Reference Calculation Output

1. Stormwater Quantity Design Criteria


Design Manual : MSMA 2nd Edition(SUStoM)
Method : Rational Method Hydrograph Method

Minor Design Storm ARI : 2 years


Table 1.1 Major Design Storm ARI : 50 years

Secondary Outlet Design Storm ARI : 100 years

2. Pre-development Pond Inflow Hydrograph


2.1 Pre-development Time of Concentration

Bransby - William's Equation


tc = Fc × L / (A1/10 × S1/5)
= 92.5 × 0.26 / (4.631/10 × 31/5)
= 16.48 min

Hence, pre-development standard storm duration = 16 min

2.2 Sub-catchment Areas


Development Condition : Pre-development

Area (m2)
Catchment/ Sub- Pervious Impervious
catchment
A 46300.00 0.00
Total 46300.00 0.00

2.3 Design Rainfall Intensity

Nearest raingauge station : Sarawak - Kuching, Airport

Fitting constants are:

Table λ K θ ƞ
81.9375 0.1011 0.2605 0.5992
2.B1

Eq 2.2 Design rainfall intensity equation


i = λTK/(d + θ)ƞ
2
Development Condition : Pre-development

Design Storm T (years) d (hour) i


(mm/hr)
Minor 2 0.27 127.82
Major 50 0.27 176.95
Secondary Outlet 100 0.27 189.53

2.4 Catchment Runoff Coefficient

Eq. 2.4 Area Weighted Catchment Runoff Coefficient equation

2.4.1 Catchment Runoff Coefficient for Pervious Area


Development Condition : Pre-development
Table 2.5 Catchment/Sub Pervious Area
-catchment Landuse Area (ha) Runoff Coefficient, C
ARI ≤ 10 yr ARI > 10 yr
A Bush Cover 4.63 0.35 0.45
Total 4.63

Area Weighted 0.35 0.45


C

2.4.2 Catchment Runoff Coefficient for Impervious Area


Development Condition : Pre-development
Table 2.5 Catchment/Sub Impervious Area
-catchment Landuse Area (ha) Runoff Coefficient, C
ARI ≤ 10 yr ARI > 10 yr
A Commercial and 0.00 0.90 0.95
Business Centres
Total 0.00

Area Weighted 0.00 0.00


C
3
2.5 Rational Method Hydrograph Method

Eq 2.3 Rational Method equation


Q = C.i.A/360

2.5.1 Pre-development Peak Flow

Development Condition : Pre-development


Standard Storm Duration : 16 min

Design ARI Storm Rainfall Impervious Area Pervious Area Peak


Storm (year) duration intensity, Cpre A (ha) Cpre A (ha) Flow,
,d = i(mm/hr) Qpre
tc(min) (m³/s)
Minor 2 16.48 127.816 0.00 0.000 0.35 4.630 0.575
Major 50 16.48 176.950 0.00 0.000 0.45 4.630 1.024
Seconda 100 16.48 189.528 0.00 0.000 0.45 4.630 1.098
ry

Pre-development minor design storm outflow limit = 0.575


m3/s

1.024
Pre-development major design storm outflow limit = m3/s
4
3. Post-development Pond Inflow Hydrograph
3.1 Post-development Time of Concentration

Table 2.1 Overland Flow Time, to


Table 2.2

Friend's Equation
to = (107 × n* × L1/3) / S1/5
= (107 × 0.015 × 10.001/3) / 0.5001/5
= 3.97 min

Drain Flow Time, td


td = (L1 / V) / 60
= (754.92 / 1.00) / 60
= 12.58 min

tc = to + td
= 3.97 + 12.58
= 16.55 min

Drain Flow Time, td


td = (L1 / V) / 60
= (754.92 / 1.00) / 60
= 12.58 min

tc = to + td
= 3.97 + 12.58
= 16.55 min

Hence, post-development storm duration = 17 min

3.2 Sub-catchment Areas

Development Condition : Post-development

Area (m2)
Catchment/ Sub- Pervious Impervious
catchment
A 24000.00 22300.00
Total 24000.00 22300.00

3.3 Design Rainfall Intensity

Nearest raingauge station : Sarawak - Kuching, Airport


Fitting constants are:
5
Table λ K θ ƞ
81.9375 0.1011 0.2605 0.5992
2.B1

Eq 2.2 Design rainfall intensity equation


i = λTK/(d + θ)ƞ

Development Condition : Post-development

Design Storm ARI (year) Storm Duration, d (min) Rainfall


in terms of tc d intensity, i
(mm/hr)
Minor 2 1.0 16.55 127.650
1.5 24.83 111.285
2.0 33.11 99.538
2.5 41.39 90.607
Major 50 1.0 16.55 176.720
1.5 24.83 154.065
2.0 33.11 137.802
2.5 41.39 125.438
Secondary 100 1.0 16.55 189.542
1.5 24.83 165.244
2.0 33.11 147.801
2.5 41.39 134.539

3.4 Catchment Runoff Coefficient

Eq. 2.4 Area Weighted Catchment Runoff Coefficient equation

3.4.1 Catchment Runoff Coefficient for Pervious Area


Development Condition : Post-development
Table 2.5 Catchment/Sub Pervious Area
-catchment Landuse Area (ha) Runoff Coefficient, C
ARI ≤ 10 yr ARI > 10 yr
A Grass Cover 2.40 0.40 0.50
Total 2.40

Area Weighted 0.40 0.50


C

3.4.2 Catchment Runoff Coefficient for Impervious Area


Development Condition : Post-development
Table 2.5 Catchment/Sub Impervious Area
-catchment Landuse Area (ha) Runoff Coefficient, C
ARI ≤ 10 yr ARI > 10 yr
A Commercial and 2.23 0.90 0.95
Business Centres
Total 2.23

Area Weighted 0.90 0.95


C
6
3.5 Rational Method Hydrograph Method

Eq 2.3 Rational Method equation

Q = C.i.A/360

3.5.1 Post-development Peak Flow

Development Condition : Post-development

Design ARI (year) Storm Duration, d (min) Rainfall Impervious Area Pervious Area Peak Flow,
Storm in terms of d intensity, i Cpost A (ha) Cpost A (ha) Qpost (m³/s)
tc (mm/hr)
Minor 2 1.0 16.55 127.65 0.90 2.230 0.40 2.400 1.052
1.5 24.83 111.29 0.917
2.0 33.11 99.54 0.820
2.5 41.39 90.61 0.747
Major 50 1.0 16.55 176.72 0.95 2.230 0.50 2.400 1.629
1.5 24.83 154.07 1.420
2.0 33.11 137.80 1.270
2.5 41.39 125.44 1.156
Secondary 100 1.0 16.55 189.54 0.95 2.230 0.50 2.400 1.747
1.5 24.83 165.24 1.523
2.0 33.11 147.80 1.362
2.5 41.39 134.54 1.240

3.5.2 Preliminary Estimated Pond Volume

Eq 7.1a Type 1 (d > tc):


Vs = dQi - 0.5tiQo

Eq 7.1b Type 2 (d = tc):


Vs = 0.5ti(Qi - Qo)

Design Storm ARI (year) Storm duration, d (min) Inflow Total Peak Inflow, Peak Estimated
in term of tc d Duration, Qi (m³/s) Outflow, Pond
ti=d+tc (sec) Qo(m³/s) Volume, Vs
(m³)
Major 50 1.0 16.55 1986 1.629 1.024 601
1.5 24.83 2483 1.420 844
7
2.0 33.11 2980 1.270 998
2.5 41.39 3477 1.156 1091

Post-development preliminary critical storm duration = 41.39 min

Preliminary pond volume estimate (rational method) = 1091 m3

Post-development minor design storm peak flow = 0.747


m3/s
Post-development major design storm peak flow = 1.156
m3/s
Post-development secondary outlet design storm peak flow = 1.240
m3/s
4. Pre & Post-development Total Inflow Hydrographs 8

Time (min) Pre-development Post-development


ARI (years)
2 50 100 2 50 100
Storm Duration (min)
16.48 41.39
0 0 0 0 0 0 0
5 0.175 0.311 0.333 0.226 0.349 0.375
10 0.349 0.621 0.666 0.451 0.698 0.749
15 0.524 0.932 1.000 0.677 1.048 1.124
20 0.452 0.805 0.864 0.747 1.156 1.240
25 0.278 0.495 0.531 0.747 1.156 1.240
30 0.103 0.184 0.197 0.747 1.156 1.240
35 0.747 1.156 1.240
40 0.747 1.156 1.240
45 0.584 0.904 0.970
50 0.358 0.555 0.595
55 0.133 0.206 0.221
9
5. Critical Standard Storm Duration
5.1 Inflow Hydrographs Routing through the Pond

Section Stor ARI 2 years ARI 50 years ARI 100 years Pond
2.6 m IL Dia. Nos Qmax( WLm IL Dia. Nos Qmax( WLm IL Base Qmax( WLm Type Dept Prov.
Dura (m) (mm) m3/s) ax (m) (m) (mm) m3/s) ax (m) (m) Widt m3/s) ax (m) h (m) Vol.
tion h (m) (m3)
(min)
16.55 3.300 300 4 0.437 3.617 3.800 100 3 0.568 3.822 4.200 1.00 0.599 3.863 Irregul 1.100 2150.3
ar 35
24.83 3.300 300 4 0.482 3.686 3.800 100 3 0.650 3.948 4.200 1.00 0.679 4.001 Irregul 1.100 2150.3
ar 35
33.11 3.300 300 4 0.504 3.722 3.800 100 3 0.684 4.010 4.200 1.00 0.714 4.068 Irregul 1.100 2150.3
ar 35
41.39 3.300 300 4 0.513 3.736 3.800 100 3 0.702 4.044 4.200 1.00 0.734 4.108 Irregul 1.100 2150.3
ar 35

Critical storm duration =


2 years ARI = 41 min
50 years ARI = 41 min
100 years ARI = 41 min
10
6. Stage-Storage Relationship

Eq 7.2 Double-end area formula


V1,2 = 0.5(A1 + A2) × h
Stage incremental = 0.05 m

Stage (m) Elevation Area (m2) Storage Cum.


(m) (m3) Storage, S
(m3)
0.00 3.30 1525.70 0.00 0.00
0.05 3.35 1564.71 77.26 77.26
0.10 3.40 1603.73 79.21 156.47
0.15 3.45 1642.74 81.16 237.63
0.20 3.50 1681.75 83.11 320.75
0.25 3.55 1720.77 85.06 405.81
0.30 3.60 1759.78 87.01 492.82
0.35 3.65 1798.80 88.96 581.79
0.40 3.70 1837.81 90.92 672.70
0.45 3.75 1876.82 92.87 765.57
0.50 3.80 1915.84 94.82 860.38
0.55 3.85 1954.85 96.77 957.15
0.60 3.90 1993.86 98.72 1055.87
0.65 3.95 2032.88 100.67 1156.54
0.70 4.00 2071.89 102.62 1259.16
0.75 4.05 2110.90 104.57 1363.73
0.80 4.10 2149.92 106.52 1470.25
0.85 4.15 2188.93 108.47 1578.72
0.90 4.20 2227.95 110.42 1689.14
0.95 4.25 2266.96 112.37 1801.51
1.00 4.30 2305.97 114.32 1915.84
1.05 4.35 2344.99 116.27 2032.11
1.10 4.40 2384.00 118.22 2150.34

Provided pond storage volume = 2,150


m3
11
7. Stage-Discharge Relationship
Outlet Invert Ø Nos. Area (m2) ARI
Level (mm) (years)
(m)
Minor 3.30 300 4 0.283 2
Major 3.80 100 3 0.024 50
Secondary 4.20 Weir Base Width = 1.00m 100

Orifice flow rate equation


Eq 2.6 Q = CoAo(2gHo)0.5

Broad crested weir discharge equation


Eq 2.10 Q = CspBHp1.5

Elevation Minor Outlet Q1 (m3/s) Major Outlet Q2 (m3/s) Secondary Outlet Q3 (m3/s)
(m) Ho (m) CoAo(2g)0.5 Ho (m) CoAo(2g)0.5 Hp (m) Csp (m0.5/s)
3.3 0 0.776 0.000 0.000 0.065 0.000 0.00 0.000 0.000
3.35 0.05 0.776 0.174 0.000 0.065 0.000 0.00 0.000 0.000
3.4 0.1 0.776 0.246 0.000 0.065 0.000 0.00 0.000 0.000
3.45 0.15 0.776 0.301 0.000 0.065 0.000 0.00 0.000 0.000
3.5 0.2 0.776 0.347 0.000 0.065 0.000 0.00 0.000 0.000
3.55 0.25 0.776 0.388 0.000 0.065 0.000 0.00 0.000 0.000
3.6 0.3 0.776 0.425 0.000 0.065 0.000 0.00 0.000 0.000
3.65 0.35 0.776 0.459 0.000 0.065 0.000 0.00 0.000 0.000
3.7 0.4 0.776 0.491 0.000 0.065 0.000 0.00 0.000 0.000
3.75 0.45 0.776 0.521 0.000 0.065 0.000 0.00 0.000 0.000
3.8 0.5 0.776 0.549 0.000 0.065 0.000 0.00 0.000 0.000
3.85 0.55 0.776 0.576 0.050 0.065 0.014 0.00 0.000 0.000
3.9 0.6 0.776 0.601 0.100 0.065 0.020 0.00 0.000 0.000
3.95 0.65 0.776 0.626 0.150 0.065 0.025 0.00 0.000 0.000
4 0.7 0.776 0.650 0.200 0.065 0.029 0.00 0.000 0.000
4.05 0.75 0.776 0.672 0.250 0.065 0.032 0.00 0.000 0.000
4.1 0.8 0.776 0.695 0.300 0.065 0.035 0.00 0.000 0.000
4.15 0.85 0.776 0.716 0.350 0.065 0.038 0.00 0.000 0.000
4.2 0.9 0.776 0.737 0.400 0.065 0.041 0.00 1.390 0.000
4.25 0.95 0.776 0.757 0.450 0.065 0.043 0.05 1.390 0.016
4.3 1 0.776 0.776 0.500 0.065 0.046 0.10 1.390 0.044
4.35 1.05 0.776 0.796 0.550 0.065 0.048 0.15 1.450 0.084
4.4 1.1 0.776 0.814 0.600 0.065 0.050 0.20 1.480 0.132
12
8. Hydrologic Pond Routing

Modified Puls Method


Eq 2.17 (I1 + I2)/2 + (S1/∆t - O1/2) = (S2/∆t + O2/2)

8.1 Route Minor Design Storm Inflow Hydrograph through the Pond

Storm Duration : 41 min


ARI : 2 years
Time step: 5.00 min

Time, tj Inflow, Ij (I1+I2)/2 S1/Δt-O1/2 S2/Δt+O2/2 (m3/s) Outflow Water Level Elev. Oj=Q1 Sj (m3) (Sj/Δt)+Oj/2
(min) (m3/s) (m3/s) (m3/s) (m3/s) (m) (m) (m3/s) (m3/s)
0 0.000 0.000 0.000 0.000 0.000 3.300 3.300 0.000 0.000 0.000
5 0.226 0.113 0.000 0.113 0.000 3.316 3.350 0.174 77.260 0.344
10 0.451 0.338 0.113 0.394 0.057 3.358 3.400 0.246 156.471 0.644
15 0.677 0.564 0.394 0.772 0.186 3.421 3.450 0.301 237.633 0.942
20 0.747 0.712 0.772 1.215 0.269 3.495 3.500 0.347 320.745 1.243
25 0.747 0.747 1.215 1.618 0.343 3.562 3.550 0.388 405.809 1.547
30 0.747 0.747 1.618 1.968 0.397 3.618 3.600 0.425 492.822 1.855
35 0.747 0.747 1.968 2.277 0.438 3.667 3.650 0.459 581.787 2.169
40 0.747 0.747 2.277 2.554 0.470 3.710 3.700 0.491 672.702 2.488
45 0.584 0.665 2.554 2.722 0.497 3.736 3.750 0.521 765.568 2.812
50 0.358 0.471 2.722 2.680 0.513 3.730 3.800 0.549 860.384 3.142
55 0.133 0.246 2.680 2.417 0.509 3.689 3.850 0.576 957.151 3.478
60 0.000 0.066 2.417 1.999 0.484 3.623 3.900 0.601 1055.869 3.820
65 0.000 0.000 1.999 1.558 0.441 3.552 3.950 0.626 1156.538 4.168
70 0.000 0.000 1.558 0.000 0.390 3.488 4.000 0.650 1259.157 4.522
75 0.000 0.000 1.168 0.000 0.336 3.431 4.050 0.672 1363.727 4.882
80 0.000 0.000 0.832 0.000 0.280 3.385 4.100 0.695 1470.247 5.248
85 0.000 0.000 0.552 0.000 0.223 3.348 4.150 0.716 1578.719 5.620
90 0.000 0.000 0.329 0.000 0.166 3.324 4.200 0.737 1689.140 5.999
95 0.000 0.000 0.163 0.000 0.082 3.312 4.250 0.757 1801.513 6.383
100 0.000 0.000 0.081 0.000 0.041 3.306 4.300 0.776 1915.836 6.774
105 0.000 0.000 0.040 0.000 0.020 3.303 4.350 0.796 2032.110 7.172
110 0.000 0.000 0.020 0.000 0.010 3.301 4.400 0.814 2150.335 7.575
115 0.000 0.000 0.010 0.000 0.005 3.301
120 0.000 0.000 0.005 0.000 0.003 3.300
125 0.000 0.000 0.002 0.000 0.001 3.300
130 0.000 0.000 0.001 0.000 0.001 3.300
135 0.000 0.000 0.000 0.000 0.000 0.000
13
Post-development without pond Q2 peak flow = 0.747
m3/s
Post-development without pond Q2 peak flow time = 20 min

Post-development with pond Q2 peak flow = 0.513


m3/s
Post-development with pond Q2 peak flow time = 50 min

Post-development Q2 maximum pond water level, RL = 3.736 m

8.2 Route Major Design Storm Inflow Hydrograph through the Pond

Storm Duration : 41 min


ARI : 50 years
Time step: 5.00 min
14
Time, tj Inflow, Ij (I1+I2)/2 S1/Δt+Q1/2 S2/Δt+Q2/2 (m3/s) Outflow Water Level Elev. Oj=Q1 + Sj (m3) (Sj/Δt)+Oj/2
(min) (m3/s) (m3/s) (m3/s) (m3/s) (m) (m) Q2 (m3/s) (m3/s)
0 0.000 0.000 0.000 0.000 0.000 3.300 3.300 0.000 0.000 0.000
5 0.349 0.175 0.000 0.175 0.000 3.325 3.350 0.174 77.260 0.344
10 0.698 0.524 0.175 0.610 0.088 3.394 3.400 0.246 156.471 0.644
15 1.048 0.873 0.610 1.247 0.237 3.501 3.450 0.301 237.633 0.942
20 1.156 1.102 1.247 2.001 0.348 3.623 3.500 0.347 320.745 1.243
25 1.156 1.156 2.001 2.716 0.441 3.735 3.550 0.388 405.809 1.547
30 1.156 1.156 2.716 3.360 0.512 3.832 3.600 0.425 492.822 1.855
35 1.156 1.156 3.360 3.942 0.575 3.916 3.650 0.459 581.787 2.169
40 1.156 1.156 3.942 4.467 0.631 3.990 3.700 0.491 672.702 2.488
45 0.904 1.030 4.467 4.824 0.673 4.040 3.750 0.521 765.568 2.812
50 0.555 0.730 4.824 4.855 0.699 4.044 3.800 0.549 860.384 3.142
55 0.206 0.380 4.855 4.533 0.702 3.999 3.850 0.590 957.151 3.486
60 0.000 0.103 4.533 3.958 0.678 3.918 3.900 0.622 1055.869 3.831
65 0.000 0.000 3.958 3.325 0.633 3.827 3.950 0.651 1156.538 4.181
70 0.000 0.000 3.325 0.000 0.571 3.741 4.000 0.679 1259.157 4.536
75 0.000 0.000 2.754 0.000 0.515 3.661 4.050 0.705 1363.727 4.898
80 0.000 0.000 2.239 0.000 0.466 3.587 4.100 0.730 1470.247 5.266
85 0.000 0.000 1.773 0.000 0.415 3.519 4.150 0.754 1578.719 5.639
90 0.000 0.000 1.358 0.000 0.363 3.459 4.200 0.778 1689.140 6.019
95 0.000 0.000 0.995 0.000 0.309 3.407 4.250 0.800 1801.513 6.405
100 0.000 0.000 0.686 0.000 0.253 3.365 4.300 0.822 1915.836 6.797
105 0.000 0.000 0.433 0.000 0.195 3.335 4.350 0.844 2032.110 7.196
110 0.000 0.000 0.238 0.000 0.120 3.317 4.400 0.865 2150.335 7.600
115 0.000 0.000 0.118 0.000 0.059 3.309
120 0.000 0.000 0.059 0.000 0.030 3.304
125 0.000 0.000 0.029 0.000 0.014 3.302
130 0.000 0.000 0.015 0.000 0.007 3.301
135 0.000 0.000 0.008 0.000 0.004 3.301
140 0.000 0.000 0.004 0.000 0.002 3.300
145 0.000 0.000 0.002 0.000 0.001 3.300
150 0.000 0.000 0.001 0.000 0.000 0.000

Post-development without pond Q50 peak flow = 1.156


m3/s
Post-development without pond Q50 peak flow time = 20 min

Post-development with pond Q50 peak flow = 0.702


m3/s
Post-development with pond Q50 peak flow time = 55 min

Post-development Q50 maximum pond water level, RL = 4.044 m

8.3 Route Secondary Outlet Design Storm Inflow Hydrograph through the Pond
15

Storm Duration : 41 min


ARI : 100 years
Time step: 5.00 min

Time, tj Inflow, Ij (I1+I2)/2 S1/Δt+O1/2 S2/Δt+O2/2 (m3/s) Outflow Water Level Elev. Oj=Q1 + Sj (m3) (Sj/Δt)+Oj/2
(min) (m3/s) (m3/s) (m3/s) (m3/s) (m) (m) Q2 + Q3 (m3/s)
(m3/s)
0 0.000 0.000 0.000 0.000 0.000 3.300 3.300 0.000 0.000 0.000
5 0.375 0.187 0.000 0.187 0.000 3.327 3.350 0.174 77.260 0.344
10 0.749 0.562 0.187 0.655 0.094 3.402 3.400 0.246 156.471 0.644
15 1.124 0.936 0.655 1.344 0.248 3.517 3.450 0.301 237.633 0.942
20 1.240 1.182 1.344 2.165 0.361 3.649 3.500 0.347 320.745 1.243
25 1.240 1.240 2.165 2.946 0.459 3.770 3.550 0.388 405.809 1.547
30 1.240 1.240 2.946 3.654 0.532 3.874 3.600 0.425 492.822 1.855
35 1.240 1.240 3.654 4.288 0.606 3.965 3.650 0.459 581.787 2.169
40 1.240 1.240 4.288 4.869 0.659 4.046 3.700 0.491 672.702 2.488
45 0.970 1.105 4.869 5.271 0.703 4.101 3.750 0.521 765.568 2.812
50 0.595 0.782 5.271 5.324 0.730 4.108 3.800 0.549 860.384 3.142
55 0.221 0.408 5.324 4.998 0.734 4.064 3.850 0.590 957.151 3.486
60 0.000 0.110 4.998 4.396 0.712 3.980 3.900 0.622 1055.869 3.831
65 0.000 0.000 4.396 3.728 0.668 3.885 3.950 0.651 1156.538 4.181
70 0.000 0.000 3.728 0.000 0.613 3.796 4.000 0.679 1259.157 4.536
75 0.000 0.000 3.115 0.000 0.547 3.712 4.050 0.705 1363.727 4.898
80 0.000 0.000 2.568 0.000 0.498 3.634 4.100 0.730 1470.247 5.266
85 0.000 0.000 2.070 0.000 0.449 3.562 4.150 0.754 1578.719 5.639
90 0.000 0.000 1.621 0.000 0.397 3.497 4.200 0.778 1689.140 6.019
95 0.000 0.000 1.224 0.000 0.344 3.440 4.250 0.816 1801.513 6.413
100 0.000 0.000 0.880 0.000 0.289 3.391 4.300 0.866 1915.836 6.819
105 0.000 0.000 0.591 0.000 0.233 3.352 4.350 0.928 2032.110 7.238
110 0.000 0.000 0.358 0.000 0.177 3.326 4.400 0.997 2150.335 7.666
115 0.000 0.000 0.181 0.000 0.091 3.313
120 0.000 0.000 0.090 0.000 0.045 3.307
125 0.000 0.000 0.045 0.000 0.023 3.303
130 0.000 0.000 0.022 0.000 0.011 3.302
135 0.000 0.000 0.011 0.000 0.006 3.301
140 0.000 0.000 0.005 0.000 0.002 3.300
145 0.000 0.000 0.003 0.000 0.001 3.300
150 0.000 0.000 0.002 0.000 0.001 3.300
155 0.000 0.000 0.001 0.000 0.000 0.000

Post-development without pond Q100 peak flow = 1.240


m3/s
Post-development without pond Q100 peak flow time = 20 min
16
Post-development with pond Q100 peak flow = 0.734
m3/s
Post-development with pond Q100 peak flow time = 55 min

Post-development Q100 maximum pond water level, RL = 4.108 m

Freeboard = Pond Top Level - Max. Water Level


= 4.400m - 4.108m
= 0.292m