Sand & Silt Under Water SS20B Earth work in Slush and
50A silt under water upto 0.75m depth requiring the aid of 30.45cum Pond Ash (wet/dry) 57A
basket and vessels SS.20.B
Trimming the bed and the side slope of the bank in all soils
50B except hard rock upto a thickness of 7.5 cm and making it 6.30cum Refilling sand - 84
ready to receive the concrete
Trimming the bed and the side slope of the bank in all soils
Refilling soil (other than sand)
50C except hard rock upto a thickness of 7.5 cm to 15 cm and 7.65cum
- 85
making it ready to receive the concrete
MR-&-DMR (Not Requiring Blasting) Earth work in medium Mixing mortar by Machine
72 95.50cum
rock and dense medium rock not requiring blasting mixing
39 Hard rock measured in solid including blasting & stacking 258.30cum LIFT CHRGES
2 Providing and erecting direction and place identification retroreflective sign as per IRC: 67-2001 made of
High intensity Grade sheeting,2.0mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron
post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade
cement concrete 45x45x60cm, 60cm below ground level,etc. complete as per MORT&H specification No.801
for area more than 0.90sqm
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)
3 Providing and fixing of retroreflective cautionary,mandatory and informatory sign as per IRC: 67-2001
made of High intensity Grade sheeting vide clause 801.3 fixed over Aluminium sheeting 1.50mm thick
supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45x45x60cm, 60cm below ground level,etc. complete as
per MORT&H specification No.801
a) 300mm x 900mm
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)
7 Providing and fixing of retroreflective cautionary,mandatory and informatory sign as per IRC: 67-2001
made of High intensity Grade sheeting vide clause 801.3 fixed over Aluminium sheeting 1.50mm thick
supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45x45x60cm, 60cm below ground level,etc. complete as
per MORT&H specification No.801 (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)
9 Providing and fixing unidirectional reflective pavement marker (RPM) or road studs bonded to or
anchored with in the road surface for lane marking and delineation for high time visibility,with plastic
body of RPM / road studs moulded from ASA (Acrrylic Atrene Acrylonitrite) or Hips (High impact
Polystyrene).The marker shall support a load of 13635Kg.tested in accordance with ASTMD
4280.Reflective panels shall consist of number of lenses containing single or duel prismatic cube
capable of providing total internal reflection of the light entering the lensface.Lenses shall be
moulded of methylmethecrylate conforming to ASTMD 788 or equivqlent etc., complete (as per
Technical specificaton NHAI clause A-8) (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)
10 Providing and fixing of road stud 100 x100mm diecast Aliminium resistant to corrosivee efect of
salt and girt, fitted with lens reflectors,installed in concrete or asphaltic surface by drilling hole
30mm up to a depth of 60mm and bedded in a suitable bituminious grout or epoxy mortar etc.
complete (as per BS:873(Part-4) 1973) (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)
11 Providing RCC M15 grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.804) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)
12 Providing RCC M15 grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.804) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)
13 Providing RCC M15 grade Boundary Pillars of standard design as per IRC 25-1967 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.806) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)
14 Flexwell Delineators:Supply and fixing of flex well delinators made of high quality plastic material with
PMMA/Polycarbonate material as reflectors fixed on plastic base by ultrosonic welding process fitted on
delineator body by rivets of 1100mm,width 106mm (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)
15 Supply and fixing of delineators with following specifications:
1)The reflector made on Matacryl resin
2)Valuable refletion area is 92mm x 19mm
3)Reflection Flam-ABS
4)Stay made up of specialised extruded aluminium alloy Length:320mm,width:108mm
5)Anchor Bolt:Anodized anchor bolt T-840
6)Lens color:yellow
7)Total length of ABS stay /Holder:Width:56mm, Length:81mm x 5Nos
8)No. of lenses:5
9) Distance between lenses:56mm
Each panel shall be designed to attach-adhere to and shall be compatible with concrete safety barriers/guard
rails/existing structures and pipelines with necessary hardware/frames.Each panel shall confirm to the retro
reflectance and chromaticity limits specified in the details technical specification and as directed by the
Engineer
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 31.08.2009)
16 Providing and fixing of retroreflective cautionary star sign made by High Intensity Prismatic Reflective Grade
sheeting sticked over CR sheet 0.20mm/32G thickness with black enamel paint firmly fixed on the trees with 1
1/2" x 14G wire nails. (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 31.08.2009)
17 Supply and fixing of RCC gudie posts of size 1.20 x0.20 x0.20m with reflective star stickers with
tin M S sheet with two side packing and top cover of 0.75 inches in R C 1:2:4 mix using 20mm,HBG
metal with10mm,dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould
with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and
conveyance of materials to work site etc., complete (CE(H) Chennai Memo No.7130/contracts-
1/2008/ dated: 31.08.2009)
18 Providing and erecting Single sided Double Guard Rail system comprising of 3mm thick all
"W" beams,posts and spaer channels shall be made by cold roll forming using HR coils conform to
IS 5986 Fe 410/360.and hot dip galvanized having Zinc mass of 550gms/sqm minimum 95cm
above road / ground level, fixed on ISMC series channel vertical post, 180 x 75 x 5mm,spaced 2mtr
centre to centre,312mm x 83mm flange width x 3mm thick,4318mm long.Post directly embedded in
the concrete (M20) pit size 350x350x800mm for a length of 900mm below gound level.All fixing
bolts and nuts hot dip galvanized confirming to IS 1367 clause 4.6 all complete as per Technical
specifications and as directed by the Enginer-in-charge. (CE(H) Chennai Memo No.7130/contracts-
1/2008/ dated: 31.08.2009)
Above 80 Kms.
2.55
Unloading
Above 80 Kms.
4.05
Unloading
Steel
48000.00
2400.00
50400.00
rk Labour
185.00
193.00
193.00
193.00
175.00
191.00
173.00
155.00
178.00
nternal dia-tks-Outter dia
NP3
450-75-600
600-85-770
700-85-870
900-100-1100
1000-115-1230
1100-115-1330
1200-120-1440
48.00kg
72.00cum
65.00cum
11.30cum
12.80cum
4.60cum
3.70cum
2.30cum
6.90cum
37.70cum
50.10cum
38.85cum
77.45cum
38.30cum
76.85cum
76.85cum
22.80cum
30.65cum
224.00
207.00
189.00
207.00
189.00
224.00
207.00
171.00
224.00
207.00
224.00
207.00
253.00
235.00
Rs.6,097.00
Rs.6,356.00
Rs.2,515.00
Rs.2,900.00
Rs.1,974.00
Rs.2,577.00
Rs.3,513.00
Rs.2,515.00
Rs.2,943.00
Rs.4,425.00
705/Sqm
300/Each
332/Each
906/Each
256/Each
253/Each
720/Each
1661/Each
48/Each
942/Each
4581/Each
Hire & Labour
Charges
/M3
/ 225M 3
/300 M 3
/ M3
/ 10 M 2
/ 10 M 2
/M3
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
ller
Hire & Labour
Charges
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
011
Quarry CMP 10/16/2011
Emulsio
Earth 1 Km 1 Km ### Diesel 44.29
n
Gravel 1 Km 1 Km 60/70 ### Kerosene 25.00
Furnace
Metal 2 Km 1 Km 80/100 ### 42.33
oil
Sand 120 Km ###
With Without
Description Lead Cost Conveyance Stacking
stacking stacking
WBM Grade II Gravel 948.41 /Cum 956.95 /Cum 965.48 /Cum 974.01 /Cum 982.55 /Cum 635.12 /Cum
WBM Grade III Gravel 1155.65 /Cum 1164.19 /Cum 1172.72 /Cum 1181.25 /Cum 1189.79 /Cum 773.28 /Cum
WBM Grade II SG mix 971.85 /Cum 981.92 /Cum 991.99 /Cum 1002.05 /Cum 1012.13 /Cum 651.26 /Cum
WBM Grade III SG mix 1179.09 /Cum 1189.16 /Cum 1199.23 /Cum 1209.29 /Cum 1219.37 /Cum 789.42 /Cum
Premix Carpet with seal Coat 170.41 /Sqm 170.64 /Sqm 170.88 /Sqm 171.11 /Sqm 171.35 /Sqm 113.68 /Sqm
Advance Patch 45mm 2723.76 /Cum 2730.25 /Cum 2736.74 /Cum 2743.22 /Cum 2749.71 /Cum 1818.00 /Cum
Advance Patch 13.2mm 2908.76 /Cum 2915.25 /Cum 2921.74 /Cum 2928.22 /Cum 2934.71 /Cum 1941.34 /Cum
Prime coat over WMM 6 Kg of Emulsion 38.45 /Sqm 38.45 /Sqm 38.45 /Sqm 38.45 /Sqm 38.46 /Sqm 25.63 /Sqm
Tack Coat over WMM 2.5 Kg of Emulsion 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 9.27 /Sqm
Tack Coat over BM 2.0 Kg of Emulsion 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 7.76 /Sqm
Tack Coat over WBM 4 Kg of Emulsion 29.35 /Sqm 29.36 /Sqm 29.36 /Sqm 29.36 /Sqm 29.36 /Sqm 19.57 /Sqm
Tack Coat over BT 2.5 Kg of Emulsion 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 9.27 /Sqm
WBM,TC,PC&SC
Gravel 1 Km 1 Km 1 Km 1 Km 1 Km
Metal 2 Km 3 Km 4 Km 5 Km 6 Km
80/100 Gr
398 Km 399 Km 400 Km 401 Km 402 Km
Bitumen
920
9.45
Third Fourth Fifth
Lead Conveyance Stacking Total Lead Conveyance Stacking Total Lead Conveyance
1 Km `. 6.40/Cum 3.05 120.45 1 Km `. 6.40/Cum 3.05 120.45 1 Km `. 6.40/Cum
4 Km `. 25.60/Cum 3.15 112.75 5 Km `. 32.00/Cum 3.15 119.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 295.75 5 Km `. 32.00/Cum 3.15 302.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 413.75 5 Km `. 32.00/Cum 3.15 420.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 496.75 5 Km `. 32.00/Cum 3.15 503.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 656.75 5 Km `. 32.00/Cum 3.15 663.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 908.75 5 Km `. 32.00/Cum 3.15 915.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 581.75 5 Km `. 32.00/Cum 3.15 588.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 841.75 5 Km `. 32.00/Cum 3.15 848.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 439.75 5 Km `. 32.00/Cum 3.15 446.15 6 Km `. 38.40/Cum
122 Km `. 531.30/Cum 641.30 123 Km `. 534.95/Cum 644.95 124 Km `. 538.60/Cum
374 Km 523.08 MT 45,488.28 375 Km 524.48 MT 45,489.68 376 Km 525.88 MT
400 Km 793.71 MT 43,923.55 401 Km 795.69 MT 43,925.53 402 Km 797.68 MT
1st to 3rd 1st to 4th 1st to 5th
FORMING EMBANKMENT by cutting the EARTH WORK EXCAVATION AND COMPACTION BY POWER ROLLER - By cutting
Earth work SS 20 B as per SI No
`. 36.40/Cum
62
FORMING EMBANKMENT Using cut earth with an average lead of 1Km AND COMPACTION BY POWER ROLLER - Using cut earth with an average lead of 1Km (labour and machinery charges only)
For 97% Compaction For 100 % Compaction
Labour Charges For Spreading 1.00 Cum `. 3.46/Cum `3.46 1.00 Cum `. 3.46/Cum `3.46
Hire Charges for machinery 1.00 Cum `. 5.11/Cum `5.11 1.00 Cum `. 5.94/Cum `5.94
Total `. 8.57/Cum `. 9.40/Cum
Granular sub - base with close graded material [Table - 400-1]-401 PLANT MIX METHOD MIX IN PLACE METHO
53 mm to 22.4 mm
Cost of 53.00 mm to 22.40 mm metal broken stone 144.00 Cum `. 642.83/Cum `92,567.52 192.00 Cum
(50%)
22.4 mm to 4.75
53 mm IRC `.474.40/Cum mm of Gravel 57.00 Cum `. 117.40/Cum `6,691.80 76.00 Cum
(20%)
4.75 mm below of
46.5 mm IRC `.634.40/Cum 86.40 Cum `. 634.00/Cum `54,777.60 115.20 Cum
sand (30%)
45 mm IRC `.634.40/Cum Water 27.00 KL `. 120.00/Cum `3,240.00 18.00 KL
Hire and Labour
37.5 mm IRC `.647.40/Cum 225.00 Cum `. 25,779.20/Cum `25,779.20 300.00 Cum
Charges
26.5 mm IRC `.611.40/Cum Cost for 300Cum = `183,056.12 Cost for 300Cum =
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 10.00 Sqm `. 15.00/10Sqm `15.00
Dense Bituminous Macadam 75 mm thick Rate for one Cum of Dense Bituminous Macadam 75 mm thick
37.50 - 13.2 mm Metal Cost of 37.5 mm - 13.20 mm 0.35 Cum `. 746.15/Cum
Cost of 26.5mm metal 0.51 Cum `. 611.40/Cum `311.81 Cost of 13.20mm - 2.36 mm 0.45 Cum `. 399.07/Cum
Cost of 22.4mm metal 0.49 Cum `. 886.40/Cum `434.34 Cost of 2.36 mm and below 0.20 Cum `. 370.40/Cum
`746.15 Cost of quarry dust 0.02 Cum `. 90.40/Cum
13.2 - 2.36 mm Metal Cost of (60/70) Bitumen 74.25 Kg `. 44,918.94/MT
Cost of 11.2mm metal 0.61 Cum `. 417.40/Cum `254.61 Hire & Labour Charges 10.00 Sqm `. 1,561.26/10Sqm
Cost of 2.36mm metal 0.39 Cum `. 370.40/Cum `144.46 Rate for 10 sqm of 75 mm thick =
`399.07 Rate per M3
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40
Dense Bituminous Macadam 50 mm thick Rate for one Cum of Dense Bituminous Macadam 50 mm thick
26.5 - 13.2 mm Metal Cost of 26.5 mm - 13.20 mm 0.35 Cum `. 886.40/Cum
Cost of 22.4mm metal 1.00 Cum `. 886.40/Cum `886.40 Cost of 13.20mm - 2.36 mm 0.21 Cum `. 402.83/Cum
Cost of 2.36 mm and below 0.14 Cum `. 370.40/Cum
13.2 - 2.36 mm Metal Cost of (60/70) Bitumen 49.50 Kg `. 44,918.94/MT
Cost of 11.2mm metal 0.69 Cum `. 417.40/Cum `288.01 Hire & Labour Charges 10.00 Sqm `. 1,060.36/10Sqm
Cost of 2.36mm metal 0.31 Cum `. 370.40/Cum `114.82 Rate for 10 sqm of 50 mm thick =
`402.83 Rate per M3
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40
Bituminous Macadam 75 mm thick Rate for one Cum of Bituminous Macadam 75 mm thick
45 - 22.4 mm Metal Cost of 45 mm - 22.40 mm 0.63 Cum `. 740.65/Cum
26.5mm metal 0.53 Cum `. 611.40/Cum `324.04 Cost of 11.20mm - 2.8 mm 0.25 Cum `. 399.07/Cum
22.4mm metal 0.47 Cum `. 886.40/Cum `416.61 Cost of 22.4 mm - 11.2 mm 0.16 Cum `. 819.40/Cum
`740.65 Cost of (60/70) Bitumen 58.00 Kg `. 44,918.94/MT
11.2 - 2.8 mm Metal Hire & Labour Charges 10.00 Sqm `. 1,557.44/10Sqm
Cost of 6.7mm metal 0.61 Cum `. 417.40/Cum `254.61 Rate for 10 sqm of 75 mm thick =
Cost of 2.8mm metal 0.39 Cum `. 370.40/Cum `144.46 Rate per M3
`399.07
22.4 - 11.2 mm & metal
Cost of 13.2mm metal 1.00 Cum `. 819.40/Cum `819.40
Bituminous Macadam 50 mm thick Rate for one Cum of Bituminous Macadam 50 mm thick
26.5 - 11.2 mm Metal Cost of 26.5 mm - 11.20 mm 0.42 Cum `. 854.91/Cum
Cost of 22.4mm metal 0.53 Cum `. 886.40/Cum `469.79 Cost of 11.20mm - 2.8 mm 0.10 Cum `. 402.83/Cum
Cost of 13.2mm metal 0.47 Cum `. 819.40/Cum `385.12 Cost of 2.8 mm and below 0.18 Cum `. 370.40/Cum
`854.91 Cost of (60/70) Bitumen 38.00 Kg `. 44,918.94/MT
11.2 - 2.8 mm Metal Hire & Labour Charges 10.00 Sqm `. 1,058.48/10Sqm
Cost of 6.7mm metal 0.69 Cum `. 417.40/Cum `288.01 Rate for 10 sqm of 50 mm thick =
Cost of 2.8 mm Metal 0.31 Cum `. 370.40/Cum `114.82 Rate per M3
`402.83
2.8 mm and below Metal
Cost of 2.8 mm Metal 1.00 Cum `. 370.40/Cum `370.40
46.71 /10Sqm
4.67 /Sqm
LS
`. 56.48/Cum
LS
`. 145.58/Cum
achinery charges only)
`. 645.98/Cum `124,028.16
`. 120.45/Cum `9,154.20
`. 637.05/Cum `73,388.16
`. 120.00/Cum `2,160.00
`. 18,685.44/Cum `18,685.44
`227,415.96
`. 758.05/Cum
`. 883.17 `. 883.17
`. 1,177.56/Cum `. 1,177.56/Cum
Rate Amount Total
`.400.95/Cum `. 10.02
`.483.95/Cum `. 96.79
`.643.95/Cum `. 466.86 `. 610.29
`.895.95/Cum `. 22.40
`.568.95/Cum `. 14.22
`.120.45/Cum `. 28.91 `. 28.91
`. 227.54/10Sqm `. 227.54 `. 227.54
`. 866.74 `. 866.74
`. 1,155.65/Cum `. 1,155.65/Cum
`. 139.09/10Sqm
`. 13.91/Sqm
tal
Amount
`. 822.55
`. 1,932.46
`. 147.35
`. 2,902.36/Cum
`. 268.57
`. 293.25
`. 146.68
`. 312.68
`. 1,021.18
`. 60,427.62
`. 65,981.52
`. 33,002.64
`67,241.30
`3,111.35
`229,764.43
`. 1,021.18
`261.15
`179.58
`74.08
`1.81
`3,335.23
`1,561.26
`5,413.11
`. 7,217.48/Cum
`310.24
`84.59
`51.86
`2,223.49
`1,060.36
`3,730.54
`. 7,461.08/Cum
`466.61
`99.77
`131.10
`2,605.30
`1,557.44
`4,860.22
`. 6,480.29/Cum
`359.06
`40.28
`66.67
`1,706.92
`1,058.48
`3,231.41
`. 6,462.82/Cum
`341.43
`87.49
`0.90
`1,976.43
`861.59
`3,267.84
`. 8,169.60/Cum
As on 10/16/2011
Description Emulsion 60/70 80/100
Basic Price 34,560.00 35,265.00 34,465.00
Detuct drum cost 1,500.00 0.00 0.00
Sub total 33,060.00 35,265.00 34,465.00
Excise Duty @ 14.00% 4,628.40 4,937.10 4,825.10
Education Cess ON ED
2.00% 92.57 98.74 96.50
@
Higher secondary
Education Cess ON ED 1.00% 46.28 49.37 48.25
@
Billable Price 37,827.25 40,350.21 39,434.85
VAT @ 14.50% 5.00% 5,484.95 2,017.51 1,971.74
Total invoice value 43,312.20 42,367.72 41,406.59
Storage Charges on
5.00% 1,653.00 1,763.25 1,723.25
basic price @
Sub total 44,965.20 44,130.97 43,129.84
397.892 Km x
371.632 Km x 1.40 397 Km x 0.9924 x
Conveyance 0.9924 x 2 =
x 1 = 520.28 2 = 787.97
789.74
45,485.48 44,918.94 43,919.58
Sand Gravel Mix for Blindage
First Second
Description Quantity
Rate Amount Rate Amount
Cost of Gravel 0.57 Cum `. 120.45/Cum Rs.68.66 `. 120.45/Cum Rs.68.66
Cost of Quarry Dust 0.75 Cum `. 99.95/Cum Rs.74.96 `. 106.35/Cum Rs.79.76
Mixing Charges 10.00sqm `. 50.08/10Sqm Rs.50.08 `. 50.08/10Sqm Rs.50.08
Rate per 1 Cum Rs.193.70 Rs.198.50
First Second
Cost of Bitumen Emulsion 0.006 MT `. 45,485.48/MT `272.91 `. 45,486.88/MT `272.92
Labour charges 10.00 Sqm `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 384.51/10Sqm `. 384.52/10Sqm
Rate per sqm `. 38.45/Sqm `. 38.45/Sqm
TACK COAT OVER WMM SURFACE USING 2.5 KG OF BITUMEN EMULSION
First Second
Cost of Bitumen Emulsion 0.0025 MT `. 45,485.48/MT `113.71 `. 45,486.88/MT `113.72
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 139.09/10Sqm `. 139.10/10Sqm
Rate per sqm `. 13.91/Sqm `. 13.91/Sqm
TACK COAT OVER BM SURFACE using 2.0 KG of Bitumen Emulsion
First Second
Cost of bitumen Emulsion 0.0020 MT `. 45,485.48/MT `90.97 `. 45,486.88/MT `90.97
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 116.35/10Sqm `. 116.35/10Sqm
Rate per sqm `. 11.64/Sqm `. 11.64/Sqm
TACK COAT OVER WBM SURFACE using 4.0 KG of Bitumen Emulsion
First Second
Cost of bitumen Emulsion 0.004 MT `. 45,485.48/MT `181.94 `. 45,486.88/MT `181.95
Labour charges 10.00 Sqm `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 293.54/10Sqm `. 293.55/10Sqm
Rate per sqm `. 29.35/Sqm `. 29.36/Sqm
TACK COAT OVER BT SURFACE using 2.5 KG of Bitumen Emulsion
First Second
Cost of bitumen Emulsion 0.0025 MT `. 45,485.48/MT `113.71 `. 45,486.88/MT `113.72
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 139.09/10Sqm `. 139.10/10Sqm
Rate per sqm `. 13.91/Sqm `. 13.91/Sqm
Advance patch work using 45mm IRC metal over the existing BT surface using 44Kg of bitumen of grade 80/100 per cum
First Second
Description Qty Rate Amount Rate Amount
45 mm IRC metal 1.00 Cum `. 643.95/Cum `. 643.95 `. 650.35/Cum `. 650.35
Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT `. 1,932.46 `. 43,921.56/MT `. 1,932.55
Labour Charges 1.00 Cum `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
Rate for 1.00 cu.m `. 2,723.76/Cum `. 2,730.25/Cum
Advance patch work using 13.20mm IRC metal over the existing BT surface using 44Kg of bitumen of grade 80/100 per cum
First Second
Description Qty Rate Amount Rate Amount
13.20mm IRC metal 1.00 Cum `. 828.95/Cum `. 828.95 `. 835.35/Cum `. 835.35
Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT `. 1,932.46 `. 43,921.56/MT `. 1,932.55
Labour Charges 1.00 Cum `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
Rate for 1.00 cu.m `. 2,908.76/Cum `. 2,915.25/Cum
Fourth Fifth
Amount Total Rate Amount Total
`. 10.50 `.426.55/Cum `. 10.66
`. 100.63 `.509.55/Cum `. 101.91
`. 480.78 `. 629.49 `.669.55/Cum `. 485.42 `. 635.89
`. 22.88 `.921.55/Cum `. 23.04
`. 14.70 `.594.55/Cum `. 14.86
`. 49.94 `. 49.94 `.212.90/Cum `. 51.10 `. 51.10
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 906.97 `. 906.97 `. 914.53 `. 914.53
`. 1,209.29/Cum `. 1,209.29/Cum `. 1,219.37/Cum `. 1,219.37/Cum
Fourth Fifth
Amount Total Rate Amount Total
`. 15.11 `.308.55/Cum `. 15.43
`. 189.07 `.426.55/Cum `. 191.95
`. 213.84 `. 474.06 `.509.55/Cum `. 216.56 `. 480.46
`. 33.16 `.669.55/Cum `. 33.48
`. 22.88 `.921.55/Cum `. 23.04
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 730.51 `. 730.51 `. 736.91 `. 736.91
`. 974.01/Cum `. 974.01/Cum `. 982.55/Cum `. 982.55/Cum
Fourth Fifth
Amount Total Rate Amount Total
`. 10.50 `.426.55/Cum `. 10.66
`. 100.63 `.509.55/Cum `. 101.91
`. 480.78 `. 629.49 `.669.55/Cum `. 485.42 `. 635.89
`. 22.88 `.921.55/Cum `. 23.04
`. 14.70 `.594.55/Cum `. 14.86
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 885.94 `. 885.94 `. 892.34 `. 892.34
`. 1,181.25/Cum `. 1,181.25/Cum `. 1,189.79/Cum `. 1,189.79/Cum
Earth Work for forming Embankment
Granular Sub Base - Grade I &III (Plant Mix) `. 813.58/Cum
Granular Sub Base - Grade I & III (Place Mix) `. 758.05/Cum
Mixing Charges for Sand Gravel mix fo WBM blindage Rs.188.90
Gravel `. 948.41/Cum
WBM Grade II
SG mix `. 970.32/Cum
Gravel `. 1,155.65/Cum
WBM Grade III
SG mix `. 1,177.56/Cum
Wet mix Macadam `. 1,021.18
Advance Patch 45mm `. 2,717.38/Cum
Advance Patch 13.2mm `. 2,902.38/Cum
Prime coat over WMM 6 Kg of Emulsion `. 38.45/Sqm
Tack Coat over WMM 2.5 Kg of Emulsion `. 13.91/Sqm
Tack Coat over BM 2.0 Kg of Emulsion `. 11.64/Sqm
Tack Coat over WBM 4 Kg of Emulsion `. 29.35/Sqm
Tack Coat over BT 2.5 Kg of Emulsion `. 13.91/Sqm
Premix Carpet with seal Coat `. 170.18/Sqm
Using CMP, Paver & Vibratory roller
Bituminous Macadam 50 mm thick `. 6,480.29/Cum
Bituminous Macadam 75 mm thick `. 6,462.82/Cum
Dense Bituminous Macadam 50 mm thick `. 7,461.08/Cum
Dense Bituminous Macadam 75 mm thick `. 7,217.48/Cum
Semi Dense Bituminous Concrete 25 mm thick `. 196.39/Sqm `. 7,855.40/Cum
Bituminous Concrete 40 mm thick `. 6,535.68/Cum
Bituminous Concrete 25 mm thick - Data incomplete
Tack Coat over WBM using 80/100
Tack Coat over BT using 80/100
Premix Carpet
Quarry CMP
Earth 1 Km 1 Km
Gravel 1 Km 1 Km
Metal 10 Km 10 Km
Sand 39 Km 50 Km
2/16/2012
Emulsion 372 Km Diesel 44.29
60/70 399 Km Kerosene 25.00
80/100 398 Km Furnace oil 42.33
Description Lead Cost Conveyance Total
90 1 267.00 6.40 273.40
75 1 299.00 6.40 305.40
63 1 385.00 6.40 391.40
53 1 468.00 6.40 474.40
46.5 1 628.00 6.40 634.40
45 1 628.00 6.40 634.40
37.5 1 641.00 6.40 647.40
26.5 1 605.00 6.40 611.40
25 1 605.00 6.40 611.40
22.4 1 880.00 6.40 886.40
13.2 1 813.00 6.40 819.40
11.2 1 553.00 6.40 559.40
6.7 1 411.00 6.40 417.40
6 1 411.00 6.40 417.40
5.6 1 411.00 6.40 417.40
4.75 mm & below IRC 1 364.00 6.40 370.40
25 1 605.00 6.40 611.40
12 1 553.00 6.40 559.40
6 1 411.00 6.40 417.40
Stone Dust 1 84.00 6.40 90.40
Gravel 1 111.00 6.40 117.40
Sand 120 110.00 524.00 634.00
Dense Bituminous Macadam 75 mm thick
37.50 - 13.2 mm Metal
Cost of 26.5mm metal 0.51 Cum `. 611.40/Cum `311.81
Cost of 22.4mm metal 0.49 Cum `. 886.40/Cum `434.34
`746.15
13.2 - 2.36 mm Metal
Cost of 11.2mm metal 0.61 Cum `. 417.40/Cum `254.61
Cost of 2.36mm metal 0.39 Cum `. 370.40/Cum `144.46
`399.07
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40
Labour charges
Mazdoor class-I Each Rs. 173.00
Mazdoor class-II Each Rs. 155.00
Mazdoor class-III Each Rs. 155.00
Haed mazdoor Each Rs. 178.00
Dresser and surveying allingnment Each Rs. 114.00
Forming edge bund per 10M² Rs. 1.85
Maintaining berm for traffic per 10M² Rs. 1.85
Watering and keeping surface moist per 10M² Rs. 1.85
Rent to tools including baskets per 10M² Rs. 1.85
Sundries such as ropes per 10M² Rs. 1.82
Total hire and labour charges per Cum = 5.94 + 3.46 = 9.40
POWER ROLLER
720.00
885.80
1605.80
3.78
1008.00
1151.54
2159.54
2.16
5.94
346.00
3.46
9.40
GRANULAR SUB BASE - GRADE - I GRANULAR SUB BAS
PLANT MIX METHOD (Taking output as 225.00 Cum) Cost of 53.00 mm to 22.40 mm metal
Gravel =
Conveyence
=
at Km
/7
Sand =
Conveyence
=
charge at Km
PLANT MIX METHOD (Taking output as 225.00 Cum) PLANT MIX METHOD
Quantity Description
HIRE CHARGES FOR MACHINERIES :
100.80 Cum 9.5 mm to 4.75 mm Gravel (35%)
6.00 Hour Wet mix plant 75 tonne capacity 971.00 hour 5826.00 36.00 Cum 4.75mm to 2.36 mm of Metal Chips (12
6.00 Hour Electric Generating set - 125 KVA 563.00 hour 3378.00 115.20 Cum 2.36 mm below of sand (52.5%)
4.50 Hour Water tanker 6 KL cpacity 1744.00 day 981.00 27.00 KL Water
6.00 Hour Front end loader 1 Cum bucket capacity 1048.00 day 786.00 225.00 Cum Hire and Labour charges
450.00 t km Tipper 10 tonne capacity 952.00 day 714.00
10 % cost of carriage to cover loading and unloading 714.00 71.00
6.00 Hour Motor grader 110 HP 1471.00 /Hour 8826.00
6.00 Hour Vibratory roller 8 -10 tonnes 4720.00 day 3540.00
Total Hire Charges = 24122.00
LABOUR CHARGES
2.Tipper
Hire & running charges per day = 952.00
Fuel Charges 3.25 litres per hour 3.25 lit of Diesel/ hr x 8 x 44.29= 1151.54
Total hire charges including fuel per d 2103.54
Total hire charges including fuel per Hour = 2103.54 / 8 = 262.94
3.Water tanker
Hire & running charges per day = 744.00
Fuel Charges 25 litres per day 25 lit of Diesel/ day x 44.29= 1107.25
Total hire charges including fuel per d 1851.25
Total hire charges including fuel per Hour = 1851.25 / 8 = 231.41
4.Vibaratory Roller
Hire & running charges per day = 4720.00
Fuel Charges 3.00 litres per hour 3 lit of Diesel/ hr x 8 x 1008= 1062.96
Total hire charges including fuel per day 5782.96
Total hire charges including fuel per Hour = 5782.96 / 8 = 722.87
5 Hire charges for Motor Grader including fuel charges per Hour.(Local rate) 1471.00
=
5 Hire charges for Motor Grader including fuel charges per Hour. = 1471.00
6 Hire charges for Base mix plant ( PUG mill) including fuel charges per Hour. = 726.00
312.68/10 Sqm
Working out Metal Rate.(45 to 22.40mm metal )
Size of Metal Unit per Rate
1.00M3 Cost of 45 mm metal M3
1.00M3 Cost of 37.50 mm metal M3
1.00M3 Cost of 26.50 mm metal M3
1.00M3 Cost of 25.0 mm metal M3
1.00M3 Cost of 22.40 mm metal M3
TOTAL
Average rate = /5=
Total hire and labour charges for 10M2 = 85.64 + 141.9 = 227.54
WBM GRADE II
0.05 Cum Cost of 90 mm metal
0.45 Cum Cost of 63 mm metal
0.425 Cum Cost of 53 mm metal
0.05 Cum Cost of 45 mm metal
0.025 Cum Cost of 22.4 mm metal
WBM GRADE III
0.025 Cum Cost of 63 mm metal
0.20 Cum Cost of 53 mm metal
0.725 Cum Cost of 45 mm metal
0.025 Cum Cost of 22.4 mm metal
0.025 Cum Cost of 11.2 mm metal
Labour Charges for Patch work with bituminous premix materials
for 0.625 Cum of Bituminous Material
147.35 / Cum
PRIME COAT OVER WMM SURFACE using 6 KG OF Bitumen Emulsion
LABOUR CHARGES
FOR PREPARING THE SURFACE:
DATA
Qty Description of item Rate Unit Amount
6.00 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 96.60 10 Sqm 96.60
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
DATA
Qty Description of item Rate Unit Amount
2.50 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER WMM SURFACE using 2.5 KG OF Bitumen Emulsion
HIRE CHARGES :
LABOUR CHARGES
DATA
LABOUR CHARGES
DATA
LABOUR CHARGES
DATA
BITUMEN BOILER
LABOUR CHARGES
Total hire and labour charges per 10 sqm = 8.01 + 118.8 = 126.81
126.81 /10sqm
DATA
HIRE CHARGES :
BITUMEN BOILER
LABOUR CHARGES
Total hire and labour charges per 10 sqm = 4.01 + 44.98 = 48.99
48.99 /10sqm
DATA
LABOUR CHARGES
0.75 No. Mazdoor Category I for premix carpet 173.00 Each 129.75
Total labour for 10sqm of PC = 129.75
Total hire and labour charges per 10 sqm = 196.66 + 129.75 = 326.41
326.41/ 10 Sqm
DATA
Subdata (A)
Material for 270sqm
Description of item Rate Unit
Subdata (B)
Amount
77962.25
1223.10
8432.00
1054.00
1328.70
1058.25
7196.10
10637.05
119.00
143.94
262.94
2128.00
266.00
265.74
531.74
720.00
885.80
1605.80
63822.30
1314.71
3190.44
9634.80
77962.25
288.75
4567.20
3100.00
1384.00
9051.20
4.53
293.28
PREMIX CARPET WITH SEAL COAT Type - A using CMP
8432.00
1054.00
1328.70
1058.25
7196.10
10637.05
327.29
720.00
885.80
1605.80
f 20 mm thick.
32.12
16.06
2128.00
266.00
265.74
531.74
16.36
119.00
143.94
262.94
48.54
10sqm
5709.00
3875.00
1730.00
11314.00
56.57
496.94
Amount
496.94
BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
0.37 M 3
Cost of 2.8 mm metal M3
Rate per M3 =
Working out Metal Rate.( 22.4 - 11.2 mm & metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 13.2 mm metal M3
Rate per M3 =
Rate per M3 =
Working out Metal Rate.( 13.2 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.61 M3 Cost of 11.2 mm metal M3
0.39 M3 Cost of 2.36 mm metal M3
Rate per M3 =
Working out Metal Rate.( 2.36 mm & below metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 2.36 mm metal M3
Rate per M3 =
1600.78.00/10 Sqm
1561.26/10 Sqm
Rate per M3 =
DATA
Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.25 M3 Cost of 19 - 9.5 mm graded metal M3
0.14 M3 Cost of 9.5 - 2.36 mm graded metal M3
0.01 M3 Cost of Quarry dust M3
Kgs Cost of Bitumen ( % of weight of mix) MT
10.0 M2 Hire & Labour Charges 540.33 M2 540.33
Rate for 10 Sqm =
Rate per Sqm =
BITUMINOUS CONCRETE 40 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for BC = 170.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/170 = 625.71
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BC = 300.00 sqm of 40 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 53.53
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM = 400.00 sqm of 40 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 17.52
400
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 170.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 170 = 31.28
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 170.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 92.80
170
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 625.71+53.53+31.28+92.8=
= 803.32 /M2
Rs 803.32/ 10 Sqm.
Using Vibratory Roller = 625.71+17.52+31.28+92.8=
= 767.31 /M2
Rs 767.31/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1200.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 94.28
1200
Total Hire Charges and Labour charges.
Using Power Roller. = 803.32 + 94.28 = 897.60
897.6.00/10 Sqm
Using Vibratory Roller. = 767.31 + 94.28 = 861.59
861.59/10 Sqm
Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.40 M 3
Cost of 26.5 - 9.5 mm graded metal M 3
LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00
22884 x 10 Sqm = 190.70
1200
Total hire and labour charges per 10 sqm = 428.95 + 190.7 = 619.65
Total hire and labour charges per 10 sqm = 229.08 + 173 = 402.08
Total hire and labour charges per 10 sqm = 229.27 + 114.42 = 343.69
2 Bitumen 60/70 Grade 0.00 MT 28095.00 /MT 27005.00 /MT -1090.00 /MT
3 Bitumen 80/100 Grade 0.00 MT 27295.00 /MT 26205.00 /MT -1090.00 /MT
. Total
of Tiruppur - Perumanallur - Kunnathur -Perundurai road
Rs. 0 0.00%
Rs. 0 0.00% 3.00%
Rs. 0 0.00%
cal Market Rate - COMPARATIVE STATEMENT
Value of work put to
Amount Percentage
tender
Sl.No. Item
1 Vibrated Cement Concrete M15 grade Nominal mix 1:2:4 using 40mm
2 Vibrated Cement Concrete M15 grade Nominal mix 1:2:4 using 40mm
ABSTRACT
1 Bitumen Emulsion
2 Bitumen 60/70 Grade
3 Bitumen 80/100 Grade
4 Cement
5 Steel
e at Km 22/8-24/8 of Tiruppur - Perumanallur - Kunnathur -Perundurai
0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/3)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/1.2)X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/1.5)X= 0.00 MT
0.0408X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT
(4/10)X= 0.00 MT
(24.4/10)X= 0.00 MT
(6/10)X= 0.00 MT
(2.5/10)X= 0.00 MT
(3/10)X= 0.00 MT
(2.5/10)X= 0.00 MT
44X= 0.00 MT
44X= 0.00 MT
99X= 0.00 MT
76X= 0.00 MT
3X= 0.00 MT
99X= 0.00 MT
77.333X= 0.00 MT
0.00 MT
0.00 MT
0.00 MT
0.00 MT
0.00 MT