E=576051.194
Ch44.200m
PS-03-91
PS-03-147
PS-03-90
Ch40.200m
N=2174531.204
Ch36.200m
ELE. +6.40
PS-03-89
PS-03-146
12"-P10225-A01K-ETr
CL.EL. +96.482
10"-P10125-A01K
CL.EL. +96.377 Ch28.200m E=576051.194
PS-03-88
Ch24.200m
N=2174531.204
B
PS-03-87
B
Ch20.200m
ELE. +6.40 A
B
C
FINAL
REVISE AND
RE- ISSUE
REVIEW NOT
REQUIRED
REVIEW CODE AND STATUS
NO COMMENT. WORK MAY PROCEED. SUBMIT "FINAL (CERTIFIED)" OR
"AS-BUILT" DOCUMENTS
AMEND AS NOTED. WORK MAY PROCEED SUBJECT TO INCORPORATION OF
CHANGES. SUBMIT REVISED DOCUMENTS.
D REJECTED AMEND AS NOTED AND RESUBMIT DOCUMENTS. WORK SHALL NOT PROCEED.
PS-03-145
DATE SIGN
REVIEW DOES NOT CONSTITUTE ACCEPTANCE OF DESIGN DETAILS, CALCULATIONS, TEST METHODS
OR MATERIALS DEVELOPED OR SELECTED BY VENDOR/CONTRACTOR NOR DOES IT RELIEVE
VENDOR/CONTRACTOR FROM FULL COMPLIANCE WITH CONTRACTUAL OR OTHER OBLIGATIONS
OR RESPONSIBILITIES.
Ch16.200m
2
PS-03-85 1 06-07-2019 ISSUED FOR REVIEW GB TB VM
PS-03-144 O 05-07-2019 FOR IDC CHECK GB TB VM
REV. DATE DESCRIPTION PREP'D CHK'D APP'D
GATE
FINGER PIER DUQM BUNKER TERMINAL
ENGINEERING,PROCUREMENT,CONSTRUCTION
AND COMMISIONING CONTRACT
PS-03-83
PROCESS LINE PIPING ARRANGEMENT
PS-03-143
AT FINGER PIER
1:100.