Western Mindanao Power Corporation

CAPITAL EXPENDITURES REQUEST


Date Prepared : 2003 November 20 Ref. No: WLP-REQ-03-11-11

Date Needed : 2003 November 21

A. Description of CAPEX:

Labor for separation/transfer of 10" UPVC pipe to proper storage area and 5's activity @ fabrication area.

B. Purpose/Justification:

* For proper storage of 10" UPVC pipe at fabrication area.


* Existing 10" UPVC pipes are not in proper area.
* To prevent Workers working at fabrication area from accident due to unsafe locations of the 10" UPVC pipe.
* To prolong its usefull life of the 10" UPVC pipe.

C. Cost:
Estimated : PhP 5,000.00 Budgetted Amount : PhP 5,200.00

Actual : PhP Not Budgetted


(If available) [3] Verified by: JSB
(Required) Accountant

D. Estimated Useful Life: 6 years Estimated Salvage Value:

Suggested Supplier(s): G. Supporting Documents:

1 CM3 Engineering Services Cost/Benefit Analysis

2 Feasibility Study

3 Gov't. Requirement (DENR, NPC, etc.)

4 Others

[1] Requested by: [2] Reviewed by:

AB Basilio JF Espinosa

[4] Recommending Approval [5] Approved by:

na JMT Torrejon

LF-CPX-10, Rev.1, Issue 1999 October


Sarangani Energy Corporation
CAPITAL EXPENDITURE REQUEST FORM

Date Prepared : Ref. No:

Date Needed :

A. Description of CAPEX:

B. Purpose/Justification: C. Types of Capex:

Mandatory - Required by Gov't Regulating Agencies


Replacement
Strategic

D. Cost:
Estimated : PhP Budgetted Amount : PhP

Actual : PhP Not Budgetted :

[2] Verified by: [3] Verified by:


(Required) Materials Management Supervisor (Required) Plant Accountant

D. Estimated Useful Life: Estimated Salvage Value:

Suggested Supplier(s): G. Supporting Documents:

1 Cost/Benefit Analysis

2 Feasibility Study

3 Gov't. Requirement (DENR, NPC, etc.)

4 Others

[1] Requested by: [4] Reviewed by:

Department Head Finance Manager

[5] Recommending Approval: [6] Approved by:

PowerPower
PlantPlant
Manager
Manager VP - Business Mngr., Coal Operations

Capex Proposal worth at least PHP 500K shall be approved by the Capex Committee.
Sarangani Energy Corporation
CAPITAL EXPENDITURE REQUEST FORM

Date Prepared : Ref. No:

Date Needed :

A. Description of CAPEX:

B. Purpose/Justification: C. Types of Capex:

Mandatory - Required by Gov't Regulating Agencies


Replacement / Improvement
Strategic

D. Cost:
Estimated : PhP Budgetted Amount : PhP

Actual : PhP Not Budgetted :

[2] Verified by: RV Pasion [3] Verified by: RR Ramos


(Required) Materials Management Supervisor (Required) Plant Accountant

D. Estimated Useful Life: Estimated Salvage Value:

Suggested Supplier(s): G. Supporting Documents:

1 Cost/Benefit Analysis

2 Feasibility Study

3 Gov't. Requirement (DENR, NPC, etc.)

4 Others

[1] Requested by: [4] Reviewed by:

EO Enriquez / CPR Marin


Department Head/Section Leader MMG Manager / Chief Financial Officer

[5] Recommending Approval: [6] Approved by:

J Liimatta TG Santillan, Jr.


Power
Power
PlantPlant
Manager
Manager Excecutive Vice President

Capex Proposal worth at least PHP 500K shall be approved by the Capex Committee.

Potrebbero piacerti anche