^4

Total Deflection Due to Downward δ2 35.7 mm

Total deflection for 1 girder


Due to self weight of the 1
S.no Span (m) Deflection Prestressing of 1 Girder (mm) at ground before slab
girder without slab (mm)
placing (mm)
1 40 -84.782 35.7 -49.122