Sei sulla pagina 1di 131

TIRUPPUR (H) CIRCLE

PWD ISS Materials Highways


57 Gravel 111.00 90mm size - IRC
59/60 Sand for Mortar 110.00 75mm size - IRC
58 Quarry Rubbish 66.00 63mm size - IRC
58A Stone Dust 84.00 53mm size - IRC
57A Well Gravel 98.00 46.5mm size - IRC
I HBGS Jelly 90 mm size 290.00 45mm size - IRC
ii HBGS Jelly 80 mm size 326.00 37.5mm size - IRC
iii HBGS Jelly 63 mm size 375.00 26.5mm size - IRC
iv HBGS Jelly 50 mm size 435.00 25mm size - IRC
v HBGS Jelly 40 mm size 675.00 22.4mm size - IRC
vi HBGS Jelly 25 mm size 580.00 13.2mm size - IRC
vii HBGS Jelly 20 mm size 940.00 11.2mm size - IRC
viii HBGS Jelly 12 mm size 871.00 6.7mm size - IRC
ix HBGS Jelly 10 mm size 641.00 6mm size - IRC
x HBGS Jelly 6 mm size 435.00 5.6mm size - IRC
xi HBGS Jelly 3 mm size 392.00 4.75mm size & below - IRC
27 Rough stone for Masonry works ( Hard Granite) 302.00 25mm - IRC
28 Rough stone for Revetment works ( Hard Granite) 262.00 12mm - IRC
42 Bond Stone 414.00 6mm - IRC
Cement and Steel (One MT)
0 - 10 Kms. 10 - 20 Kms. 20 - 40 Kms. 40 - 80 Kms.
4.40 3.80 3.35 2.80
An Adhoc extra for inter state works 11.65 Loading 58.50
Rough stone,Broken Stone, Sand,Gravel,Surkhi,Earth (one m 3)
0 - 10 Kms. 10 - 20 Kms. 20 - 40 Kms. 40 - 80 Kms.
7.05 6.05 5.35 4.50
An Adhoc extra for inter state works 18.60 Loading 19.15
Labour charges Material Cement
37 Mason for Brick Work - I Class 291.00 Cost 5200.00
37A Mason for Brick Work - II Class 261.00 Storage at 5% 260.00
38 Mason for Stone Work - I Class 291.00 Total 5460.00
38A Mason for Stone Work - II Class 261.00 Bituminous work Labour
39A Mazdoor - I Class 183.00 Bitumen Sprayer man
39B Mazdoor - II Class 165.00 Bitumen raker man
20 Fitter (Pipe Laying / Bar bending) I Class 253.00 Heat Master Operator
20A Fitter (Pipe Laying / Bar bending) II Class 235.00 Mini Hot Mix Plant Operator
11 Carpenter - I Class 284.00 Gunnuting Plant Operator
12 Carpenter - II Class 261.00 Gunnuting Gun Operator
44 Painter / Varnisher - I Class 235.00 Road Mazdoor Gr. I
44A Painter / Varnisher - II Class 217.00 Road Mazdoor Gr. II
72 Wodder 189.00 Head Mazdoor
Clearing Internal dia-tks-Outter d
1 Clearing Heavy Jungle 2.70sqm NP4 NP2
2 Clearing Light Jungle 2.05sqm 450-35-520 450-35-520
3 Clearing Scrub Jungle 1.90sqm 600-40-680 600-45-690
4 Uprooting&removing large palmyrah/coconut stumps 52.50 700-40-780 700-50-800

5 Uprooting&removing small palmyrah/coconut stumps 37.50 800-45-890 900-55-1010


9 Removing weeds in channel and drain 0.80sqm 900-50-1000 1000-60-1120
1000-55-
9C Cleaning Juliflora jungle with uprooting 3.00sqm 1100-65-1230
1110
1100-60-
9D Cleaning Juliflora jungle without uprooting 2.30sqm 1200-70-1340
1220
Earth work
ORDINARY SOIL SS20A Earth work in Sand, silt or other
Binding wire (Galvanised-18G) -
49 loose soil, wet sand or silt not under water, light black 26.75cum
113b
cotton soil sandy loam and ordinary soil SS.20.A

ORDINARY SOIL SS20B Earth work in Sand, silt or other


50 loose soil, wet sand or silt not under water, light black 24.35cum Screened Kankar Gravel 58B
cotton soil, sandy loam and ordinary soil SS.20.B

Sand & Silt Under Water SS20B Earth work in Slush and
50A silt under water upto 0.75m depth requiring the aid of 30.45cum Pond Ash (wet/dry) 57A
basket and vessels SS.20.B
Trimming the bed and the side slope of the bank in all soils
50B except hard rock upto a thickness of 7.5 cm and making it 6.30cum Refilling sand - 84
ready to receive the concrete

Trimming the bed and the side slope of the bank in all soils
Refilling soil (other than sand)
50C except hard rock upto a thickness of 7.5 cm to 15 cm and 7.65cum
- 85
making it ready to receive the concrete

Sectioning during forming bunds when earth moving


50D 4.70cum Extra 10 m lead -76
machineries, lorries and rollers are used for consolidation.

HGS SS.20.A. Earth work in Hard stiff clay, stiff black


61 cotton, hard red earth, shales,murram, gravel, stoney 38.80cum Extra 1 m lift -77
earth and earth mixed with small size boulders SS.20.A.

HGS SS.20.B. Earth work in Hard stiff clay, stiff black


Breaking clods, consolidating
62 cotton, hard red earth, shales,murram, gravel, stoney 36.40cum
and sectioning
earth and earth mixed with small size boulders SS.20B

SDR - (Not Requiring Blasting) Earth work in Soft


Breaking clods, consolidating
67 disintegrated rock, laterite, soft rock or kankar, not 5.20cum
and sectioning-Bull Dozers.
requiring blasting.
LOOSE BOULDERS Earth work in loose boulders in
67A 85.80cum Mixing mortar by manual
excavation of various size 150mm to 625 mm

MR-&-DMR (Not Requiring Blasting) Earth work in medium Mixing mortar by Machine
72 95.50cum
rock and dense medium rock not requiring blasting mixing

39 Hard rock measured in solid including blasting & stacking 258.30cum LIFT CHRGES

Concrete Above GL add to the


Removing hard rock by wedging, chiseling and trimming to basic ratee for works up to
39A 516.00cum 4.50mheight in ground floor
proper shape where blasting is prohibited.

Add for works in every upper


floor over the rate of preceeding
40A Mediun rock and dense medium rock requiring blasting 132.30cum
floor

Concrete Below GL add to the


Extra for every additional 10m lead or part thereof over basic ratee for works 1.50m
42A 3.20cum and up to 4.50m depth below
the initial lead for blasted materials
GL
Concrete Below GL add to the
Extra for every additional 1m lead or part thereof over the basic ratee for works 4.50m and
42B 3.30cum
initial lift of 2m for blasted materials up to 9.00m depth below GL

Concrete Below GL add extra


over the item 2 for every
44 Benching, hard rock upto an average 10 cm depth 250.00sqm additional 4.50m depth beyond
9.0m depth below GL
46 Drilling holes in hard granite 40mm diameter 83.80RM Concrete vibrators - PCC
46A Drilling holes in hard granite 45mm diameter 97.80RM Concrete vibrators - RCC
47 Drilling holes in hard granite 50mm diameter 116.50RM 42) Mopla - I Class
48 Drilling holes in hard granite 75mm diameter 132.30RM 42A) Mopla - II Class
43) Navagonies or Javali Man - I
49 Drilling holes in hard granite 32mm diameter 71.90RM
Class
19 Fitter - I Class 258.00 46) Pile Driver
19A Fitter - II Class 240.00 48) Pump Driver
25 Hammer Mazdoor 181.00 54) Smith - I Class
26 Head Mazdoor for Well Sinking 189.00 54A) Smith - II Class
55) Sprayer Mazdoor (for
27 Driver (Light Duty) 225.00
bitumen, tar etc.,)
27A Driver (Heavy Duty) 240.00 56) Stone Cutter - I Class
28 Jumper Mazdoor 171.00 56A) Stone Cutter - II Class
36 Maistry, Road Inspector & Work Inspector 217.00 67) Welder / Bracer - I Class
Maistry, Road Inspector &
36A 240.00 67A) Welder / Bracer - II Class
Work Inspector (Degree Holder)
39C Head Mazdoor 189.00 47) Plumber I Class
40 Mechanic - I Class 225.00 47A) Plumber II Class
40A Mechanic - II Class 207.00
Road Furnitures
1 Providing and erecting direction and place identification retroreflective sign as per IRC: 67-2001 made of
High intensity Grade sheeting,2.0mm thick with area not exceeding 0.9 sqm supported on a mild steel angle
iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15
grade cement concrete 45x45x60cm, 60cm below ground level,etc. complete as per MORT&H specification
No.801 for area less than 0.90sqm
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)

2 Providing and erecting direction and place identification retroreflective sign as per IRC: 67-2001 made of
High intensity Grade sheeting,2.0mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron
post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade
cement concrete 45x45x60cm, 60cm below ground level,etc. complete as per MORT&H specification No.801
for area more than 0.90sqm
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)

3 Providing and fixing of retroreflective cautionary,mandatory and informatory sign as per IRC: 67-2001
made of High intensity Grade sheeting vide clause 801.3 fixed over Aluminium sheeting 1.50mm thick
supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45x45x60cm, 60cm below ground level,etc. complete as
per MORT&H specification No.801
a) 300mm x 900mm
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)

7 Providing and fixing of retroreflective cautionary,mandatory and informatory sign as per IRC: 67-2001
made of High intensity Grade sheeting vide clause 801.3 fixed over Aluminium sheeting 1.50mm thick
supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45x45x60cm, 60cm below ground level,etc. complete as
per MORT&H specification No.801 (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 05.06.2008)

a a) 90cm equilateral triangle


b b) 60cm equilateral triangle
c c) 60 cm Circular
d d) 80x60cm rectangular
e e) 60x45cm rectangular
f f) 60x60 cm Square
g g) 90cm High Octogonal
8 Providing and laying of hot applied thermoplastic compound 2.50mm,thick including reflecting
galss beads @ 250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass
beads as per IRC:35.the finished surface to be level, uniform and free from streaks and holes etc.
complete (as per MoRTH specificaton No:803) (CE(H) Chennai Memo No.7130/contracts-1/2008/
dated: 31.08.2009)

9 Providing and fixing unidirectional reflective pavement marker (RPM) or road studs bonded to or
anchored with in the road surface for lane marking and delineation for high time visibility,with plastic
body of RPM / road studs moulded from ASA (Acrrylic Atrene Acrylonitrite) or Hips (High impact
Polystyrene).The marker shall support a load of 13635Kg.tested in accordance with ASTMD
4280.Reflective panels shall consist of number of lenses containing single or duel prismatic cube
capable of providing total internal reflection of the light entering the lensface.Lenses shall be
moulded of methylmethecrylate conforming to ASTMD 788 or equivqlent etc., complete (as per
Technical specificaton NHAI clause A-8) (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)

10 Providing and fixing of road stud 100 x100mm diecast Aliminium resistant to corrosivee efect of
salt and girt, fitted with lens reflectors,installed in concrete or asphaltic surface by drilling hole
30mm up to a depth of 60mm and bedded in a suitable bituminious grout or epoxy mortar etc.
complete (as per BS:873(Part-4) 1973) (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)
11 Providing RCC M15 grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.804) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)

12 Providing RCC M15 grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.804) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)

13 Providing RCC M15 grade Boundary Pillars of standard design as per IRC 25-1967 and fixing in position
including painting and printing etc. complete (as per MORT&H specification No.806) (CE(H) Chennai Memo
No.7130/contracts-1/2008/ dated: 31.08.2009)
14 Flexwell Delineators:Supply and fixing of flex well delinators made of high quality plastic material with
PMMA/Polycarbonate material as reflectors fixed on plastic base by ultrosonic welding process fitted on
delineator body by rivets of 1100mm,width 106mm (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated:
31.08.2009)
15 Supply and fixing of delineators with following specifications:
1)The reflector made on Matacryl resin
2)Valuable refletion area is 92mm x 19mm
3)Reflection Flam-ABS
4)Stay made up of specialised extruded aluminium alloy Length:320mm,width:108mm
5)Anchor Bolt:Anodized anchor bolt T-840
6)Lens color:yellow
7)Total length of ABS stay /Holder:Width:56mm, Length:81mm x 5Nos
8)No. of lenses:5
9) Distance between lenses:56mm
Each panel shall be designed to attach-adhere to and shall be compatible with concrete safety barriers/guard
rails/existing structures and pipelines with necessary hardware/frames.Each panel shall confirm to the retro
reflectance and chromaticity limits specified in the details technical specification and as directed by the
Engineer
(CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 31.08.2009)

16 Providing and fixing of retroreflective cautionary star sign made by High Intensity Prismatic Reflective Grade
sheeting sticked over CR sheet 0.20mm/32G thickness with black enamel paint firmly fixed on the trees with 1
1/2" x 14G wire nails. (CE(H) Chennai Memo No.7130/contracts-1/2008/ dated: 31.08.2009)

17 Supply and fixing of RCC gudie posts of size 1.20 x0.20 x0.20m with reflective star stickers with
tin M S sheet with two side packing and top cover of 0.75 inches in R C 1:2:4 mix using 20mm,HBG
metal with10mm,dia bars as vertical with 8mm dia stirrups including 8.25 inches x 4.25 feet mould
with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and
conveyance of materials to work site etc., complete (CE(H) Chennai Memo No.7130/contracts-
1/2008/ dated: 31.08.2009)

18 Providing and erecting Single sided Double Guard Rail system comprising of 3mm thick all
"W" beams,posts and spaer channels shall be made by cold roll forming using HR coils conform to
IS 5986 Fe 410/360.and hot dip galvanized having Zinc mass of 550gms/sqm minimum 95cm
above road / ground level, fixed on ISMC series channel vertical post, 180 x 75 x 5mm,spaced 2mtr
centre to centre,312mm x 83mm flange width x 3mm thick,4318mm long.Post directly embedded in
the concrete (M20) pit size 350x350x800mm for a length of 900mm below gound level.All fixing
bolts and nuts hot dip galvanized confirming to IS 1367 clause 4.6 all complete as per Technical
specifications and as directed by the Enginer-in-charge. (CE(H) Chennai Memo No.7130/contracts-
1/2008/ dated: 31.08.2009)

Design and cost as per PWD schedule of Rates:


Kilometre Stone 1.65 x 0.45 x 0.15m at Rs.285/ Each
Hectametre Stone 0.75 x 0.23 x 0.10 m at Rs.148/ Each
Guard Stone 1.20 x 0.23 x 0.23 m or 23cm dia 0.90m long at Rs.113/ Each
HIRE & LABOUR CHARGES as on 16.10.2011
Sl. Labour Hire Hire & Labour
Description
No. Charges Charges Charges
1 Earth Work for forming Embankment 3.46 5.94 9.40
2 Granular Sub Base - Grade I &III (Plant Mix) 1657.20 24122.00 25779.20
3 Granular Sub Base - Grade I & III (Place Mix) 1981.44 16704.00 18685.44
Mixing Charges for Sand Gravel mix fo WBM
4 blindage 50.08 ….. 50.08
5 WBM Grade II & III 141.90 85.64 227.54
6 Wet mix Macadam 13.83 298.85 312.68
7 Advance Patch 147.35 ….. 147.35
8 Prime coat over WMM 6 Kg of Emulsion 96.60 15.00 111.60
9 Tack Coat over WMM 2.5 Kg of Emulsion 10.38 15.00 25.38
10 Tack Coat over BM/BT 2.0 Kg of Emulsion 10.38 15.00 25.38
11 Tack Coat over WBM 4 Kg of Emulsion 96.60 15.00 111.60
12 Tack Coat over BT 2.50Kg of Emulsion 10.38 15.00 25.38
13 Tack Coat over WBM using 80/100 118.80 8.01 126.81
14 Tack Coat over BT using 80/100 44.98 4.01 48.99
15 Premix Carpet 129.75 196.66 326.41
16 Premix Carpet with seal Coat 173.00 220.56 393.56
Using CMP, Paver & Vibratory roller
17 Premix Carpet with seal Coat 56.57 440.37 496.94
18 Bituminous Macadam 50 mm thick 94.28 964.20 1058.48
19 Bituminous Macadam 75 mm thick 113.14 1444.30 1557.44
20 Dense Bituminous Macadam 50 mm thick 94.28 966.08 1060.36
21 Dense Bituminous Macadam 75 mm thick 113.14 1448.12 1561.26

22 Semi Dense Bituminous Concrete 25 mm thick 56.57 486.09 542.66


23 Bituminous Concrete 25 mm thick 56.57 483.76 540.33
24 Bituminous Concrete 40 mm thick 94.28 767.31 861.59

Using Mini Hot mix plant & Vibratory roller


Sl. Hire Labour Hire & Labour
Description
No. Charges Charges Charges
1 Bituminous Macadam 50 mm thick 428.95 190.70 619.65
2 Bituminous Macadam 75 mm thick 641.42 228.84 870.26
3 Dense Bituminous Macadam 50 mm thick 422.26 190.70 612.96
4 Dense Bituminous Macadam 75 mm thick 645.24 228.84 874.08
5
Semi Dense Bituminous Concrete 25 mm thick 229.08 173.00 402.08
6 Bituminous Concrete 25 mm thick 229.27 114.42 343.69
7 Bituminous Concrete 40 mm thick 367.54 190.70 558.24
Diesel `. 44.29
Kerosene `. 25.00
Furnace oil `. 42.33
L S Provisions - Director General,Chennai C.M.No.5089/Techcell/2011dated:24.03.2011
Provisions in the Data
Formations and maintaining of protective bunds and coffer dams 6.00 /Cum
Bailing out of water 6.00 /Cum
Refilling sides 9.90 /Cum
Shoring and strutting 6.00 /Cum
Tools and plants 6.00 /Cum
Removal of protective bunds and clearing the sites 2.90 /Cum
For Concrete works
Soft water for concrete 6.00 /Cum
Curing of concrete 6.00 /Cum
Hire charges for tools and plants 6.00 /Cum
Highways
267.00
299.00
385.00
468.00
628.00
628.00
641.00
605.00
605.00
880.00
813.00
553.00
411.00
411.00
411.00
364.00
605.00
553.00
411.00

Above 80 Kms.
2.55
Unloading

Above 80 Kms.
4.05
Unloading
Steel
48000.00
2400.00
50400.00
rk Labour
185.00
193.00
193.00
193.00
175.00
191.00
173.00
155.00
178.00
nternal dia-tks-Outter dia
NP3
450-75-600
600-85-770
700-85-870

900-100-1100
1000-115-1230
1100-115-1330

1200-120-1440
48.00kg

72.00cum

65.00cum

11.30cum

12.80cum

4.60cum

3.70cum

2.30cum

6.90cum

37.70cum

50.10cum

38.85cum

77.45cum

38.30cum

76.85cum

76.85cum

22.80cum
30.65cum
224.00
207.00

189.00

207.00
189.00
224.00
207.00

171.00
224.00
207.00
224.00

207.00

253.00
235.00
Rs.6,097.00

Rs.6,356.00

Rs.2,515.00

Rs.2,900.00
Rs.1,974.00
Rs.2,577.00
Rs.3,513.00
Rs.2,515.00
Rs.2,943.00
Rs.4,425.00

705/Sqm

300/Each

332/Each

906/Each

256/Each

253/Each
720/Each
1661/Each

48/Each

942/Each

4581/Each
Hire & Labour
Charges
/M3
/ 225M 3
/300 M 3
/ M3
/ 10 M 2
/ 10 M 2
/M3
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2

/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2

ller
Hire & Labour
Charges
/ 10 M 2
/ 10 M 2
/ 10 M 2
/ 10 M 2

/ 10 M 2
/ 10 M 2
/ 10 M 2
011
Quarry CMP 10/16/2011
Emulsio
Earth 1 Km 1 Km ### Diesel 44.29
n
Gravel 1 Km 1 Km 60/70 ### Kerosene 25.00
Furnace
Metal 2 Km 1 Km 80/100 ### 42.33
oil
Sand 120 Km ###
With Without
Description Lead Cost Conveyance Stacking
stacking stacking

90 mm IRC 1 Km 267.00 `. 6.40/Cum 3.15 276.55 273.40


75 mm IRC 1 Km 299.00 `. 6.40/Cum 3.15 308.55 305.40
63 mm IRC 1 Km 385.00 `. 6.40/Cum 3.15 394.55 391.40
53 mm IRC 1 Km 468.00 `. 6.40/Cum 3.15 477.55 474.40
46.5 mm IRC 1 Km 628.00 `. 6.40/Cum 3.15 637.55 634.40
45 mm IRC 1 Km 628.00 `. 6.40/Cum 3.15 637.55 634.40
37.5 mm IRC 1 Km 641.00 `. 6.40/Cum 3.15 650.55 647.40
26.5 mm IRC 1 Km 605.00 `. 6.40/Cum 3.15 614.55 611.40
25 mm IRC 1 Km 605.00 `. 6.40/Cum 3.15 614.55 611.40
22.4 mm IRC 1 Km 880.00 `. 6.40/Cum 3.15 889.55 886.40
13.2 mm IRC 1 Km 813.00 `. 6.40/Cum 3.15 822.55 819.40
11.2 mm IRC 1 Km 553.00 `. 6.40/Cum 3.15 562.55 559.40
6.7 mm IRC 1 Km 411.00 `. 6.40/Cum 3.15 420.55 417.40
6 mm IRC 1 Km 411.00 `. 6.40/Cum 3.15 420.55 417.40
5.6 mm IRC 1 Km 411.00 `. 6.40/Cum 3.15 420.55 417.40
4.75 mm & below IRC 1 Km 364.00 `. 6.40/Cum 3.15 373.55 370.40 35.11

25 mm IRC 1 Km 605.00 `. 6.40/Cum 3.15 614.55 611.40 36.03

12 mm IRC 1 Km 553.00 `. 6.40/Cum 3.15 562.55 559.40 1000 0.92

6 mm IRC 1 Km 411.00 `. 6.40/Cum 3.15 420.55 417.40 64

Stone Dust 1 Km 84.00 `. 6.40/Cum 3.15 93.55 90.40 22

Gravel 1 Km 111.00 `. 6.40/Cum 3.05 120.45 117.40


Sand 120 Km 110.00 ### 3.05 637.05 634.00
First Second
Cost Lead Conveyance Stacking Total Lead Conveyance Stacking Total
Cost of Gravel 111.00 1 Km `. 6.40/Cum 3.05 120.45 1 Km `. 6.40/Cum 3.05 120.45
Cost of Quarry Dust 84.00 2 Km `. 12.80/Cum 3.15 99.95 3 Km `. 19.20/Cum 3.15 106.35
90 mm IRC 267.00 2 Km `. 12.80/Cum 3.15 282.95 3 Km `. 19.20/Cum 3.15 289.35
63 mm IRC 385.00 2 Km `. 12.80/Cum 3.15 400.95 3 Km `. 19.20/Cum 3.15 407.35
53mm IRC 468.00 2 Km `. 12.80/Cum 3.15 483.95 3 Km `. 19.20/Cum 3.15 490.35
45mm IRC 628.00 2 Km `. 12.80/Cum 3.15 643.95 3 Km `. 19.20/Cum 3.15 650.35
22.4mm IRC 880.00 2 Km `. 12.80/Cum 3.15 895.95 3 Km `. 19.20/Cum 3.15 902.35
11.2mm IRC 553.00 2 Km `. 12.80/Cum 3.15 568.95 3 Km `. 19.20/Cum 3.15 575.35
13.2mm IRC 813.00 2 Km `. 12.80/Cum 3.15 828.95 3 Km `. 19.20/Cum 3.15 835.35
6.7mm IRC 411.00 2 Km `. 12.80/Cum 3.15 426.95 3 Km `. 19.20/Cum 3.15 433.35
Sand 110.00 120 Km ### 634.00 121 Km `. 527.65/Cum 637.65
Emulsion 44,965.20 372 Km 520.28 MT 45,485.48 373 Km 521.68 MT 45,486.88
80/100 Gr Bitumen 43,129.84 398 Km 789.74 MT 43,919.58 399 Km 791.72 MT 43,921.56
1st 2nd 3rd 4th 5th 1st&2nd

WBM Grade II Gravel 948.41 /Cum 956.95 /Cum 965.48 /Cum 974.01 /Cum 982.55 /Cum 635.12 /Cum

WBM Grade III Gravel 1155.65 /Cum 1164.19 /Cum 1172.72 /Cum 1181.25 /Cum 1189.79 /Cum 773.28 /Cum

WBM Grade II SG mix 971.85 /Cum 981.92 /Cum 991.99 /Cum 1002.05 /Cum 1012.13 /Cum 651.26 /Cum

WBM Grade III SG mix 1179.09 /Cum 1189.16 /Cum 1199.23 /Cum 1209.29 /Cum 1219.37 /Cum 789.42 /Cum

Premix Carpet with seal Coat 170.41 /Sqm 170.64 /Sqm 170.88 /Sqm 171.11 /Sqm 171.35 /Sqm 113.68 /Sqm

Advance Patch 45mm 2723.76 /Cum 2730.25 /Cum 2736.74 /Cum 2743.22 /Cum 2749.71 /Cum 1818.00 /Cum

Advance Patch 13.2mm 2908.76 /Cum 2915.25 /Cum 2921.74 /Cum 2928.22 /Cum 2934.71 /Cum 1941.34 /Cum

Prime coat over WMM 6 Kg of Emulsion 38.45 /Sqm 38.45 /Sqm 38.45 /Sqm 38.45 /Sqm 38.46 /Sqm 25.63 /Sqm

Tack Coat over WMM 2.5 Kg of Emulsion 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 9.27 /Sqm

Tack Coat over BM 2.0 Kg of Emulsion 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 11.64 /Sqm 7.76 /Sqm

Tack Coat over WBM 4 Kg of Emulsion 29.35 /Sqm 29.36 /Sqm 29.36 /Sqm 29.36 /Sqm 29.36 /Sqm 19.57 /Sqm

Tack Coat over BT 2.5 Kg of Emulsion 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 13.91 /Sqm 9.27 /Sqm

WBM,TC,PC&SC

Gravel 1 Km 1 Km 1 Km 1 Km 1 Km

Metal 2 Km 3 Km 4 Km 5 Km 6 Km

Emulsion 372 Km 373 Km 374 Km 375 Km 376 Km

80/100 Gr
398 Km 399 Km 400 Km 401 Km 402 Km
Bitumen

920

9.45
Third Fourth Fifth
Lead Conveyance Stacking Total Lead Conveyance Stacking Total Lead Conveyance
1 Km `. 6.40/Cum 3.05 120.45 1 Km `. 6.40/Cum 3.05 120.45 1 Km `. 6.40/Cum
4 Km `. 25.60/Cum 3.15 112.75 5 Km `. 32.00/Cum 3.15 119.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 295.75 5 Km `. 32.00/Cum 3.15 302.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 413.75 5 Km `. 32.00/Cum 3.15 420.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 496.75 5 Km `. 32.00/Cum 3.15 503.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 656.75 5 Km `. 32.00/Cum 3.15 663.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 908.75 5 Km `. 32.00/Cum 3.15 915.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 581.75 5 Km `. 32.00/Cum 3.15 588.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 841.75 5 Km `. 32.00/Cum 3.15 848.15 6 Km `. 38.40/Cum
4 Km `. 25.60/Cum 3.15 439.75 5 Km `. 32.00/Cum 3.15 446.15 6 Km `. 38.40/Cum
122 Km `. 531.30/Cum 641.30 123 Km `. 534.95/Cum 644.95 124 Km `. 538.60/Cum
374 Km 523.08 MT 45,488.28 375 Km 524.48 MT 45,489.68 376 Km 525.88 MT
400 Km 793.71 MT 43,923.55 401 Km 795.69 MT 43,925.53 402 Km 797.68 MT
1st to 3rd 1st to 4th 1st to 5th

956.95 /Cum 961.21 /Cum 965.48 /Cum

### 1168.45 /Cum 1172.72 /Cum

981.92 /Cum 986.95 /Cum 991.99 /Cum

### 1194.19 /Cum 1199.23 /Cum

170.64 /Sqm 170.76 /Sqm 170.88 /Sqm

### 2733.49 /Cum 2736.74 /Cum

### 2918.49 /Cum 2921.74 /Cum

38.45 /Sqm 38.45 /Sqm 38.45 /Sqm

13.91 /Sqm 13.91 /Sqm 13.91 /Sqm

11.64 /Sqm 11.64 /Sqm 11.64 /Sqm

29.36 /Sqm 29.36 /Sqm 29.36 /Sqm

13.91 /Sqm 13.91 /Sqm 13.91 /Sqm


Fifth
Stacking Total
3.05 120.45
3.15 125.55
3.15 308.55
3.15 426.55
3.15 509.55
3.15 669.55
3.15 921.55
3.15 594.55
3.15 854.55
3.15 452.55
648.60
45,491.08
43,927.52
Cost of stone dust 0.02838cum `. 84.00/Cum `2.38 Picking 5cm to 10cm old metalled surface and sectioning - 1Sqm
2 KM conveyance charges 2 Km 0.02838cum `. 12.80/Cum `0.36
Mazdoor Class-I 1.08 x 1/4
(1.08×1/4)
Hire Charges for machinery 1.00cum `. 6.40/Cum `6.40 Rate per 10 sqm
Labour Charges Rate per sqm
`9.14 Laying well gravel / U.S.gravel for 100cum
`. 322.06/Cum Mazdoor Class-I 2.00 Nos.
For 97% Compaction For 100 % Compaction Rate per 100 Cum
Hire Charges for machinery 1.00 Cum `. 5.11/Cum 1.00 Cum `. 5.94/Cum Rate per cum
Labour Charges 1.00 Cum `. 3.46/Cum 1.00 Cum `. 3.46/Cum
`. 8.57/Cum `. 9.40/Cum

For 97% Compaction For 100 % Compaction


Extra Earth requirted
Total Qty of earth required in
Reach in km Proctor Density Field Density in Cum Reach in km Proctor Density
Cum
(( 0.95xPd)-Fd)/Fd
(0.95 x 1.82)-1.6)/1.6 =
1.82 1.60 1.08 1.82
0.08

Earth work SS 20 B as per SI No Earth work SS 20 B


1.08 Cum `. 36.40/Cum `39.31
62 as per SI No 62
1 KM conveyance
1 KM conveyance charges 1 Km 1.08 Cum `. 6.40/Cum `6.91 1 Km
charges
Labour Charges For
Labour Charges For Spreading 1.00 Cum `. 3.46/Cum `3.46
Spreading
Hire Charges for
Hire Charges for machinery 1.00 Cum `. 5.11/Cum `5.11
machinery
Sundries LS Sundries
Total `. 54.79/Cum Total

For 97% Compaction For 100 % Compaction


Extra Earth requirted
Total Qty of earth required in
Reach in km Proctor Density Field Density in Cum Reach in km Proctor Density
Cum
(( 0.95xPd)-Fd)/Fd
(0.95 x 1.72)-
1.72 1.44 1.13 1.72
1.44)/1.44 = 0.13

Cost of Gravel 1.13 Cum `. 111.00/Cum `125.43 Cost of Gravel


1 KM conveyance
1 KM conveyance charges 1 Km 1.13 Cum `. 6.40/Cum `7.23 1 Km
charges
Hire Charges for
Hire Charges for machinery 1.00 Cum `. 8.57/Cum `8.57
machinery
Sundries 1.00 Cum `0.00 Sundries
Total `. 141.23/Cum Total

FORMING EMBANKMENT by cutting the EARTH WORK EXCAVATION AND COMPACTION BY POWER ROLLER - By cutting
Earth work SS 20 B as per SI No
`. 36.40/Cum
62
FORMING EMBANKMENT Using cut earth with an average lead of 1Km AND COMPACTION BY POWER ROLLER - Using cut earth with an average lead of 1Km (labour and machinery charges only)
For 97% Compaction For 100 % Compaction
Labour Charges For Spreading 1.00 Cum `. 3.46/Cum `3.46 1.00 Cum `. 3.46/Cum `3.46
Hire Charges for machinery 1.00 Cum `. 5.11/Cum `5.11 1.00 Cum `. 5.94/Cum `5.94
Total `. 8.57/Cum `. 9.40/Cum

Granular sub - base with close graded material [Table - 400-1]-401 PLANT MIX METHOD MIX IN PLACE METHO
53 mm to 22.4 mm
Cost of 53.00 mm to 22.40 mm metal broken stone 144.00 Cum `. 642.83/Cum `92,567.52 192.00 Cum
(50%)
22.4 mm to 4.75
53 mm IRC `.474.40/Cum mm of Gravel 57.00 Cum `. 117.40/Cum `6,691.80 76.00 Cum
(20%)
4.75 mm below of
46.5 mm IRC `.634.40/Cum 86.40 Cum `. 634.00/Cum `54,777.60 115.20 Cum
sand (30%)
45 mm IRC `.634.40/Cum Water 27.00 KL `. 120.00/Cum `3,240.00 18.00 KL
Hire and Labour
37.5 mm IRC `.647.40/Cum 225.00 Cum `. 25,779.20/Cum `25,779.20 300.00 Cum
Charges

26.5 mm IRC `.611.40/Cum Cost for 300Cum = `183,056.12 Cost for 300Cum =

25 mm IRC `.611.40/Cum Cost for 1 Cum = `813.58 Cost for 1 Cum =


22.4 mm IRC `.886.40/Cum
`. 642.83/Cum
22.4 mm to 4.75 mm of Gravel
`. 117.40/Cum 144 `. 649.23/Cum `93,489.12
(20%)
4.75 mm below of sand (30%) `. 634.00/Cum
Sand Gravel Mix for Blindage
Description Quantity Rate Amount
Cost of Gravel 0.57 Cum `. 120.45/Cum `. 68.66
Cost of Quarry Dust 0.75 Cum `. 93.55/Cum `. 70.16
Mixing Charges 10.00sqm `. 50.08/10Sqm `. 50.08
Rate per 1 Cum `. 188.90

WBM - Grade II metal WBM - Grade III metal


Description Qty Rate Amount Total Description Qty
90 mm IRC 0.050 Cum `.282.95/Cum `. 14.15 63 mm IRC 0.025 Cum
63 mm IRC 0.450 Cum `.400.95/Cum `. 180.43 53mm IRC 0.200 Cum
53mm IRC 0.425 Cum `.483.95/Cum `. 205.68 `. 454.86 45mm IRC 0.725 Cum
45mm IRC 0.050 Cum `.643.95/Cum `. 32.20 22.4mm IRC 0.025 Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 11.2mm IRC 0.025 Cum
Cost of SG Mix for
Cost of SG Mix for Blindage 0.240 Cum `.188.90/Cum `. 45.34 `. 45.34 0.240 Cum
Blindage
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 Hire and Labour charges 10.00 Sqm
Rate per 10Sqm of
Rate per 10Sqm of 750mm thick `. 727.74 `. 727.74
750mm thick
Rate per 1Cum `. 970.32/Cum `. 970.32/Cum Rate per 1Cum
WBM - Grade II metal WBM - Grade III metal
Description Qty Rate Amount Total Description Qty
90 mm IRC 0.050 Cum `.282.95/Cum `. 14.15 63 mm IRC 0.025 Cum
63 mm IRC 0.450 Cum `.400.95/Cum `. 180.43 53mm IRC 0.200 Cum
53mm IRC 0.425 Cum `.483.95/Cum `. 205.68 `. 454.86 45mm IRC 0.725 Cum
45mm IRC 0.050 Cum `.643.95/Cum `. 32.20 22.4mm IRC 0.025 Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 11.2mm IRC 0.025 Cum
Cost of Gravel 0.240 Cum `.120.45/Cum `. 28.91 `. 28.91 Cost of Gravel 0.240 Cum
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 Hire and Labour charges 10.00 Sqm
Rate per 10Sqm of
Rate per 10Sqm of 750mm thick `. 711.31 `. 711.31
750mm thick
Rate per 1Cum `. 948.41/Cum `. 948.41/Cum Rate per 1Cum
PRIME COAT OVER TACK COAT OVER
WMM SURFACE USING 6 KG OF BITUMEN EMULSION WMM SURFACE USING 2.5 KG OF BITUMEN EMULSION
Cost of Bitumen Emulsion 0.006 MT `. 45,485.48/MT `272.91 0.003 MT `. 45,485.48/MT `113.71
Labour charges 10.00 Sqm `. 96.60/10Sqm `96.60 10.00 Sqm `. 10.38/10Sqm `10.38

Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 10.00 Sqm `. 15.00/10Sqm `15.00

Rate per 10 sqm `. 384.51/10Sqm `. 139.09/10Sqm


Rate per sqm `. 38.45/Sqm `. 13.91/Sqm
TACK COAT OVER
BM SURFACE using 2.0 KG of Bitumen Emulsion WBM SURFACE using 4.0 KG of Bitumen Emulsion
Cost of bitumen Emulsion 0.0020 MT `. 45,485.48/MT `90.97 0.004 MT `. 45,485.48/MT `181.94
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 10.00 Sqm `. 96.60/10Sqm `96.60
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 10.00 Sqm `. 15.00/10Sqm `15.00

Rate per 10 sqm `. 116.35/10Sqm `. 293.54/10Sqm


Rate per sqm `. 11.64/Sqm `. 29.35/Sqm
Premix Carpet with seal Coat
Description Qty Rate Amount
Cost of 13.2 mm metal 0.180 Cum `. 822.55/Cum `148.06
Cost of 11.2 mm metal 0.090 Cum `. 562.55/Cum `50.63
Cost of 6.7 mm metal 0.090 Cum `. 420.55/Cum `37.85
Cost of 80/100 grade bitumen 24.40 Kg `. 43,919.58/MT `1,071.64
Hire and labour charges 10.00 /10Sqm `. 393.56/10Sqm `393.56
Rate per 10 Sqm `. 1,701.74/10Sqm
Rate per Sqm `. 170.17/Sqm
Advance patch work
45mm IRC metal 13.20mm IRC metal
Description Qty Rate Amount Description Qty Rate
45 mm IRC metal 1.00 Cum `. 637.55/Cum `. 637.55 13.20mm IRC metal 1.00 Cum `. 822.55/Cum
Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT `. 1,932.46 Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT
Labour Charges 1.00 Cum `. 147.35/Cum `. 147.35 Labour Charges 1.00 Cum `. 147.35/Cum
Rate for 1.00 cu.m `. 2,717.36/Cum Rate for 1.00 cu.m
WET MIX MACADAM WET MIX MACADAM
cost of 45mm - 22.4 mm cost of 22.4mm - 2.36mm cost of 45mm - 22.4 mm 0.396 Cum `. 678.20/Cum
45mm `. 634.40/Cum 22.4mm `. 886.40/Cum cost of 22.4mm - 2.36mm 0.528 Cum `. 555.40/Cum
37.5mm `. 647.40/Cum 13.2mm `. 819.40/Cum cost of 2.36 mm & below 0.396 Cum `. 370.40/Cum
Labour charges & Hire
26.5mm `. 611.40/Cum 11.2mm `. 559.40/Cum 1.000 Cum `. 312.68/Cum
charges for machineries
25mm `. 611.40/Cum 6.7mm `. 417.40/Cum Rate per 1cum
22.4mm `. 886.40/Cum 6mm `. 417.40/Cum
`. 678.20/Cum 5.6mm `. 417.40/Cum cost of 45mm - 22.4 mm 89.10cum `. 678.20/Cum
4.75mm `. 370.40/Cum cost of 22.4mm - 2.36mm 118.80cum `. 555.40/Cum
`. 555.40/Cum cost of 2.36 mm & below 89.10cum `. 370.40/Cum
cost of 2.36 mm & below Labour charges & Hire 225.00cum `. 29,885.02/225Cum
4.75mm `. 370.40/Cum charges for machineries 225.00cum `. 1,382.82/225Cum
Rate per 225cum
Rate per 1cum

Dense Bituminous Macadam 75 mm thick Rate for one Cum of Dense Bituminous Macadam 75 mm thick
37.50 - 13.2 mm Metal Cost of 37.5 mm - 13.20 mm 0.35 Cum `. 746.15/Cum
Cost of 26.5mm metal 0.51 Cum `. 611.40/Cum `311.81 Cost of 13.20mm - 2.36 mm 0.45 Cum `. 399.07/Cum
Cost of 22.4mm metal 0.49 Cum `. 886.40/Cum `434.34 Cost of 2.36 mm and below 0.20 Cum `. 370.40/Cum
`746.15 Cost of quarry dust 0.02 Cum `. 90.40/Cum
13.2 - 2.36 mm Metal Cost of (60/70) Bitumen 74.25 Kg `. 44,918.94/MT
Cost of 11.2mm metal 0.61 Cum `. 417.40/Cum `254.61 Hire & Labour Charges 10.00 Sqm `. 1,561.26/10Sqm
Cost of 2.36mm metal 0.39 Cum `. 370.40/Cum `144.46 Rate for 10 sqm of 75 mm thick =
`399.07 Rate per M3
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40

Quarry dust `90.40

Dense Bituminous Macadam 50 mm thick Rate for one Cum of Dense Bituminous Macadam 50 mm thick
26.5 - 13.2 mm Metal Cost of 26.5 mm - 13.20 mm 0.35 Cum `. 886.40/Cum
Cost of 22.4mm metal 1.00 Cum `. 886.40/Cum `886.40 Cost of 13.20mm - 2.36 mm 0.21 Cum `. 402.83/Cum
Cost of 2.36 mm and below 0.14 Cum `. 370.40/Cum
13.2 - 2.36 mm Metal Cost of (60/70) Bitumen 49.50 Kg `. 44,918.94/MT
Cost of 11.2mm metal 0.69 Cum `. 417.40/Cum `288.01 Hire & Labour Charges 10.00 Sqm `. 1,060.36/10Sqm
Cost of 2.36mm metal 0.31 Cum `. 370.40/Cum `114.82 Rate for 10 sqm of 50 mm thick =
`402.83 Rate per M3
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40
Bituminous Macadam 75 mm thick Rate for one Cum of Bituminous Macadam 75 mm thick
45 - 22.4 mm Metal Cost of 45 mm - 22.40 mm 0.63 Cum `. 740.65/Cum
26.5mm metal 0.53 Cum `. 611.40/Cum `324.04 Cost of 11.20mm - 2.8 mm 0.25 Cum `. 399.07/Cum
22.4mm metal 0.47 Cum `. 886.40/Cum `416.61 Cost of 22.4 mm - 11.2 mm 0.16 Cum `. 819.40/Cum
`740.65 Cost of (60/70) Bitumen 58.00 Kg `. 44,918.94/MT
11.2 - 2.8 mm Metal Hire & Labour Charges 10.00 Sqm `. 1,557.44/10Sqm
Cost of 6.7mm metal 0.61 Cum `. 417.40/Cum `254.61 Rate for 10 sqm of 75 mm thick =
Cost of 2.8mm metal 0.39 Cum `. 370.40/Cum `144.46 Rate per M3
`399.07
22.4 - 11.2 mm & metal
Cost of 13.2mm metal 1.00 Cum `. 819.40/Cum `819.40

Bituminous Macadam 50 mm thick Rate for one Cum of Bituminous Macadam 50 mm thick
26.5 - 11.2 mm Metal Cost of 26.5 mm - 11.20 mm 0.42 Cum `. 854.91/Cum
Cost of 22.4mm metal 0.53 Cum `. 886.40/Cum `469.79 Cost of 11.20mm - 2.8 mm 0.10 Cum `. 402.83/Cum
Cost of 13.2mm metal 0.47 Cum `. 819.40/Cum `385.12 Cost of 2.8 mm and below 0.18 Cum `. 370.40/Cum
`854.91 Cost of (60/70) Bitumen 38.00 Kg `. 44,918.94/MT
11.2 - 2.8 mm Metal Hire & Labour Charges 10.00 Sqm `. 1,058.48/10Sqm
Cost of 6.7mm metal 0.69 Cum `. 417.40/Cum `288.01 Rate for 10 sqm of 50 mm thick =
Cost of 2.8 mm Metal 0.31 Cum `. 370.40/Cum `114.82 Rate per M3
`402.83
2.8 mm and below Metal
Cost of 2.8 mm Metal 1.00 Cum `. 370.40/Cum `370.40

Rate for one Sqm of SEMI DENSE BITUMINOUS CONCRETE 25 MM THICK


Cost of 11.2 mm metal 0.10 Cum `. 559.40/Cum `55.94
Cost of 6.7 mm metal 0.16 Cum `. 417.40/Cum `66.78
Cost of 2.8 mm metal 0.11 Cum `. 370.40/Cum `40.74
Cost of (60/70) Bitumen 28.00 Kg `. 44,918.94/MT `1,257.73
Hire & Labour Charges 10.00 Sqm `. 542.66/10Sqm `542.66
Rate for 10 sqm of 25 mm thick = `. 1,963.85/10Sqm
Rate per Sqm of 25 mm thick = `. 196.39/Sqm
Rate per Cum `. 7,855.40/Cum
Bituminous concrete 40 mm thick Rate for one Cum of Bituminous concrete 40 mm thick
26.5 - 9.5 mm Metal Cost of 26.5 mm - 9.5 mm 0.40 Cum `. 853.57/Cum
Cost of 22.4mm metal 0.51 Cum `. 886.40/Cum `452.06 Cost of 9.5mm - 2.36 mm 0.22 Cum `. 397.66/Cum
Cost of 13.2mm metal 0.49 Cum `. 819.40/Cum `401.51 Cost of Quarry dust 0.01 Cum `. 90.40/Cum
`853.57 Cost of (60/70) Bitumen 44.00 Kg `. 44,918.94/MT
9.5 - 2.36mm Metal Hire & Labour Charges 10.00 Sqm `. 861.59/10Sqm
Cost of 6.7mm metal 0.58 Cum `. 417.40/Cum `242.09 Rate for 10 sqm of 40 mm thick =
Cost of 2.8 mm Metal 0.42 Cum `. 370.40/Cum `155.57 Rate per M3
`397.66

Quarry dust `90.40


e and sectioning - 1Sqm
173.00 /Each 46.71

46.71 /10Sqm
4.67 /Sqm

173.00 /Each 346.00


346.00
3.46 /Cum

For 100 % Compaction


Extra Earth requirted in
Total Qty of earth
Field Density Cum
required in Cum
(Pd-Fd)/Fd
(0.97 x 1.82)-1.6)/1.6 =
1.60 1.10
0.1

1.10 Cum `. 36.40/Cum `40.04

1.10 Cum `. 6.40/Cum `7.04

1.00 Cum `. 3.46/Cum `3.46

1.00 Cum `. 5.94/Cum `5.94

LS
`. 56.48/Cum

For 100 % Compaction


Extra Earth requirted in
Total Qty of earth
Field Density Cum
required in Cum
(Pd-Fd)/Fd
(0.97 x 1.72)-
1.44 1.16
1.44)/1.44 = 0.13

1.16 Cum `. 111.00/Cum `128.76


1.16 Cum `. 6.40/Cum `7.42
1.00 Cum `. 9.40/Cum `9.40

LS
`. 145.58/Cum
achinery charges only)

MIX IN PLACE METHOD

`. 645.98/Cum `124,028.16

`. 120.45/Cum `9,154.20

`. 637.05/Cum `73,388.16

`. 120.00/Cum `2,160.00

`. 18,685.44/Cum `18,685.44

`227,415.96

`. 758.05/Cum

Rate Amount Total


`.400.95/Cum `. 10.02
`.483.95/Cum `. 96.79
`.643.95/Cum `. 466.86 `. 610.29
`.895.95/Cum `. 22.40
`.568.95/Cum `. 14.22
`.188.90/Cum `. 45.34 `. 45.34

`. 227.54/10Sqm `. 227.54 `. 227.54

`. 883.17 `. 883.17

`. 1,177.56/Cum `. 1,177.56/Cum
Rate Amount Total
`.400.95/Cum `. 10.02
`.483.95/Cum `. 96.79
`.643.95/Cum `. 466.86 `. 610.29
`.895.95/Cum `. 22.40
`.568.95/Cum `. 14.22
`.120.45/Cum `. 28.91 `. 28.91
`. 227.54/10Sqm `. 227.54 `. 227.54

`. 866.74 `. 866.74

`. 1,155.65/Cum `. 1,155.65/Cum

BT SURFACE using 2.5 KG of Bitumen Emulsion


0.0025 MT `. 45,485.48/MT `113.71
10.00 Sqm `. 10.38/10Sqm `10.38
10.00 Sqm `. 15.00/10Sqm `15.00

`. 139.09/10Sqm
`. 13.91/Sqm

tal
Amount
`. 822.55
`. 1,932.46
`. 147.35
`. 2,902.36/Cum
`. 268.57
`. 293.25
`. 146.68

`. 312.68

`. 1,021.18

`. 60,427.62
`. 65,981.52
`. 33,002.64
`67,241.30
`3,111.35
`229,764.43
`. 1,021.18

`261.15
`179.58
`74.08
`1.81
`3,335.23
`1,561.26
`5,413.11
`. 7,217.48/Cum

`310.24
`84.59
`51.86
`2,223.49
`1,060.36
`3,730.54
`. 7,461.08/Cum
`466.61
`99.77
`131.10
`2,605.30
`1,557.44
`4,860.22
`. 6,480.29/Cum

`359.06
`40.28
`66.67
`1,706.92
`1,058.48
`3,231.41
`. 6,462.82/Cum

`341.43
`87.49
`0.90
`1,976.43
`861.59
`3,267.84
`. 8,169.60/Cum
As on 10/16/2011
Description Emulsion 60/70 80/100
Basic Price 34,560.00 35,265.00 34,465.00
Detuct drum cost 1,500.00 0.00 0.00
Sub total 33,060.00 35,265.00 34,465.00
Excise Duty @ 14.00% 4,628.40 4,937.10 4,825.10
Education Cess ON ED
2.00% 92.57 98.74 96.50
@
Higher secondary
Education Cess ON ED 1.00% 46.28 49.37 48.25
@
Billable Price 37,827.25 40,350.21 39,434.85
VAT @ 14.50% 5.00% 5,484.95 2,017.51 1,971.74
Total invoice value 43,312.20 42,367.72 41,406.59
Storage Charges on
5.00% 1,653.00 1,763.25 1,723.25
basic price @
Sub total 44,965.20 44,130.97 43,129.84
397.892 Km x
371.632 Km x 1.40 397 Km x 0.9924 x
Conveyance 0.9924 x 2 =
x 1 = 520.28 2 = 787.97
789.74
45,485.48 44,918.94 43,919.58
Sand Gravel Mix for Blindage
First Second
Description Quantity
Rate Amount Rate Amount
Cost of Gravel 0.57 Cum `. 120.45/Cum Rs.68.66 `. 120.45/Cum Rs.68.66
Cost of Quarry Dust 0.75 Cum `. 99.95/Cum Rs.74.96 `. 106.35/Cum Rs.79.76
Mixing Charges 10.00sqm `. 50.08/10Sqm Rs.50.08 `. 50.08/10Sqm Rs.50.08
Rate per 1 Cum Rs.193.70 Rs.198.50

WBM - Grade II metal First


Description Qty Rate Amount Total Rate
90 mm IRC 0.050 Cum `.282.95/Cum `. 14.15 `.289.35/Cum
63 mm IRC 0.450 Cum `.400.95/Cum `. 180.43 `.407.35/Cum
53mm IRC 0.425 Cum `.483.95/Cum `. 205.68 `. 454.86 `.490.35/Cum
45mm IRC 0.050 Cum `.643.95/Cum `. 32.20 `.650.35/Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 `.902.35/Cum
Cost of SG Mix for Blindage 0.240 Cum `.193.70/Cum `. 46.49 `. 46.49 `.198.50/Cum
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
Rate per 10Sqm of 750mm thick `. 728.89 `. 728.89
Rate per 1Cum `. 971.85/Cum `. 971.85/Cum

WBM - Grade III metal First


Description Qty Rate Amount Total Rate
63 mm IRC 0.025 Cum `.400.95/Cum `. 10.02 `.407.35/Cum
53mm IRC 0.200 Cum `.483.95/Cum `. 96.79 `.490.35/Cum
45mm IRC 0.725 Cum `.643.95/Cum `. 466.86 `. 610.29 `.650.35/Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 `.902.35/Cum
11.2mm IRC 0.025 Cum `.568.95/Cum `. 14.22 `.575.35/Cum
Cost of SG Mix for Blindage 0.240 Cum `.193.70/Cum `. 46.49 `. 46.49 `.198.50/Cum
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
Rate per 10Sqm of 750mm thick `. 884.32 `. 884.32
Rate per 1Cum `. 1,179.09/Cum `. 1,179.09/Cum

WBM - Grade II metal First


Description Qty Rate Amount Total Rate
90 mm IRC 0.050 Cum `.282.95/Cum `. 14.15 `.289.35/Cum
63 mm IRC 0.450 Cum `.400.95/Cum `. 180.43 `.407.35/Cum
53mm IRC 0.425 Cum `.483.95/Cum `. 205.68 `. 454.86 `.490.35/Cum
45mm IRC 0.050 Cum `.643.95/Cum `. 32.20 `.650.35/Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 `.902.35/Cum
Cost of Gravel 0.240 Cum `.120.45/Cum `. 28.91 `. 28.91 `.120.45/Cum
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
Rate per 10Sqm of 750mm thick `. 711.31 `. 711.31
Rate per 1Cum `. 948.41/Cum `. 948.41/Cum

WBM - Grade III metal First


Description Qty Rate Amount Total Rate
63 mm IRC 0.025 Cum `.400.95/Cum `. 10.02 `.407.35/Cum
53mm IRC 0.200 Cum `.483.95/Cum `. 96.79 `.490.35/Cum
45mm IRC 0.725 Cum `.643.95/Cum `. 466.86 `. 610.29 `.650.35/Cum
22.4mm IRC 0.025 Cum `.895.95/Cum `. 22.40 `.902.35/Cum
11.2mm IRC 0.025 Cum `.568.95/Cum `. 14.22 `.575.35/Cum
Cost of Gravel 0.240 Cum `.120.45/Cum `. 28.91 `. 28.91 `.120.45/Cum
Hire and Labour charges 10.00 Sqm `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
Rate per 10Sqm of 750mm thick `. 866.74 `. 866.74
Rate per 1Cum `. 1,155.65/Cum `. 1,155.65/Cum

PRIME COAT OVER WMM SURFACE USING 6 KG OF BITUMEN EMULSION

First Second
Cost of Bitumen Emulsion 0.006 MT `. 45,485.48/MT `272.91 `. 45,486.88/MT `272.92
Labour charges 10.00 Sqm `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 384.51/10Sqm `. 384.52/10Sqm
Rate per sqm `. 38.45/Sqm `. 38.45/Sqm
TACK COAT OVER WMM SURFACE USING 2.5 KG OF BITUMEN EMULSION

First Second
Cost of Bitumen Emulsion 0.0025 MT `. 45,485.48/MT `113.71 `. 45,486.88/MT `113.72
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 139.09/10Sqm `. 139.10/10Sqm
Rate per sqm `. 13.91/Sqm `. 13.91/Sqm
TACK COAT OVER BM SURFACE using 2.0 KG of Bitumen Emulsion

First Second
Cost of bitumen Emulsion 0.0020 MT `. 45,485.48/MT `90.97 `. 45,486.88/MT `90.97
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 116.35/10Sqm `. 116.35/10Sqm
Rate per sqm `. 11.64/Sqm `. 11.64/Sqm
TACK COAT OVER WBM SURFACE using 4.0 KG of Bitumen Emulsion

First Second
Cost of bitumen Emulsion 0.004 MT `. 45,485.48/MT `181.94 `. 45,486.88/MT `181.95
Labour charges 10.00 Sqm `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 293.54/10Sqm `. 293.55/10Sqm
Rate per sqm `. 29.35/Sqm `. 29.36/Sqm
TACK COAT OVER BT SURFACE using 2.5 KG of Bitumen Emulsion
First Second
Cost of bitumen Emulsion 0.0025 MT `. 45,485.48/MT `113.71 `. 45,486.88/MT `113.72
Labour charges 10.00 Sqm `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
Hire charges for Bitumen sprayer 10.00 Sqm `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
Rate per 10 sqm `. 139.09/10Sqm `. 139.10/10Sqm
Rate per sqm `. 13.91/Sqm `. 13.91/Sqm

Advance patch work using 45mm IRC metal over the existing BT surface using 44Kg of bitumen of grade 80/100 per cum

First Second
Description Qty Rate Amount Rate Amount
45 mm IRC metal 1.00 Cum `. 643.95/Cum `. 643.95 `. 650.35/Cum `. 650.35
Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT `. 1,932.46 `. 43,921.56/MT `. 1,932.55
Labour Charges 1.00 Cum `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
Rate for 1.00 cu.m `. 2,723.76/Cum `. 2,730.25/Cum
Advance patch work using 13.20mm IRC metal over the existing BT surface using 44Kg of bitumen of grade 80/100 per cum
First Second
Description Qty Rate Amount Rate Amount
13.20mm IRC metal 1.00 Cum `. 828.95/Cum `. 828.95 `. 835.35/Cum `. 835.35
Bitumen 80/100 grade 44.00 Kg `. 43,919.58/MT `. 1,932.46 `. 43,921.56/MT `. 1,932.55
Labour Charges 1.00 Cum `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
Rate for 1.00 cu.m `. 2,908.76/Cum `. 2,915.25/Cum

Premix Carpet with seal Coat


First Second
Description Qty
Rate Amount Rate Amount
Cost of 13.2 mm metal 0.180 Cum `. 828.95/Cum `. 149.21 `. 835.35/Cum `. 150.36
Cost of 11.2 mm metal 0.090 Cum `. 568.95/Cum `. 51.21 `. 575.35/Cum `. 51.78
Cost of 6.7 mm metal 0.090 Cum `. 426.95/Cum `. 38.43 `. 433.35/Cum `. 39.00
Cost of 80/100 grade bitumen 24.40 Kg `. 43,919.58/MT `. 1,071.64 `. 43,921.56/MT `. 1,071.69
Hire and labour charges ### `. 393.56/10Sqm `393.56 `. 393.56/10Sqm `393.56
Rate per 10 Sqm `. 1,704.05/10Sqm Rate per 10 Sqm `. 1,706.39/10Sqm
Rate per Sqm `. 170.41/Sqm Rate per Sqm `. 170.64/Sqm
Third Fourth Fifth
Rate Amount Rate Amount Rate Amount
`. 120.45/Cum Rs.68.66 `. 120.45/Cum Rs.68.66 `. 120.45/Cum Rs.68.66
`. 112.75/Cum Rs.84.56 `. 119.15/Cum Rs.89.36 `. 125.55/Cum Rs.94.16
`. 50.08/10Sqm Rs.50.08 `. 50.08/10Sqm Rs.50.08 `. 50.08/10Sqm Rs.50.08
Rs.203.30 Rs.208.10 Rs.212.90

Second Third Fourt


Amount Total Rate Amount Total Rate
`. 14.47 `.295.75/Cum `. 14.79 `.302.15/Cum
`. 183.31 `.413.75/Cum `. 186.19 `.420.15/Cum
`. 208.40 `. 461.26 `.496.75/Cum `. 211.12 `. 467.66 `.503.15/Cum
`. 32.52 `.656.75/Cum `. 32.84 `.663.15/Cum
`. 22.56 `.908.75/Cum `. 22.72 `.915.15/Cum
`. 47.64 `. 47.64 `.203.30/Cum `. 48.79 `. 48.79 `.208.10/Cum
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
`. 736.44 `. 736.44 `. 743.99 `. 743.99
`. 981.92/Cum `. 981.92/Cum `. 991.99/Cum `. 991.99/Cum

Second Third Fourt


Amount Total Rate Amount Total Rate
`. 10.18 `.413.75/Cum `. 10.34 `.420.15/Cum
`. 98.07 `.496.75/Cum `. 99.35 `.503.15/Cum
`. 471.50 `. 616.69 `.656.75/Cum `. 476.14 `. 623.09 `.663.15/Cum
`. 22.56 `.908.75/Cum `. 22.72 `.915.15/Cum
`. 14.38 `.581.75/Cum `. 14.54 `.588.15/Cum
`. 47.64 `. 47.64 `.203.30/Cum `. 48.79 `. 48.79 `.208.10/Cum
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
`. 891.87 `. 891.87 `. 899.42 `. 899.42
`. 1,189.16/Cum `. 1,189.16/Cum `. 1,199.23/Cum `. 1,199.23/Cum

Second Third Fourt


Amount Total Rate Amount Total Rate
`. 14.47 `.295.75/Cum `. 14.79 `.302.15/Cum
`. 183.31 `.413.75/Cum `. 186.19 `.420.15/Cum
`. 208.40 `. 461.26 `.496.75/Cum `. 211.12 `. 467.66 `.503.15/Cum
`. 32.52 `.656.75/Cum `. 32.84 `.663.15/Cum
`. 22.56 `.908.75/Cum `. 22.72 `.915.15/Cum
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91 `.120.45/Cum
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
`. 717.71 `. 717.71 `. 724.11 `. 724.11
`. 956.95/Cum `. 956.95/Cum `. 965.48/Cum `. 965.48/Cum

Second Third Fourt


Amount Total Rate Amount Total Rate
`. 10.18 `.413.75/Cum `. 10.34 `.420.15/Cum
`. 98.07 `.496.75/Cum `. 99.35 `.503.15/Cum
`. 471.50 `. 616.69 `.656.75/Cum `. 476.14 `. 623.09 `.663.15/Cum
`. 22.56 `.908.75/Cum `. 22.72 `.915.15/Cum
`. 14.38 `.581.75/Cum `. 14.54 `.588.15/Cum
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91 `.120.45/Cum
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54 `. 227.54/10Sqm
`. 873.14 `. 873.14 `. 879.54 `. 879.54
`. 1,164.19/Cum `. 1,164.19/Cum `. 1,172.72/Cum `. 1,172.72/Cum

Third Fourth Fifth


`. 45,488.28/MT `272.93 `. 45,489.68/MT `272.94 `. 45,491.08/MT `272.95
`. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
`. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
`. 384.53/10Sqm `. 384.54/10Sqm `. 384.55/10Sqm
`. 38.45/Sqm `. 38.45/Sqm `. 38.46/Sqm

Third Fourth Fifth


`. 45,488.28/MT `113.72 `. 45,489.68/MT `113.72 `. 45,491.08/MT `113.73
`. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
`. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
`. 139.10/10Sqm `. 139.10/10Sqm `. 139.11/10Sqm
`. 13.91/Sqm `. 13.91/Sqm `. 13.91/Sqm

Third Fourth Fifth


`. 45,488.28/MT `90.98 `. 45,489.68/MT `90.98 `. 45,491.08/MT `90.98
`. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
`. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
`. 116.36/10Sqm `. 116.36/10Sqm `. 116.36/10Sqm
`. 11.64/Sqm `. 11.64/Sqm `. 11.64/Sqm

Third Fourth Fifth


`. 45,488.28/MT `181.95 `. 45,489.68/MT `181.96 `. 45,491.08/MT `181.96
`. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60 `. 96.60/10Sqm `96.60
`. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
`. 293.55/10Sqm `. 293.56/10Sqm `. 293.56/10Sqm
`. 29.36/Sqm `. 29.36/Sqm `. 29.36/Sqm
Third Fourth Fifth
`. 45,488.28/MT `113.72 `. 45,489.68/MT `113.72 `. 45,491.08/MT `113.73
`. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38 `. 10.38/10Sqm `10.38
`. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00 `. 15.00/10Sqm `15.00
`. 139.10/10Sqm `. 139.10/10Sqm `. 139.11/10Sqm
`. 13.91/Sqm `. 13.91/Sqm `. 13.91/Sqm

Third Fourth Fifth


Rate Amount Rate Amount Rate Amount
`. 656.75/Cum `. 656.75 `. 663.15/Cum `. 663.15 `. 669.55/Cum `. 669.55
`. 43,923.55/MT `. 1,932.64 `. 43,925.53/MT `. 1,932.72 `. 43,927.52/MT `. 1,932.81
`. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
`. 2,736.74/Cum `. 2,743.22/Cum `. 2,749.71/Cum
0 per cum
Third Fourth Fifth
Rate Amount Rate Amount Rate Amount
`. 841.75/Cum `. 841.75 `. 848.15/Cum `. 848.15 `. 854.55/Cum `. 854.55
`. 43,923.55/MT `. 1,932.64 `. 43,925.53/MT `. 1,932.72 `. 43,927.52/MT `. 1,932.81
`. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35 `. 147.35/Cum `. 147.35
`. 2,921.74/Cum `. 2,928.22/Cum `. 2,934.71/Cum

Third Fourth Fifth


Rate Amount Rate Amount Rate Amount
`. 841.75/Cum `. 151.52 `. 848.15/Cum `. 152.67 `. 854.55/Cum `. 153.82
`. 581.75/Cum `. 52.36 `. 588.15/Cum `. 52.93 `. 594.55/Cum `. 53.51
`. 439.75/Cum `. 39.58 `. 446.15/Cum `. 40.15 `. 452.55/Cum `. 40.73
`. 43,923.55/MT `. 1,071.73 `. 43,925.53/MT `. 1,071.78 `. 43,927.52/MT `. 1,071.83
`. 393.56/10Sqm `393.56 `. 393.56/10Sqm `393.56 `. 393.56/10Sqm `393.56
Rate per 10 Sqm `. 1,708.75/10Sqm Rate per 10 Sqm `. 1,711.09/10Sqm Rate per 10 Sqm `. 1,713.45/10Sqm
Rate per Sqm `. 170.88/Sqm Rate per Sqm `. 171.11/Sqm Rate per Sqm `. 171.35/Sqm
Fourth Fifth
Amount Total Rate Amount Total
`. 15.11 `.308.55/Cum `. 15.43
`. 189.07 `.426.55/Cum `. 191.95
`. 213.84 `. 474.06 `.509.55/Cum `. 216.56 `. 480.46
`. 33.16 `.669.55/Cum `. 33.48
`. 22.88 `.921.55/Cum `. 23.04
`. 49.94 `. 49.94 `.212.90/Cum `. 51.10 `. 51.10
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 751.54 `. 751.54 `. 759.10 `. 759.10
`. 1,002.05/Cum `. 1,002.05/Cum `. 1,012.13/Cum `. 1,012.13/Cum

Fourth Fifth
Amount Total Rate Amount Total
`. 10.50 `.426.55/Cum `. 10.66
`. 100.63 `.509.55/Cum `. 101.91
`. 480.78 `. 629.49 `.669.55/Cum `. 485.42 `. 635.89
`. 22.88 `.921.55/Cum `. 23.04
`. 14.70 `.594.55/Cum `. 14.86
`. 49.94 `. 49.94 `.212.90/Cum `. 51.10 `. 51.10
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 906.97 `. 906.97 `. 914.53 `. 914.53
`. 1,209.29/Cum `. 1,209.29/Cum `. 1,219.37/Cum `. 1,219.37/Cum

Fourth Fifth
Amount Total Rate Amount Total
`. 15.11 `.308.55/Cum `. 15.43
`. 189.07 `.426.55/Cum `. 191.95
`. 213.84 `. 474.06 `.509.55/Cum `. 216.56 `. 480.46
`. 33.16 `.669.55/Cum `. 33.48
`. 22.88 `.921.55/Cum `. 23.04
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 730.51 `. 730.51 `. 736.91 `. 736.91
`. 974.01/Cum `. 974.01/Cum `. 982.55/Cum `. 982.55/Cum

Fourth Fifth
Amount Total Rate Amount Total
`. 10.50 `.426.55/Cum `. 10.66
`. 100.63 `.509.55/Cum `. 101.91
`. 480.78 `. 629.49 `.669.55/Cum `. 485.42 `. 635.89
`. 22.88 `.921.55/Cum `. 23.04
`. 14.70 `.594.55/Cum `. 14.86
`. 28.91 `. 28.91 `.120.45/Cum `. 28.91 `. 28.91
`. 227.54 `. 227.54 `. 227.54/10Sqm `. 227.54 `. 227.54
`. 885.94 `. 885.94 `. 892.34 `. 892.34
`. 1,181.25/Cum `. 1,181.25/Cum `. 1,189.79/Cum `. 1,189.79/Cum
Earth Work for forming Embankment
Granular Sub Base - Grade I &III (Plant Mix) `. 813.58/Cum
Granular Sub Base - Grade I & III (Place Mix) `. 758.05/Cum
Mixing Charges for Sand Gravel mix fo WBM blindage Rs.188.90
Gravel `. 948.41/Cum
WBM Grade II
SG mix `. 970.32/Cum
Gravel `. 1,155.65/Cum
WBM Grade III
SG mix `. 1,177.56/Cum
Wet mix Macadam `. 1,021.18
Advance Patch 45mm `. 2,717.38/Cum
Advance Patch 13.2mm `. 2,902.38/Cum
Prime coat over WMM 6 Kg of Emulsion `. 38.45/Sqm
Tack Coat over WMM 2.5 Kg of Emulsion `. 13.91/Sqm
Tack Coat over BM 2.0 Kg of Emulsion `. 11.64/Sqm
Tack Coat over WBM 4 Kg of Emulsion `. 29.35/Sqm
Tack Coat over BT 2.5 Kg of Emulsion `. 13.91/Sqm
Premix Carpet with seal Coat `. 170.18/Sqm
Using CMP, Paver & Vibratory roller
Bituminous Macadam 50 mm thick `. 6,480.29/Cum
Bituminous Macadam 75 mm thick `. 6,462.82/Cum
Dense Bituminous Macadam 50 mm thick `. 7,461.08/Cum
Dense Bituminous Macadam 75 mm thick `. 7,217.48/Cum
Semi Dense Bituminous Concrete 25 mm thick `. 196.39/Sqm `. 7,855.40/Cum
Bituminous Concrete 40 mm thick `. 6,535.68/Cum
Bituminous Concrete 25 mm thick - Data incomplete
Tack Coat over WBM using 80/100
Tack Coat over BT using 80/100
Premix Carpet

Quarry CMP
Earth 1 Km 1 Km
Gravel 1 Km 1 Km
Metal 10 Km 10 Km
Sand 39 Km 50 Km
2/16/2012
Emulsion 372 Km Diesel 44.29
60/70 399 Km Kerosene 25.00
80/100 398 Km Furnace oil 42.33
Description Lead Cost Conveyance Total
90 1 267.00 6.40 273.40
75 1 299.00 6.40 305.40
63 1 385.00 6.40 391.40
53 1 468.00 6.40 474.40
46.5 1 628.00 6.40 634.40
45 1 628.00 6.40 634.40
37.5 1 641.00 6.40 647.40
26.5 1 605.00 6.40 611.40
25 1 605.00 6.40 611.40
22.4 1 880.00 6.40 886.40
13.2 1 813.00 6.40 819.40
11.2 1 553.00 6.40 559.40
6.7 1 411.00 6.40 417.40
6 1 411.00 6.40 417.40
5.6 1 411.00 6.40 417.40
4.75 mm & below IRC 1 364.00 6.40 370.40
25 1 605.00 6.40 611.40
12 1 553.00 6.40 559.40
6 1 411.00 6.40 417.40
Stone Dust 1 84.00 6.40 90.40
Gravel 1 111.00 6.40 117.40
Sand 120 110.00 524.00 634.00
Dense Bituminous Macadam 75 mm thick
37.50 - 13.2 mm Metal
Cost of 26.5mm metal 0.51 Cum `. 611.40/Cum `311.81
Cost of 22.4mm metal 0.49 Cum `. 886.40/Cum `434.34
`746.15
13.2 - 2.36 mm Metal
Cost of 11.2mm metal 0.61 Cum `. 417.40/Cum `254.61
Cost of 2.36mm metal 0.39 Cum `. 370.40/Cum `144.46
`399.07
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40

Quarry dust `90.40

Rate for one Cum of Dense Bituminous Macadam 75 mm thick


Cost of 37.5 mm - 13.20 mm 0.35 Cum `. 746.15/Cum `261.15
Cost of 13.20mm - 2.36 mm 0.45 Cum `. 399.07/Cum `179.58
Cost of 2.36 mm and below 0.20 Cum `. 370.40/Cum `74.08
Cost of quarry dust 0.02 Cum `. 90.40/Cum `1.81
Cost of (60/70) Bitumen 74.25 Kg `. 44,918.94/MT `3,335.23
Hire & Labour Charges 10.00 Sqm ### `1,561.26
Rate for 10 sqm of 75 mm thick = `5,413.11
Rate per M3 `. 7,217.48/Cum
Dense Bituminous Macadam 50 mm thick
26.5 - 13.2 mm Metal
Cost of 22.4mm metal 1.00 Cum `. 886.40/Cum `886.40

13.2 - 2.36 mm Metal


Cost of 11.2mm metal 0.69 Cum `. 417.40/Cum `288.01
Cost of 2.36mm metal 0.31 Cum `. 370.40/Cum `114.82
`402.83
2.36 mm and below Metal
Cost of 2.36mm metal 1.00 Cum `. 370.40/Cum `370.40

Rate for one Cum of Dense Bituminous Macadam 50 mm thick


Cost of 26.5 mm - 13.20 mm 0.35 Cum `. 886.40/Cum `310.24
Cost of 13.20mm - 2.36 mm 0.21 Cum `. 402.83/Cum `84.59
Cost of 2.36 mm and below 0.14 Cum `. 370.40/Cum `51.86
Cost of (60/70) Bitumen 49.50 Kg `. 44,918.94/MT `2,223.49
Hire & Labour Charges 10.00 Sqm ### `1,060.36
Rate for 10 sqm of 50 mm thick = `3,730.54
Rate per M3 `. 7,461.08/Cum
Bituminous Macadam 75 mm thick
45 - 22.4 mm Metal
26.5mm metal 0.53 Cum `. 611.40/Cum `324.04
22.4mm metal 0.47 Cum `. 886.40/Cum `416.61
`740.65
11.2 - 2.8 mm Metal
Cost of 6.7mm metal 0.61 Cum `. 417.40/Cum `254.61
Cost of 2.8mm metal 0.39 Cum `. 370.40/Cum `144.46
`399.07
22.4 - 11.2 mm & metal
Cost of 13.2mm metal 1.00 Cum `. 819.40/Cum `819.40

Rate for one Cum of Bituminous Macadam 75 mm thick


Cost of 45 mm - 22.40 mm 0.63 Cum `. 740.65/Cum `466.61
Cost of 11.20mm - 2.8 mm 0.25 Cum `. 399.07/Cum `99.77
Cost of 22.4 mm - 11.2 mm 0.16 Cum `. 819.40/Cum `131.10
Cost of (60/70) Bitumen 58.00 Kg `. 44,918.94/MT `2,605.30
Hire & Labour Charges 10.00 Sqm ### `1,557.44
Rate for 10 sqm of 75 mm thick = `4,860.22
Rate per M3 `. 6,480.29/Cum
Bituminous Macadam 50 mm thick
26.5 - 11.2 mm Metal
Cost of 22.4mm metal 0.53 Cum `. 886.40/Cum `469.79
Cost of 13.2mm metal 0.47 Cum `. 819.40/Cum `385.12
`854.91
11.2 - 2.8 mm Metal
Cost of 6.7mm metal 0.69 Cum `. 417.40/Cum `288.01
Cost of 2.8 mm Metal 0.31 Cum `. 370.40/Cum `114.82
`402.83
2.8 mm and below Metal
Cost of 2.8 mm Metal 1.00 Cum `. 370.40/Cum `370.40

Rate for one Cum of Bituminous Macadam 50 mm thick


Cost of 26.5 mm - 11.20 mm 0.42 Cum `. 854.91/Cum `359.06
Cost of 11.20mm - 2.8 mm 0.10 Cum `. 402.83/Cum `40.28
Cost of 2.8 mm and below 0.18 Cum `. 370.40/Cum `66.67
Cost of (60/70) Bitumen 38.00 Kg `. 44,918.94/MT `1,706.92
Hire & Labour Charges 10.00 Sqm ### `1,058.48

Rate for 10 sqm of 50 mm thick = `3,231.41

Rate per M3 `. 6,462.82/Cum

Rate for one Sqm of SEMI DENSE BITUMINOUS CONCRETE 25 MM THICK


Cost of 11.2 mm metal 0.10 Cum `. 559.40/Cum `55.94
Cost of 6.7 mm metal 0.16 Cum `. 417.40/Cum `66.78
Cost of 2.8 mm metal 0.11 Cum `. 370.40/Cum `40.74
Cost of (60/70) Bitumen 28.00 Kg `. 44,918.94/MT `1,257.73
Hire & Labour Charges 10.00 Sqm `. 542.66/10Sqm `542.66
Rate for 10 sqm of 25 mm thick = ###
Rate per Sqm of 25 mm thick = `. 196.39/Sqm
Rate per Cum `. 7,855.40/Cum
CIOMBATORE (H) CIRCLE

BASIC RATE AS ON 1.07.2011

Labour charges
Mazdoor class-I Each Rs. 173.00
Mazdoor class-II Each Rs. 155.00
Mazdoor class-III Each Rs. 155.00
Haed mazdoor Each Rs. 178.00
Dresser and surveying allingnment Each Rs. 114.00
Forming edge bund per 10M² Rs. 1.85
Maintaining berm for traffic per 10M² Rs. 1.85
Watering and keeping surface moist per 10M² Rs. 1.85
Rent to tools including baskets per 10M² Rs. 1.85
Sundries such as ropes per 10M² Rs. 1.82

Hire charges for machinery

Power Roller per day Rs. 720.00


Water Sprinkler per day Rs. 1008.00
Central Mixing Plant per day Rs. 8432.00
Vibratory Roller per day Rs. 4720.00
Paver Finisher per day Rs. 2128.00
Tipper Trucks per day Rs. 952.00
Mini Hot Mix Plant per day Rs. 1456.00
Bitumen Boiler per day Rs. 176.00
Power Roller per day Rs. 720.00
Water Sprinkler per day Rs. 1008.00
Central Mixing Plant per day Rs. 8432.00
Vibratory Roller per day Rs. 4720.00
Paver Finisher per day Rs. 2128.00
Tipper Trucks per day Rs. 952.00
Mini Hot Mix Plant per day Rs. 1456.00
Bitumen Boiler per day Rs. 176.00
FORMING EMBANKMENT WITH EARTH WORK EXCAVATION FROM
BOROW PITS AND COMPACTION BY POWER ROLLER
HIRE CHARGES FOR MACHINERIES .
POWER ROLLER
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Total Hire charges per day = 1605.80
Daily out turn : 425 Cum
Hire charges for power roller per 10M2 = 1605.8 = 3.78
###
WATER SPRINKLER
Hire charges excluding fuel charges per day. = 1008.00
Fuel Charges per day = 44.29 x 3.25 lit x 8hrs = 1151.54
Hire charge per day = 2159.54
Daily out turn : 1000 Cum
Hire charges of water sprinkler per 10M2 2159.54 = 2.16
###
Total hire charges for 10 M2 = 3.78 + 2.16 = 5.94
Labour Charges For 100 M 3

2 Nos Mazdoor Grade I 173.00 /No = 346.00

Labour Charges for 10sqm = 346.00 3.46


###

Total hire and labour charges per Cum = 5.94 + 3.46 = 9.40

Total Hire and Labour charges per M3 = 9.40


POWER ROLLER

Hire charges excluding fuel charges per day. = 720


Fuel charges.(Diesel) per day = 8hrs = 885.8
Total Hire charges per day = 1605.8
Daily out turn : 500 Cum
Hire charges for power roller per 10M2 = 1605.8 = 3.21
500.00
WATER SPRINKLER

Hire charges excluding fuel charges per day. = 1008


Fuel Charges per day = 8hrs = 1151.54
Hire charge per day 2159.54
Daily out turn : 1000 Cum
Hire charges of water sprinkler per 10M2 159.54 = 2.16
1000.00
Total hire charges for 10 M2 3.21 + 2.16 = 5.37

Labour Charges For 100 M3

2 Nos Mazdoor Grade I 173.00 346

Labour Charges for 10sqm = 346.00 3.46


100.00

5.37 + 3.46 = 8.83

Total Hire and Labour charges per M3 = 8.83


GRANULAR SUBBASE

HIRE CHARGES FOR MACHINERIES .

POWER ROLLER

Hire charges excluding fuel charges per day. = 720.00


Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Total Hire charges per day = 1605.80
Daily out turn : 950 sqm of 100mm thick.
Hire charges for power roller per 10M2 = 1605.8x10 = 16.90
950
WATER SPRINKLER

Hire charges excluding fuel charges per day. = 1008.00


Fuel Charges per day = 44.29 x 3.25lit x 8hrs = 1151.54
Hire charge per day = 2159.54
Daily out turn : 450 sqm of 75mm thick.
Hire charges of water sprinkler per 10M2 2159.54 = 2.16
###
Total hire charges for 10 M2 = 16.9 + 2.16 = 19.06

Labour Charges For Mixing 950 M²

6.00 Nos Mazdoor Grade I 173.00 /No = 1038.00


24.00 Nos Mazdoor Grade II 155.00 /No = 3720.00
Total Labour Charges for 950M² = 4758.00
Labour Charges for 10sqm = 4758 x 10 = 50.08
950.00
For Spreading 100 cum

4.00 Nos Mazdoor Grade I 173.00 /No = 692.00


Labour Charges for 10M² = 692 = 6.92
###
Total Labour Charges for 10M² = 50.08 + 6.92 = 57.00
Total hire and labour charges per 10 sqm of

…………………………………….. 100mm thick


19.06 + 57 = 76.06
(OR)
Total Hire and Labour charges per M3 = 76.06
FORMING EMBANKMENT WITH EARTH WORK EXCAVATION FROM
BOROW PITS AND COMPACTION BY POWER ROLLER
HIRE CHARGES FOR MACHINERIES .
POWER ROLLER
Hire charges excluding fuel charges per day. =
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs
Total Hire charges per day =
Daily out turn : 425 Cum
Hire charges for power roller per 10M2 = 1605.8 =
###
WATER SPRINKLER
Hire charges excluding fuel charges per day. =
Fuel Charges per day = 44.29 x 3.25 lit x 8hrs
Hire charge per day =
Daily out turn : 1000 Cum
Hire charges of water sprinkler per 10M2 2159.54 =
###
Total hire charges for 10 M2 = 3.78 + 2.16 =
Labour Charges For 100 M3
2 Nos Mazdoor Grade I 173.00 /No =

Labour Charges for 10sqm = 346.00


###
Total hire and labour charges per Cum = 5.94 + 3.46 =
Total Hire and Labour charges per M 3
= 9.40
TION FROM
LER

720.00
885.80
1605.80

3.78

1008.00
1151.54
2159.54

2.16

5.94

346.00

3.46

9.40
GRANULAR SUB BASE - GRADE - I GRANULAR SUB BAS

PLANT MIX METHOD (Taking output as 225.00 Cum) Cost of 53.00 mm to 22.40 mm metal

HIRE CHARGES FOR MACHINERIES : 1 53.00 mm =


2 46.50 mm =
6.00 Hour Wet mix plant 75 tonne capacity 971.00 hour 5826.00 3 45.00 mm =
6.00 Hour Electric Generating set - 125 KVA 563.00 hour 3378.00 4 37.50 mm =
4.50 Hour Water tanker 6 KL cpacity 1744.00 day 981.00 5 26.50 mm =
6.00 Hour Front end loader 1 Cum bucket capacity 1048.00 day 786.00 6 25.00 mm =
450.00 t km Tipper 10 tonne capacity 952.00 day 714.00 7 22.40 mm =
10 % cost of carriage to cover loading and unloading 714.00 71.00
6.00 Hour
Motor grader 110 HP 1471.00 /Hour 8826.00 =
Vibratory roller 8 -10 tonnes
6.00 Hour 4720.00 day 3540.00 Conveyence charge
=
Total Hire Charges = 24122.00 at Km
590
LABOUR CHARGES
PLANT MIX METHOD
0.40 Nos Mate 178.00 /No 71.20 Quantity Description
2.00 Nos Mazdoor skilled 173.00 /No 346.00
8.00 Nos Mazdoor 155.00 /No 1240.00 144.00 Cum 53 mm to 22.4 mm broken stone (50%
Total labour Charges = 1657.20 57.00 Cum 22.4 mm to 4.75 mm of Gravel (20%)
86.40 Cum 4.75 mm below of sand (30%)
Total Hire and Labour charges per M 3
= 25779.20 27.00 KL Water
225.00 Cum Hire and Labour charges

MIX IN PLACE METHOD (Taking output as 300 Cum)


Taking output as 300.00 Cum
A. LABOUR CHARGES for 100 Cum

0.48 Nos Mate 178.00 /No 85.44 MIX IN PLACE METHOD


2.00 Nos Mazdoor skilled 173.00 /No 346.00 Quantity Description
10.00 Nos Mazdoor 155.00 /No 1550.00
Total labour Charges = 1981.44 192.00 Cum 53 mm to 22.4 mm broken stone (50%
B. HIRE CHARGES FOR MACHINERIES . 76.00 Cum 22.4 mm to 4.75 mm of Gravel (20%)
115.20 Cum 4.75 mm below of sand (30%)
6.00 Hour Motor grader 110 HP 1471.00 / Hour 8826.00 18.00 KL Water
6.00 Hour Vibrator roller 8 -10 tonnes 4720.00 Day 3540.00 300.00 Cum Hire and Labour charges
12.00 Hour Tractor - Rotovator 307.00 / Hour 3684.00
3.00 Hour Water tanker 1744.00 day 654.00
Total Hire Charges = 16704.00
Total Hire and Labour charges per M3 = 18685.44
GRANULAR SUB BASE GRADING - I

Cost of 53.00 mm to 22.40 mm metal (for plant mix)

Gravel =
Conveyence
=
at Km

/7
Sand =
Conveyence
=
charge at Km

Description Rate Rate Amount

53 mm to 22.4 mm broken stone (50%) / Cum


22.4 mm to 4.75 mm of Gravel (20%) / Cum
4.75 mm below of sand (30%) / Cum
120 / KL 3240.00
Hire and Labour charges 25779.20 225 Cum 25779.20
Cost for 225 Cum =
Cost for 1 Cum = / 225
Rate per Cum =
Description Rate Rate Amount

53 mm to 22.4 mm broken stone (50%) / Cum


22.4 mm to 4.75 mm of Gravel (20%) / Cum
4.75 mm below of sand (30%) / Cum
120 / KL 2160.00
Hire and Labour charges 18685.44 300 Cum 18685.44
Cost for 300Cum =
Cost for 1 Cum =
Rate per Cum =
GRANULAR SUB BASE - GRADE - III GRANULAR SUB BAS

PLANT MIX METHOD (Taking output as 225.00 Cum) PLANT MIX METHOD
Quantity Description
HIRE CHARGES FOR MACHINERIES :
100.80 Cum 9.5 mm to 4.75 mm Gravel (35%)
6.00 Hour Wet mix plant 75 tonne capacity 971.00 hour 5826.00 36.00 Cum 4.75mm to 2.36 mm of Metal Chips (12
6.00 Hour Electric Generating set - 125 KVA 563.00 hour 3378.00 115.20 Cum 2.36 mm below of sand (52.5%)
4.50 Hour Water tanker 6 KL cpacity 1744.00 day 981.00 27.00 KL Water
6.00 Hour Front end loader 1 Cum bucket capacity 1048.00 day 786.00 225.00 Cum Hire and Labour charges
450.00 t km Tipper 10 tonne capacity 952.00 day 714.00
10 % cost of carriage to cover loading and unloading 714.00 71.00
6.00 Hour Motor grader 110 HP 1471.00 /Hour 8826.00
6.00 Hour Vibratory roller 8 -10 tonnes 4720.00 day 3540.00
Total Hire Charges = 24122.00

LABOUR CHARGES

0.40 Nos Mate 178.00 /No 71.20


2.00 Nos Mazdoor skilled 173.00 /No 346.00
8.00 Nos Mazdoor 155.00 /No 1240.00
Total labour Charges = 1657.20

Total Hire and Labour charges per M3 = 25779.20

MIX IN PLACE METHOD (Taking output as 300.00 Cum)


Taking output as 300.00 Cum
A. LABOUR CHARGES for 100 Cum
0.48 Nos Mate 178.00 /No 85.44 MIX IN PLACE METHOD
2.00 Nos Mazdoor skilled 173.00 /No 346.00 Quantity Description
10.00 Nos Mazdoor 155.00 /No 1550.00
Total labour Charges = 1981.44 134.40 Cum 9.5 mm to 4.75 mm Gravel (35%)
B. HIRE CHARGES FOR MACHINERIES . 48.00 Cum 4.75mm to 2.36 mm of Metal Chips (12
6.00 Hour Motor grader 110 HP 1471.00 / Hour 8826.00 201.60 Cum 2.36 mm below of sand (52.5%)
6.00 Hour Vibrator roller 8 -10 tonnes 4720.00 Day 3540.00 18.00 KL Water
12.00 Hour Tractor - Rotovator 307.00 / Hour 3684.00 300.00 Cum Hire and Labour charges
3.00 Hour Water tanker 1744.00 day 654.00
Total Hire Charges = 16704.00
Total Hire and Labour charges per M3 = 18685.44
GRANULAR SUB BASE GRADING - III

Description Rate Rate Amount

9.5 mm to 4.75 mm Gravel (35%) / Cum


4.75mm to 2.36 mm of Metal Chips (12.5%) / Cum
2.36 mm below of sand (52.5%) / Cum
120 / KL 3240
Hire and Labour charges 25779.20 225 Cum 25779.2
Cost for 225 Cum =
Cost for 1 Cum = / 225
Rate per Cum =

Description Rate Rate Amount

9.5 mm to 4.75 mm Gravel (35%) / Cum


4.75mm to 2.36 mm of Metal Chips (12.5%) / Cum
2.36 mm below of sand (52.5%) / Cum
120/ KL 2160
Hire and Labour charges 300Cum
18685.44 18685.4
Cost for 300 Cum =
Cost for 1 Cum = / 300
Rate per Cum =
Providing and applying thermo plastic reflective Sqm
paint of any colour or compound for trafic lane strips
100 mm wide and 3 mm. thick of Pigment 10% on
clean
dry and good road surface with 10% glass beads, 20%
binder, 10% extender and 60% of filler material as per
M.O.S.T. Specification No. 803.4
Spec. No. : M.O.S.T. & H 513

Providing and painting centre line/dashes arrows etc. RM


in two coats on new/old work with ready mix road
marking
paints confirming to I.S. 164 on Bituminous surface
including
cleaning the surface demarking of site and traffic
controlled
involved (10 cm wide)
Spec. No. M.O.R.T. & H. - 803

Providing and applying zebra painting of pedestrain Sqm


on the carriage way with approved road marking paint
in
two coats etc. (10 cm wide)
CRUSHER RUN MACADAM
HIRE CHARGES AND LABOUR CHARGES FOR CRUSHER RUN MACADAM 300mm thick
HIRE CHARGES FOR MACHINERIES .
1. Loader 5 Cum capacity
Hire & running charges per day = 1048.00
Fuel Charges 80 litres per day 80 lit of Diesel/ day x 44.29= 3543.20
Total hire charges including fuel per d 4591.20
Total hire charges including fuel per Hour = 4591.2 / 8 = 573.90

2.Tipper
Hire & running charges per day = 952.00
Fuel Charges 3.25 litres per hour 3.25 lit of Diesel/ hr x 8 x 44.29= 1151.54
Total hire charges including fuel per d 2103.54
Total hire charges including fuel per Hour = 2103.54 / 8 = 262.94

3.Water tanker
Hire & running charges per day = 744.00
Fuel Charges 25 litres per day 25 lit of Diesel/ day x 44.29= 1107.25
Total hire charges including fuel per d 1851.25
Total hire charges including fuel per Hour = 1851.25 / 8 = 231.41

4.Vibaratory Roller
Hire & running charges per day = 4720.00
Fuel Charges 3.00 litres per hour 3 lit of Diesel/ hr x 8 x 1008= 1062.96
Total hire charges including fuel per day 5782.96
Total hire charges including fuel per Hour = 5782.96 / 8 = 722.87

5 Hire charges for Motor Grader including fuel charges per Hour.(Local rate) 1471.00
=

Hire and fuel chages for machineries for 100cum of CRM

1 Loader for 6 Hours @ 573.90 / Hour = 3443.40


2 Tipper for 24 Hours @ 262.94 / Hour = 6310.56
3 Water tanker for 24 Hours @ 231.41 / Hour = 5553.84
4 Motor Grader for 4 Hours @ 1471.00 / Hour = 5884.00
5 Vibratory roller for 6 Hours @ 722.87 / Hour = 4337.22
Total hire charges including fuel 100cum of CRM 25529.02
Hire and fuel chages for machineries for 1cum of CRM (A) 25529.02 / 100 = 255.29
LABOUR CHARGES for 100 Cum of CRM
0.50 Head Mazdoor 178.00 /No = 89.00
8.63 Mazdoor I 114.00 /No = 983.82
2.00 Mazdoor II 155.00 /No = 310.00
Total Labour Charges for 100.00cum of CRM = 1382.82
Total Labour Charges for 1.00cum of CRM (B) 1382.82 / 100cum 13.83
Total Hire Charges and Labour charges 10sqm of 100mm thick or 1cum.
255.29 + 13.83 = 269.12
269.12/10 Sqm

Cost of 53mm to 22.4 mm graded metal


1 53.0 mm 0.00
2 46.5 mm 0.00
3 45.0 mm 0.00
4 37.5 mm 0.00
5 26.5 mm 0.00
6 25.0 mm 0.00
7 22.4 mm 0.00
0.00 /7
= 0.00
0 Km Conveyence charge 0.00
53-22.4 mm 0.00 /Cum

Cost of 22.4 to 2.36 mm graded metal


1 13.2 mm
2 11.2 mm
3 9.5 mm 0.00
4 6.7 mm 0.00
5 6.0 mm 0.00
6 5.6 mm 0.00
7 4.75 mm 0.00
8 2.36 mm 0.00
0.00 /8
0.00
0 Km Conveyence charge 0.00
22.4 - 2.6mm 0.00 /Cum

Cost of 2.36 -0.09mm metal


2.36 mm 0.00 /Cum
0 Km Conveyence charge 0.00
2.36 mm below 0.00

Cost of 900micron and below


2.36 mm 0.00 /Cum
0 Km Conveyence charge 0.00
2.36 mm below 0.00

WET MIX MACADAM


Quantity Rate Unit per Amount
0.46 Cost of 53mm to 22.4mm graded metal - 35% 0.00 cum
0.46 Cost of 22.4mm to 2.36mm graded metal - 3 0.00 cum
0.33 Cost of 2.36 to 0.09mm metal - 25% 0.00 cum
0.07 Cost of 900micron and below - 5% 0.00 cum
1.00 Labour charges 13.83 cum
1.00 Hire Charges 255.29 cum
Rate per M3 =
WET MIX MACADAM

HIRE CHARGES FOR MACHINERIES .


1 Hire & running charges for loader 5 Cum capacity / day = 1048.00
Fuel Charges For running the Plant 80 lit of Diesel/ day x 44.29= 3543.20
4591.20
Hire Charges per Hour = 4591.2 / 8 = 573.90

2 Hire & running charges for Tipper / day = 952.00


Fuel Charges For per day 3.25 lit of Diesel/ hr x 8 x 44.29= 1151.54
2103.54
Hire Charges per Hour = 2103.54 / 8 = 262.94

3 Hire & running charges Water tank/ day = 744.00


Fuel Charges For per day 25 lit of Diesel/ day x 44.29= 1107.25
1851.25
Hire Charges per Hour = 1851.25 / 8 = 231.41

4 Hire & running charges for Vibaratory Roller / day = 4720.00


Fuel Charges For per day 3 lit of Diesel/ hr x 8 x 1008= 1062.96
5782.96
Hire Charges per Hour = 5782.96 / 8 = 722.87

5 Hire charges for Motor Grader including fuel charges per Hour. = 1471.00

6 Hire charges for Base mix plant ( PUG mill) including fuel charges per Hour. = 726.00

Machinery charges for Wet mix macadam = 100 Cum

1 Loader for 6 Hours @ 573.90 / Hour = 3443.40


2 Base mix plant (Pug mill) 6 Hours @ 726.00 / Hour = 4356.00
3 Tipper for 24 Hours @ 262.94 / Hour = 6310.56
4 Water tanker for 24 Hours @ 231.41 / Hour = 5553.84
5 Motor Grader for 4 Hours @ 1471.00 / Hour = 5884.00
6 Vibratory roller for 6 Hours @ 722.87 / Hour = 4337.22
Rate per 100 Cum = 29885.02
Rate per cum = 29885.02 / 100 = 298.85
Taking wet mix macadam 250 mm thick 298.85 x 0.25 = 74.71
Rate per Sqm = 74.71 of 250 mm thick
LABOUR CHARGES for 100 Cum
0.50 Head Mazdoor 178.00 /No = 89.00
8.63 Dresser and surveying allignment 114.00 /No = 983.82
2.00 Mazdoor Grade II 155.00 /No = 310.00
Total Labour Charges for 100.00 M3 = 1382.82

Labour Charges for 1 cum = 1382.82 / 100cum 13.83


Total Hire Charges and Labour charges.
Using Vibratory Roller. = 298.85 + 13.83 = 312.68

312.68/10 Sqm
Working out Metal Rate.(45 to 22.40mm metal )
Size of Metal Unit per Rate
1.00M3 Cost of 45 mm metal M3
1.00M3 Cost of 37.50 mm metal M3
1.00M3 Cost of 26.50 mm metal M3
1.00M3 Cost of 25.0 mm metal M3
1.00M3 Cost of 22.40 mm metal M3
TOTAL
Average rate = /5=

Working out Metal Rate.( 22.40 to 2.36 mm metal )


Size of Metal Unit per Rate
1.00M3 Cost of 22.40 mm metal M3
1.00M3 Cost of 13.20 mm metal M3
1.00M3 Cost of 11.20 mm metal M3
1.00M3 Cost of 6.70 mm metal M3
1.00M3 Cost of 6.00 mm metal M3
1.00M3 Cost of 5.60 mm metal M3
1.00M3 Cost of 4.75 mm metal M3
TOTAL
Average rate = /7=

WET MIX MACADAM


Quantity Rate Unit per Amount
0.396 M3 Cost of 45 - 22.4 mm graded metal M3
0.0.528 M3 Cost of 22.40 - 2.306 mm graded metal M3
0.396 M3 Cost of 2.36mm & below size metal M3
1.00M3 Hire & Labour Charges MT
Rate per M3 =
WBM GRADE II & III

HIRE CHARGES FOR MACHINERIES


POWER ROLLER
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charge per day = 1605.80
Daily out turn : 450 sqm of 75mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 35.68
450
WATER SPRINKLER
Hire charges excluding fuel charges per day. = 1008.00
Fuel charges.(Diesel) per day = 44.29 x 3.50lit x 8hrs = 1240.12
Hire charge per day = 2248.12
Daily out turn : 450 sqm of 75mm thick.
Hire charges of water sprinkler per 10M2 2248.12 x 10 = 49.96
450
Total hire charges for Machinery for 10 sqm = 35.68 + 49.96 = 85.64

1.08 x 3/16 Mazdoor Category I (1.08×3/16) 173.00 Each 35.03


1.08 x 1/4 Mazdoor Category II (1.08×1/4) 155.00 Each 41.85
1.08 x 1/3 Mazdoor Category II (1.08×1/3) 155.00 Each 55.80
Forming edge bund 1.85 L.S 1.85
Maintaining berm for traffic barricading 1.85 L.S 1.85
providing danger light etc.,
Watering and keeping surface moist for 15 1.85 L.S 1.85
days
Rent to tools including baskets, pick axes 1.85 L.S 1.85

Sundries such as ropes, waterpots, etc., 1.82 L.S 1.82

Total labour for 10 M2 = 141.90

Total hire and labour charges for 10M2 = 85.64 + 141.9 = 227.54
WBM GRADE II
0.05 Cum Cost of 90 mm metal
0.45 Cum Cost of 63 mm metal
0.425 Cum Cost of 53 mm metal
0.05 Cum Cost of 45 mm metal
0.025 Cum Cost of 22.4 mm metal
WBM GRADE III
0.025 Cum Cost of 63 mm metal
0.20 Cum Cost of 53 mm metal
0.725 Cum Cost of 45 mm metal
0.025 Cum Cost of 22.4 mm metal
0.025 Cum Cost of 11.2 mm metal
Labour Charges for Patch work with bituminous premix materials
for 0.625 Cum of Bituminous Material

Picking the road surface 2 " to 3" deep In


Maz I 1.08 x 1/6 x 173 = 31.14
Patches and cutting

Removing the picked up stuff Maz I 1.08 x 1/8 x 173 = 23.36

Brushing and cleaning the surface = 4.55

Spreading the Bitumen for tack coat = 3.54

Premixing the chips with hot bitumen in the drum


mixer and laying of 0.625 cum of metal with 44 kg
of Bitumen L.S = 17.68

Levelling and tamping the premix in the patches


and pot holes rolling etc., L.S = 6.06

Special tools such as wire brush L.S = 2.53

Regulation of traffic L.S = 2.53

Sundries such as barricading arrangements L.S = 0.71

Labour for laying 0.625 Cum of Bituminous


material = 92.10

Therefore for laying 1.00 Cum of Bitiminous


material 92.10 / 0.625 Cum = 147.35

147.35 / Cum
PRIME COAT OVER WMM SURFACE using 6 KG OF Bitumen Emulsion
LABOUR CHARGES
FOR PREPARING THE SURFACE:

10.0 Nos Mazdoor Category I 173.00 Each 1730.00


16.0 Nos Mazdoor Category II 155.00 Each 2480.00

FOR APPLYING TACK COAT:

4.0 Nos Mazdoor Category II 155.00 Each 620.00

Total labour = 4830.00

Labour Charges for 10 Sqm. 4830x10 Sqm 96.60


500
Labour charges of Bitumen Boiler per 10sqm = 96.6/ 10 Sqm

Hire charges for Bitumen sprayer L.S 15.00

Total hire and labour charges per 10 sqm = 111.60

DATA
Qty Description of item Rate Unit Amount
6.00 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 96.60 10 Sqm 96.60
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm

TACK COAT OVER WMM SURFACE using 2.5 KG OF Bitumen Emulsion


LABOUR CHARGES

FOR APPLYING TACK COAT:


3.0 Nos Mazdoor Category I 173.00 Each 519.00

Total labour = 519.00

Labour Charges for 10 Sqm. 519x10 Sqm 10.38


500

Labour charges of Bitumen Boiler per 10sqm = 10.38/ 10 Sqm

Hire charges for Bitumen sprayer L.S 15.00

Total hire and labour charges per 10 sqm = 25.38

DATA
Qty Description of item Rate Unit Amount
2.50 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER WMM SURFACE using 2.5 KG OF Bitumen Emulsion
HIRE CHARGES :

LABOUR CHARGES

FOR APPLYING TACK COAT:

3.0 Nos Mazdoor Category I 173.00 Each 519.00

Total labour = 519.00

Labour Charges for 10 Sqm. 519x10 Sqm 10.38


500

Labour charges of Bitumen Boiler per 10sqm = 10.38/ 10 Sqm

Hire charges for Bitumen sprayer L.S 15.00

Total hire and labour charges per 10 sqm = 25.38

DATA

Qty Description of item Rate Unit Amount

2.50 Kg Cost of bitumen Emulsion MT


10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER BM / BT SURFACE using 2.5 Kg of Bitumen Emulsion
HIRE CHARGES :

LABOUR CHARGES

FOR APPLYING TACK COAT:

3.0 Nos Mazdoor Category I 173.00 Each 519.00

FOR APPLYING TACK COAT:

0.0 Nos Mazdoor Category II 155.00 Each 0.00

Total labour = 519.00

Labour Charges for 10 Sqm. 519x10 Sqm 10.38


500

Labour charges of Bitumen Boiler per 10sqm = 10.38/ 10 Sqm

Hire charges for Bitumen sprayer L.S 15.00

Total hire and labour charges per 10 sqm = 25.38

DATA

Qty Description of item Rate Unit Amount

2.50 Kg Cost of bitumen Emulsion MT


10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER WBM SURFACE using Bitumen Emulsion
LABOUR CHARGES
FOR PREPARING THE SURFACE:
10.0 Nos Mazdoor Category I 173.00 Each 1730.00
16.0 Nos Mazdoor Category II 155.00 Each 2480.00
FOR APPLYING TACK COAT:
4.0 Nos Mazdoor Category II 155.00 Each 620.00
Total labour = 4830.00
Labour Charges for 10 Sqm. 4830x10 Sqm 96.60
500
Labour charges of Bitumen Boiler per 10sqm = 96.6/ 10 Sqm
Hire charges for Bitumen sprayer L.S 15.00
Total hire and labour charges per 10 sqm = 111.60
DATA
Qty Description of item Rate Unit Amount
4.00 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 96.60 10 Sqm 96.60
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER BM / BT SURFACE using 2.5 Kg of Bitumen Emulsion
LABOUR CHARGES
FOR APPLYING TACK COAT:
3.0 Nos Mazdoor Category I 173.00 Each 519.00
Total labour = 519.00
Labour Charges for 10 Sqm. 519x10 Sqm 10.38
500
Labour charges of Bitumen Boiler per 10sqm = 10.38/ 10 Sqm
Hire charges for Bitumen sprayer L.S 15.00
Total hire and labour charges per 10 sqm = 25.38
DATA
Qty Description of item Rate Unit Amount
2.50 Kg Cost of bitumen Emulsion MT
10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER BT SURFACE using Bitumen Emulsion
HIRE CHARGES :

LABOUR CHARGES

FOR APPLYING TACK COAT:

3.0 Nos Mazdoor Category I 173.00 Each 519.00

FOR APPLYING TACK COAT:

0.0 Nos Mazdoor Category II 155.00 Each 0.00

Total labour = 519.00

Labour Charges for 10 Sqm. 519x10 Sqm 10.38


500

Labour charges of Bitumen Boiler per 10sqm = 10.38/ 10 Sqm

Hire charges for Bitumen sprayer L.S 15.00

Total hire and labour charges per 10 sqm = 25.38

DATA

Qty Description of item Rate Unit Amount

3.00 Kg Cost of bitumen Emulsion MT


10.00 Sqm Labour charges 10.38 10 Sqm 10.38
L.S Hire charges for Bitumen sprayer L.S 10 Sqm 15.00
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER WBM SURFACE using 80/100 Bitumen
HIRE CHARGES :

BITUMEN BOILER

Hire charges FOR Bitumen Boiler = 176.00


Fuel charges.(Kerosene ) per day 25 x 25lit = 625.00
Hire charges for Bitumen boiler per day = 801.00

Rate per Hour 801 100.13


8
Daily out turn : 125 sqm
Hire charges per 10 sqm = 100.13x10 = 8.01
125
Hire charges of Bitumen Boiler per 10sqm = 8.01 / 10 Sqm

LABOUR CHARGES

FOR PREPARING THE SURFACE:

10.0 Nos Mazdoor Category I 173.00 Each 1730.00


16.0 Nos Mazdoor Category II 155.00 Each 2480.00

FOR APPLYING TACK COAT:

10.0 Nos Mazdoor Category I 173.00 Each 1730.00

Total labour = 5940.00

Labour Charges for 10 Sqm. 5940x10 Sqm 118.80


500

Hire charges of Bitumen Boiler per 10sqm = 118.8/ 10 Sqm

Total hire and labour charges per 10 sqm = 8.01 + 118.8 = 126.81
126.81 /10sqm

Total hire and labour charges per 10 sqm = 126.81 /10sqm

DATA

Qty Description of item Rate Unit Amount

10.00 Kg Cost of 80/100 grade bitumen MT


10.00 Sqm Hire and labour charges 126.81 10 Sqm 126.81
Rate per 10 Sqm
Rate per Sqm
TACK COAT OVER BT SURFACE using 80/100 Bitumen

HIRE CHARGES :

BITUMEN BOILER

Hire charges FOR Bitumen Boiler = 176.00


Fuel charges.(Kerosene ) per day 25 x 25lit = 625.00
Hire charges for Bitumen boiler per day = 801.00

Rate per Hour 801 100.13


8
Daily out turn : 250 sqm
Hire charges per 10 sqm = 100.13x10 = 4.01
250
Hire charges of Bitumen Boiler per 10sqm = 4.01 / 10 Sqm

LABOUR CHARGES

FOR PREPARING THE SURFACE:

5.0 Nos Mazdoor Category I 173.00 Each 865.00

FOR APPLYING TACK COAT:

8.0 Nos Mazdoor Category I 173.00 Each 1384.00

Total labour = 2249.00

Labour Charges for 10 Sqm. 2249x10 Sqm 44.98


500

Hire charges of Bitumen Boiler per 10sqm = 44.98/ 10 Sqm

Total hire and labour charges per 10 sqm = 4.01 + 44.98 = 48.99
48.99 /10sqm

Total hire and labour charges per 10 sqm = 48.99 /10sqm

DATA

Qty Description of item Rate Unit Amount

5.00 Kg Cost of 80/100 grade bitumen MT


10.00 Sqm Hire and labour charges 48.99 10 Sqm 48.99
Rate per 10 Sqm
Rate per Sqm
PREMIX CARPET
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 42.33 x 45lit/hr = 1904.85
Hire charges per day = 2751.20
Hourly out turn : 180sqm .
Hire charges of mini hot mix plant per 10M2 = 2751.2x10= 152.84
180
POWER ROLLER
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit x 8hrs= 885.80
Hire charges per day = 1605.80
Daily out turn for PC : 500 sqm
Hire charges of power roller per 10sqm for PC 1605.8x10 = 32.12
500
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 25lit = 625.00
Hire charges including fuel charges per day. = 801.00
Rate / Hour = 801.00 /8 = 100.13
= 100.13 /125 = 0.801
Bitumen for PC = 14.60 Kg = 11.70
Total Hire charges for 10sqm of PC = 152.84 + 32.12 + 11.7 = 196.66

LABOUR CHARGES
0.75 No. Mazdoor Category I for premix carpet 173.00 Each 129.75
Total labour for 10sqm of PC = 129.75

Total hire and labour charges per 10 sqm = 196.66 + 129.75 = 326.41

326.41/ 10 Sqm

DATA

Qty Description of item Rate Unit Amount

0.18 Cum Cost of 13.2 mm metal Cum


0.09 Cum Cost of 11.2 mm metal Cum
14.60 Kg Cost of 80/100 grade bitumen MT
10.00 Sqm Hire and labour charges 230.24 10 Sqm 230.24
Rate per 10 Sqm
Rate per Sqm
PREMIX CARPET WITH SEAL COAT.
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate = 42.33 x 45lit/hr = 1904.85
Hire charges per day = 2751.20
Hourly out turn : 180sqm .
Hire charges of mini hot mix plant per 10M2 = 2751.2x10= 152.84
180
POWER ROLLER
Hire charges excluding fuel charges per day. =720.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit x 8hrs= 885.80
Hire charges per day = 1605.80
Daily out turn for PC : 500 sqm
Hire charges of power roller per 10sqm for PC = 1605.8x10 = 32.12
500
Daily out turn for sealcoat :1000 sqm
Hire charges of power roller per 10sqm for SC = 1605.8x10 = 16.06
1000
Hire charges of power roller per 10sqm of PC & SC = 32.12 + 16.06 = 48.18
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Daily out turn :1000 Kg.
Hire charges of Bitumen boiler per 10sqm of PC SC= 801x24.40Kg = 19.54
1000
Total Hire charges for 10sqm of PC & SC = 152.84 + 48.18 + 19.54= 220.56
LABOUR CHARGES
0.75 No. Mazdoor Category I for premix carpet 173.00 Each 129.75
0.25 No. Mazdoor Category I for seal coat 173.00 Each 43.25
Total labour for 10sqm of PC & SC = 173.00
Total hire and labour charges per 10 sqm = 220.56 + 173 = 393.56

Total hire and labour charges per 10 sqm = 393.56/ 10 Sqm


DATA
Qty Description of item Rate Unit Amount

0.18 Cum Cost of 13.2 mm metal Cum


0.09 Cum Cost of 11.2 mm metal Cum
0.09 Cum Cost of 6.7 mm metal Cum
24.40 Kg Cost of 60/70 grade bitumen MT
10.00 Sqm Hire and labour charges 393.56 10 Sqm 393.56
Rate per 10 Sqm
Rate per Sqm
CLOSE GRADED PREMIX CARPET 20mm compacted thick

Subdata (A)
Material for 270sqm
Description of item Rate Unit

2.187 Cum Cost of 11.2mm HBG metal - 30% Cum

3.208 Cum Cost of 5.6mm HBG metal - 44% Cum

1.677 Cum Cost of 2.8mm HBG metal - 23% Cum

0.219 Cum Cost of 0.009mm metal - 3% Cum

0.594 MT Cost of 60/70 grade bitumen MT

270.00sqm Hire charges 77962.25 270.00sqm

270.00sqm Labour charges 4.53 1.00sqm

Total (X) Rate per 270 Sqm

Rate per Sqm - (A)

Subdata (B)

HIRE CHARGES FOR MACHINERIES -270Sqm


3 CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. =
Hire charges per day = 8432 /8hrs =
Fuel Charges For running the Plant 30 lit of Diesel x 44.29=
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 =
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 =
Hire Charges including Fuel charges / Hour. =
4 TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs =
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit =
Total Hire charges per day =
5 PAVER FINISHER
Hire charges excluding fuel charges per day. =
Hire charges per hour = 2128/8hrs =
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs =
Hire charges including Fuel charges per hour
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
6 POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. =
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs =
Hire charges including fuel Charges per day =
Hire and fuel chages for machineries for 100cum of CRM

1 CMP of appropriate capacity (20-30tonne capaci 10637.05 / Hour


2 Tipper lorry 5 Nos. /day 262.94 / Hour
3 Paver finisher - 6hours 531.74 / Hour
4 Power roller 8-10 tonne - 6hours 1605.80 / Hour
Total (Y)
Rate per Sqm (B) 77962.25 / 270cum =
LABOUR CHARGES for 2000 Sqm
26.40 Mazdoor category - I 173.00 /No =
20.00 Mazdoor category - II 155.00 /No =
For attending paver
8.00 Mazdoor category - I 173.00 /No =
Total (Z) =
Rate per Sqm (C) 9051.2 / 2000sqm =
Total Hire Charges and Labour charges 1sqm
288.75 + 4.53 =
293.28/1 Sqm

Total rate per sqm (A+B+C) 293.28 /sqm


hick

Amount

77962.25

1223.10

8432.00
1054.00
1328.70
1058.25
7196.10
10637.05

119.00
143.94
262.94

2128.00
266.00
265.74
531.74

720.00
885.80
1605.80

63822.30
1314.71
3190.44
9634.80
77962.25
288.75

4567.20
3100.00

1384.00
9051.20
4.53

293.28
PREMIX CARPET WITH SEAL COAT Type - A using CMP

HIRE CHARGES FOR MACHINERIES .


CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. =
Hire charges per day = 8432 /8hrs =
Fuel Charges For running the Plant 30 lit of Diesel x 44.29=
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 =
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 =
Hire Charges including Fuel charges / Hour. =
Out turn of CMP per hour for PCSC = 325.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/325 =
BITUMEN
Since BitumenBOILER.
Boiler is attached with CMP Site. Hire charges for
separate bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. =
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs =
Hire charges including fuel Charges per day =
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 =
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 1605.8 x 10 =
1000
PAVER FINISHER
Hire charges excluding fuel charges per day. =
Hire charges per hour = 2128/8hrs =
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs =
Hire charges including Fuel charges per hour
Daily out turn of Paver finisher per 10 Sqm = 325.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 325 =
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs =
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit =
Total Hire charges per day =
Out turn of Tipper per hour = 325.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M = 2
262.94 x 6 x 10 =
325
Total Hire charges of Machinery per 10 sqm
Using Power Roller =327.29+32.12+16.06+16.36+48.54 = 440.37/10sqm
Rs 440.37/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33.00 Nos Mazdoor Grade I 173.00 /No =
25.00 Nos Mazdoor Grade II 155.00 /No =
For attending Paver Finisher.
10.00 Nos Mazdoor Grade I 173.00 /No =
²
Total Labour Charges for 2000.00 M =

Labour Charges for 10sqm = 11314 x 10 Sqm =


2000
Total Hire Charges and Labour charges.
Using Power Roller. = 440.37 + 56.57 =

Description of item Rate Unit

0.180 Cum Cost of 13.2 mm metal Cum

0.090 Cum Cost of 11.2 mm metal Cum

0.090 Cum Cost of 6.7 mm metal Cum

24.40 Kg Cost of 60/70 grade bitumen MT

10.00 Sqm Hire and labour charges 496.94 10 Sqm

Rate per 10 Sqm

Rate per Sqm


MP

8432.00
1054.00
1328.70
1058.25
7196.10
10637.05

327.29

720.00
885.80
1605.80
f 20 mm thick.
32.12

16.06

2128.00
266.00
265.74
531.74

16.36

119.00
143.94
262.94

48.54

10sqm
5709.00
3875.00

1730.00

11314.00

56.57

496.94

Amount

496.94
BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.

Hire charges excluding fuel charges per day. = 8432.00


Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for BM = 135.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/135 = 787.93
BITUMEN BOILER.
Since Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BM = 300.00 sqm of 50 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 53.53
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM = 350.00 sqm of 50 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 20.02
350
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 135.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 135 = 39.39
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 135.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 116.86
135
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 787.93+53.53+39.39+116.86=
= 997.71 /M2
Rs 997.71/ 10 Sqm.
Using Vibratory Roller = 787.93+20.02+39.39+116.86=
= 964.20 /M2
Rs 964.2/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
Total Labour Charges for 1200.00 M ²
= 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 94.28
1200
Total Hire Charges and Labour charges.

Using Power Roller. = 997.71 + 94.28 = 1091.99


1091.99.00/10 Sqm
Using Vibratory Roller. = 964.2 + 94.28 = 1058.48
1058.48/10 Sqm
Working out Metal Rate.( 26.5 - 11.2 mm metal )
Quantity Description Rate Unit per Amount
0.53 M3 Cost of 22.4mm metal M3
0.47 M3 Cost of 13.2 mm metal M3
Rate per M3 =
Working out Metal Rate.( 11.2 - 2.8 mm metal )
Quantity Description Rate Unit per Amount
0.69 M 3
Cost of 6.7 mm metal M 3

0.31 M3 Cost of 2.8 mm metal M3


Rate per M3 =
Working out Metal Rate.( 2.8 mm & below metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 2.8 mm metal M3
Rate per M3 =

Bituminous Macadam 50 MM thick.


Quantity Description Rate Unit per Amount
0.42 M3 Cost of 26.5 - 11.2 mm graded metal M3
0.10 M3 Cost of 11.2 - 2.8 mm graded metal M3
0.18 M3 Cost of 2.8 mm & below size metal M3
38.00 Kgs Cost of Bitumen ( % of weight of mix) MT 0.00
10.0 M 2
Hire & Labour Charges 1058.48 M 2
1058.48
Rate for 10 Sqm of 50 mm thick =
Rate per M3 = / 10 X 0.050) =
BITUMINOUS MACADAM 75 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for BM = 90.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/90 = 1181.89
BITUMEN
Since BitumenBOILER.
Boiler is attached with CMP Site. Hire charges for
separate bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BM = 225.00 sqm of 75 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 71.37
225
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM =250.00 sqm of 75 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 28.03
250
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 90.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 90 = 59.08
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 90.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 175.30
90
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 1181.89+71.37+59.08+175.3=
= 1487.64 /M2
Rs 1487.64/ 10 Sqm.
Using Vibratory Roller = 1181.89+28.03+59.08+175.3=
= 1444.30 /M2
Rs 1444.3/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1000.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 113.14
1000
Total Hire Charges and Labour charges.
Using Power Roller. = 1487.64 + 113.14 =1600.78
1600.78.00/10 Sqm
Using Vibratory Roller. = 1444.3 + 113.14 = 1557.44
1557.44/10 Sqm

Working out Metal Rate.( 45 - 22.4 mm metal )


Quantity Description Rate Unit per Amount
0.53 M3 Cost of 26.5 mm metal M3
0.47 M3 Cost of 22.4 mm metal M3
Rate per M3 =
Working out Metal Rate.( 11.2 - 2.8 mm metal )
Quantity Description Rate Unit per Amount
0.63 M 3
Cost of 6.7 mm metal M 3

0.37 M 3
Cost of 2.8 mm metal M3
Rate per M3 =
Working out Metal Rate.( 22.4 - 11.2 mm & metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 13.2 mm metal M3
Rate per M3 =

Bituminous Macadam 75 MM thick.


Quantity Description Rate Unit per Amount
0.63 M 3
Cost of 45 - 22.4 mm graded metal M 3

0.25 M3 Cost of 11.2 - 2.8 mm graded metal M3


0.16 M3 Cost of 22.4 - 11.2 mm grade metal M3
58.00 Kgs Cost of Bitumen ( % of weight of mix) MT
10.0 M2 Hire & Labour Charges 1557.44 M2 1557.44
Rate for 10 Sqm of 75 mm thick =
Rate per M3 = / 10 X 0.075) =
DENSE BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for DBM = 135.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/135 = 787.93
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for DBM = 300.00 sqm of 50 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 53.53
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for DBM = 320.00 sqm of 50 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 21.90
320
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 135.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 135 = 39.39
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 135.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M = 2
262.94 x 6 x 10 = 116.86
135
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 787.93+53.53+39.39+116.86=
= 997.71 /M2
Rs 997.71/ 10 Sqm.
Using Vibratory Roller = 787.93+21.9+39.39+116.86=
= 966.08 /M2
Rs 966.08/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1200.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 94.28
1200
Total Hire Charges and Labour charges.

Using Power Roller. = 997.71 + 94.28 = 1091.99


1091.99.00/10 Sqm
Using Vibratory Roller. = 966.08 + 94.28 = 1060.36
1060.36/10 Sqm

Working out Metal Rate.( 26.5 - 13.2 mm metal )


Quantity Description Rate Unit per Amount
1.00 M 3
Cost of 22.4mm metal M 3

Rate per M3 =
Working out Metal Rate.( 13.2 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.61 M3 Cost of 11.2 mm metal M3
0.39 M3 Cost of 2.36 mm metal M3
Rate per M3 =
Working out Metal Rate.( 2.36 mm & below metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 2.36 mm metal M3
Rate per M3 =

Dense Bituminous Macadam 50 MM thick.


Quantity Description Rate Unit per Amount
0.35 M3 Cost of 26.5 - 13.2 mm graded metal M3
0.21 M3 Cost of 13.2 - 2.36mm graded metal M3
0.14 M3 Cost of 2.36 mm & below size metal M3
49.50 Kgs Cost of Bitumen ( % of weight of mix) MT
10.0 M2 Hire & Labour Charges 1060.36 M2 1060.36
Rate for 10 Sqm of 50 mm thick =
Rate per M3 = / 10 X 0.050) =
DENSE BITUMINOUS MACADAM 75 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for DBM = 90.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/90 = 1181.89
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BM = 225.00 sqm of 75 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 71.37
225
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM =220.00 sqm of 75 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 31.85
220
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 90.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 90 = 59.08
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 90.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M = 2
262.94 x 6 x 10 = 175.30
90
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 1181.89+71.37+59.08+175.3=
= 1487.64 /M2
Rs 1487.64/ 10 Sqm.
Using Vibratory Roller = 1181.89+31.85+59.08+175.3=
= 1448.12 /M2
Rs 1448.12/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1000.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 113.14
1000

Total Hire Charges and Labour charges.

Using Power Roller. = 1487.64 + 113.14 =1600.78

1600.78.00/10 Sqm

Using Vibratory Roller. = 1448.12 + 113.14 = 1561.26

1561.26/10 Sqm

Working out Metal Rate.( 37.5 - 13.2 mm metal )


Quantity Description Rate Unit per Amount
0.51 M3 Cost of 26.5mm metal M3
0.49 M3 Cost of 22.4 mm metal M3
Rate per M3 =
Working out Metal Rate.( 13.2 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.61 M3 Cost of 11.2 mm metal M3
0.39 M3 Cost of 2.8 mm metal M3
Rate per M3 =
Working out Metal Rate.( 2.36 mm & below metal )
Quantity Description Rate Unit per Amount
1.00 M 3
Cost of 2.36 mm metal M 3

Rate per M3 =

Dense Bituminous Macadam 75 MM thick.


Quantity Description Rate Unit per Amount
0.35 M 3
Cost of 37.5 - 13.2 mm graded metal M 3

0.45 M3 Cost of 13.2 - 2.36 mm graded metal M3


0.20 M3 Cost of 2.36 mm & below size metal M3
0.02 M3 Cost of Quarry dust M3
74.25 Kgs Cost of Bitumen ( % of weight of mix) MT
10.0 M 2
Hire & Labour Charges 1561.26 M2 1561.26
Rate for 10 Sqm of 50 mm thick =
Rate per M3 = / 10 X 0.050) =
SEMI DENSE BITUMINOUS CONCRETE 25 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for SDBC = 270.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/270 393.96
BITUMEN
Since BitumenBOILER.
Boiler is attached with CMP Site. Hire charges for
separate bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for SDBC = 400.00 sqm of 25 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 40.15
400
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM = 500.00 sqm of 25 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 14.01
500
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 270.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 270 = 19.69
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 270.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 58.43
270
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 393.96+40.15+19.69+58.43=
= 512.23 /M2
Rs 512.23/ 10 Sqm.
Using Vibratory Roller = 393.96+14.01+19.69+58.43=
= 486.09 /M2
Rs 486.09/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1000.00 M = 11314.00

Labour Charges for 10sqm = 11314 x 10 Sqm = 56.57


2000
Total Hire Charges and Labour charges.
Using Power Roller. = 512.23 + 56.57 = 568.80
568.8/10 Sqm
Using Vibratory Roller. = 486.09 + 56.57 = 542.66
542.66/10 Sqm

DATA

Qty Description of item Rate Unit Amount

0.10 Cum Cost of 11.2 mm metal Cum


0.16 Cum Cost of 6.7 mm metal Cum
0.11 Cum Cost of 2.8 mm metal Cum
30.00 Kg Cost of Bitumen ( % of weight of mix) MT
10.00 Sqm Hire and labour charges 542.66 10 Sqm 542.66
Rate per 10 Sqm
Rate per Sqm
BITUMINOUS CONCRETE 25 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for BC = 270.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/270 = 393.96
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BC = 400.00 sqm of 25 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 40.15
400
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM = 600.00 sqm of 25 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 11.68
600
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 270.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 270 = 19.69
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 270.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 58.43
270
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 393.96+40.15+19.69+58.43=
= 512.23 /M2
Rs 512.23/ 10 Sqm.
Using Vibratory Roller = 393.96+11.68+19.69+58.43=
= 483.76 /M2
Rs 483.76/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 2000.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 56.57
2000
Total Hire Charges and Labour charges.
Using Power Roller. = 512.23 + 56.57 = 568.80
568.8.00/10 Sqm
Using Vibratory Roller. = 483.76 + 56.57 = 540.33
540.33/10 Sqm

Working out Metal Rate.( 19.0 - 9.5 mm metal )


Quantity Description Rate Unit per Amount
1.00 M3 Cost of 13.2 mm metal M3
Rate per M3 =
Working out Metal Rate.( 9.6 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.58 M3 Cost of 6.7 mm metal M3
0.42 M3 Cost of 2.8 mm metal M3
Rate per M3 =

Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.25 M3 Cost of 19 - 9.5 mm graded metal M3
0.14 M3 Cost of 9.5 - 2.36 mm graded metal M3
0.01 M3 Cost of Quarry dust M3
Kgs Cost of Bitumen ( % of weight of mix) MT
10.0 M2 Hire & Labour Charges 540.33 M2 540.33
Rate for 10 Sqm =
Rate per Sqm =
BITUMINOUS CONCRETE 40 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 8432.00
Hire charges per day = 8432 /8hrs = 1054.00
Fuel Charges For running the Plant 30 lit of Diesel x 44.29= 1328.70
For heating the Bitumen (Furnace Oil) = 25 lit of F.O. x 42.33 = 1058.25
For heating the Aggregate (Furnace Oil) = 170 lit of F.O. x 42.33 = 7196.10
Hire Charges including Fuel charges / Hour. = 10637.05
Out turn of CMP per hour for BC = 170.00 Sqm
Hire Charges of CMP per 10M2 = 10637.05 x 10 Sqm/170 = 625.71
BITUMEN
Since BOILER.
Bitumen Boiler is attached with CMP Site. Hire charges for separate
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 720.00
Fuel charges.(Diesel) per day = 44.29 x 2.5lit x 8hrs = 885.80
Hire charges including fuel Charges per day = 1605.80
Daily out turn of Power Roller per day for BC = 300.00 sqm of 40 mm thick.
Hire charges of power roller per 10M2 = 1605.8 x 10 = 53.53
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per hour = 2.5 lit x 44.29 = 110.73
Hire charges per hour = 700.73
Hourly out turn of Vibrator Roller for BM = 400.00 sqm of 40 mm thick.
Hire charges of Vibratory roller per 10M2 = 700.73 x 10 = 17.52
400
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2128.00
Hire charges per hour = 2128/8hrs = 266.00
Fuel Charges per hour = 44.29 x 6.00 lit x 8hrs = 265.74
Hire charges including Fuel charges per hour 531.74
Daily out turn of Paver finisher per 10 Sqm = 170.00 Sqm
Hire Charges of Paver finisher per 10M2 = 531.74 x 10 / 170 = 31.28
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 952/8hrs = 119.00
Fuel charges.(Diesel) per day = 44.29 x 3.25 lit = 143.94
Total Hire charges per day = 262.94
Out turn of Tipper per hour = 170.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 262.94 x 6 x 10 = 92.80
170
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 625.71+53.53+31.28+92.8=
= 803.32 /M2
Rs 803.32/ 10 Sqm.
Using Vibratory Roller = 625.71+17.52+31.28+92.8=
= 767.31 /M2
Rs 767.31/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 173.00 /No = 5709.00
25 Mazdoor Grade II 155.00 /No = 3875.00
For attending Paver Finisher.
10 Mazdoor Grade I 173.00 /No = 1730.00
²
Total Labour Charges for 1200.00 M = 11314.00
Labour Charges for 10sqm = 11314 x 10 Sqm = 94.28
1200
Total Hire Charges and Labour charges.
Using Power Roller. = 803.32 + 94.28 = 897.60
897.6.00/10 Sqm
Using Vibratory Roller. = 767.31 + 94.28 = 861.59
861.59/10 Sqm

Working out Metal Rate.( 26.5 - 9.5 mm metal )


Quantity Description Rate Unit per Amount
0.51 M3 Cost of 22.4 mm metal M3
0.49 M3 Cost of 13.2 mm metal M3
Rate per M3 =
Working out Metal Rate.( 9.5 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.58 M 3
Cost of 6.7 mm metal M 3

0.42 M3 Cost of 2.8 mm metal M3


Rate per M3 =

Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.40 M 3
Cost of 26.5 - 9.5 mm graded metal M 3

0.22 M3 Cost of 9.5 - 2.36 mm graded metal M3


0.01 M3 Cost of Quarry dust M3
44.00 Kgs Cost of Bitumen ( % of weight of mix) 0.00 MT
10.0 M 2
Hire & Labour Charges 861.59 M2 861.59
Rate for 10 Sqm =
Rate per Sqm =
BITUMINOUS MACADAM 50 MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 75sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 378.59
75
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 50 mm thick = 350 sqm
Hire charges of power roller per 10sqm = 700.73x10 = 20.02
350
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 38Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 32.89
38 Kgs
= 33.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 30.34
8 x 33
Total Hire charges for 10sqm of = 378.59 + 20.02 + 30.34= 428.95

LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00
22884 x 10 Sqm = 190.70
1200
Total hire and labour charges per 10 sqm = 428.95 + 190.7 = 619.65

Total hire and labour charges per 10 sqm = 619.65/ 10 Sqm


BITUMINOUS MACADAM 75MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 50sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 567.88
50
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 75 mm thick = 250 sqm
Hire charges of power roller per 10sqm = 700.73x10 = 28.03
250
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 58Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 21.55
58 Kgs
= 22.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 45.51
8 x 22
Total Hire charges for 10sqm of = 567.88 + 28.03 + 45.51= 641.42
LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00
22884 x 10 Sqm = 228.84
1000
Total hire and labour charges per 10 sqm = 641.42 + 228.84 = 870.26

Total hire and labour charges per 10 sqm = 870.26/ 10 Sqm


DENSE BITUMINOUS MACADAM 50 MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 75sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 378.59
75
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 50 mm thick = 320sqm
Hire charges of power roller per 10sqm = 700.73x10 = 21.90
320
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 46Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 27.17
46 Kgs
= 27.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 21.77
8 x 27
Total Hire charges for 10sqm of = 378.59 + 21.9 + 21.77= 422.26
LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00
22884 x 10 Sqm = 190.70
1200
Total hire and labour charges per 10 sqm = 422.26 + 190.7 = 612.96

Total hire and labour charges per 10 sqm = 612.96/ 10 Sqm


DENSE BITUMINOUS MACADAM 75MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 50sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 567.88
50
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 75 mm thick = 220sqm
Hire charges of power roller per 10sqm = 700.73x10 = 31.85
220
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 69Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 18.12
69.Kgs
= 18.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 45.51
8 x 18
Total Hire charges for 10sqm of = 567.88 + 31.85 + 45.51= 645.24
LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00

22884 x 10 Sqm = 228.84


1000
Total hire and labour charges per 10 sqm = 645.24 + 228.84 = 874.08

Total hire and labour charges per 10 sqm = 874.08/ 10 Sqm


SEMI DENSE BITUMINOUS CONCRETE 25 MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 145sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 195.82
145
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 25 mm thick = 500sqm
Hire charges of power roller per 10sqm = 700.73x10 = 14.01
500
BITUMEN BOILER

Hire charges excluding fuel charges per day. = 176.00


Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 24Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 52.08
24 Kgs
= 52.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 19.25
8 x52
Total Hire charges for 10sqm of = 195.82 + 14.01 + 19.25= 229.08
LABOUR CHARGES
1.00 No.Mazdoor Category I 173.00 Each 173.00
Total labour for 10sqm = 173.00

173 x 10 Sqm = 173.00

Total hire and labour charges per 10 sqm = 229.08 + 173 = 402.08

Total hire and labour charges per 10 sqm = 402.08/ 10 Sqm


BITUMINOUS CONCRETE 25 MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate = 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 145sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 195.82
145
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 25 mm thick = 600sqm
Hire charges of power roller per 10sqm = 700.73x10 = 11.68
600
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 27Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 46.30
27 Kgs
= 46.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 21.77
8 x46
Total Hire charges for 10sqm of = 195.82 + 11.68 + 21.77= 229.27
LABOUR CHARGES
83.00 No.Mazdoor Category I 173.00 Each 14359.00
55.00 No.Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00

22884 x 10 Sqm = 114.42


2000

Total hire and labour charges per 10 sqm = 229.27 + 114.42 = 343.69

Total hire and labour charges per 10 sqm = 343.69/ 10 Sqm


BITUMINOUS CONCRETE 40 MM THICK
Using Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERIES :
MINI HOT MIX PLANT
Hire charges excluding fuel charges per Hour 1456 / 8 = 182.00
Fuel charges for running the plant 44.29 x 15lit/hr = 664.35
Fuel charges for heating the aggregate 44.29 x 45lit/hr = 1993.05
Hire charges per day = 2839.40
Hourly out turn : 90sqm .
Hire charges of mini hot mix plant per 10M2 = 2839.4x10= 315.49
90
VIBRATORY ROAD ROLLER
Hire charges excluding fuel charges per day. = 4720.00
Hire charges per hour = 4720/8 = 590.00
Fuel charges.(Diesel) per day 44.29 x 2.5lit= 110.73
Hire charges per day = 700.73
Hourly out turn for 25 mm thick = 400sqm
Hire charges of power roller per 10sqm = 700.73x10 = 17.52
400
BITUMEN BOILER
Hire charges excluding fuel charges per day. = 176.00
Fuel charges.(Kerosene) per day 25 x 15lit = 625.00
Hire charges per day = 801.00
Hourly out turn : 125.00 Kg
Bitumen to be spread for this work per 10 Sqm = 43Kgs
Out turn of Bitumen boiler per = 125x10Sqm = 29.07
43 Kgs
= 29.00
Hire charges of Bitumen boiler per 10sqm of = 801x10 = 34.53
8 x29
Total Hire charges for 10sqm of = 315.49 + 17.52 + 34.53= 367.54
LABOUR CHARGES
83.00 No. Mazdoor Category I 173.00 Each 14359.00
55.00 No. Mazdoor Category II 155.00 Each 8525.00
Total labour for 10sqm = 22884.00
22884 x 10 Sqm = 190.70
1200
Total hire and labour charges per 10 sqm = 367.54 + 190.7 = 558.24

Total hire and labour charges per 10 sqm = 558.24/ 10 Sqm


Emulsion and Bitumen Rates

As per sanctioned Estimate as on


Description 10/16/2011
Emulsion 60/70 80/100
Basic Price 34560.00 35265.00 34465.00
Detuct drum cost 1500.00 0.00 0.00
Sub total 33060.00 35265.00 34465.00
Excise Duty @ 14% 4628.40 4937.10 4825.10
Education Cess ON ED @ 2% 92.57 98.74 96.50
Higher secondary Education Cess ON ED @ 1% 46.28 49.37 48.25
Billable Price 37827.25 40350.21 39434.85
VAT @ 5% 1891.36 2017.51 1971.74
Total invoice value 39718.61 42367.72 41406.59
Storage Charges on basic price @ 5% 1653.00 1763.25 1723.25
Sub total 41371.61 44130.97 43129.84
397.892 Km x
371.632 Km x 1.40 x 1 = 397 Km x 0.9924 x 2 =
Conveyance 520.28 787.97
0.9924 x 2 =
789.74

41891.89 44918.94 43919.58


LS 0.11 0.06 0.42
Total 41892.00 44919.00 43920.00
Widening from Intermediate lane to Double lane at Km 22/8-24/8 of Tiruppur - Perumanallur - Kun

Estimate sanction date 14.07.2010 7/1/2010 Value of work Rs. 10,316,731.12


Tender receipt date 30.09.2010 Road Rs. 4,050,750.35
Market rate date 16.10.2010
10/1/2010 CD Rs. 6,265,980.77
Estimate Rate to Prevailing Local Market Rate - COMPARAT
Sl. Estimate rate per Local Rate per MT
Item Quantity Difference
No. MT

1 Bitumen Emulsion 0.00 MT 29260.00 /MT 28580.00 /MT -680.00 /MT

2 Bitumen 60/70 Grade 0.00 MT 28095.00 /MT 27005.00 /MT -1090.00 /MT

3 Bitumen 80/100 Grade 0.00 MT 27295.00 /MT 26205.00 /MT -1090.00 /MT

4 Cement 0.00 MT 4700.00 /MT 5600.00 /MT 900.00 /MT

5 Steel 0.00 MT 36000.00 /MT 37500.00 /MT 1500.00 /MT

. Total
of Tiruppur - Perumanallur - Kunnathur -Perundurai road

Rs. 0 0.00%
Rs. 0 0.00% 3.00%
Rs. 0 0.00%
cal Market Rate - COMPARATIVE STATEMENT
Value of work put to
Amount Percentage
tender

Rs. 0 Rs. 10,316,731.12 0.000%

Rs. 0 Rs. 10,316,731.12 0.000%

Rs. 0 Rs. 10,316,731.12 0.000%

Rs. 0 Rs. 19,197,636.00 0.000%

Rs. 0 Rs. 19,197,636.00 0.000%

Rs. 0 Rs. 10,316,731.12 0.000%


Widening from Intermediate lane to Double lane at Km 22/8-24/8 of Tiruppur
road

Bitumen Emulsion,Bitumen,Cement and S

Sl.No. Item

1 Vibrated Cement Concrete M15 grade Nominal mix 1:2:4 using 40mm

2 Vibrated Cement Concrete M15 grade Nominal mix 1:2:4 using 40mm

3 reinforced cement concrete cast in situ bored piles of 1000mm


diameter M-35 grade Design mix
4 Cement concrete M10 (Nominal mix 1:3:6) using 40mm

5 Vibrated reinforced cement concrete M30 using machine crushed ISS


size HBG graded metal of 20mm and below
6 Vibrated Cement Concrete M15 grade using 40mm

7 Vibrated reinforced cement concrete M30 (Design mix) using graded


metal 20mm and below
8 Vibrated reinforced cement concrete M30 (Design mix) using ISS, HBG
graded metal of 20mm and below
9 Vibrated reinforced cement concrete design mix M 35 using 20mm and
below
10 Vibrated reinforced cement concrete M35 (Design mix) using crushed
ISS, hard broken granite graded metal 20mm and below
11 Vibrated reinforced cement concrete design mix M35 using 20mm and
below
12 Vibrated cement concrete of grade M40 (Design mix) using 20mm ISS
metal,
13 Vibrated cement concrete M15 using 40mm ISS
14 Virbrated reinforced cement concrete M25 (Design mix) using crusher
ISS, HBG graded metal of 20mm and below
15 Vibrated cement concrete M30 (Design mix) using 25mm, 12mm and
6mm IRC OVER DECK SLAB AND APPROACH SLAB.
16 Vibrated Cement concrete M15 grade Nominal Mix 1:2:4 using 40mm
17 Vibrated Cement concrete M15 grade Nominal Mix using 40mm
1 Providing and driving in position permanent MS liners including cost of
6mm thick plate
2 Supply and fabrication of Steel Grade S.415 required for all RCC items
of works
3 Supply and fabrication of Fe-240 Steel for MESH REINFORCEMENT.
1 Tack coat using emulsion bitumen at the rate of 4 kg per 10sqm over
the WBM
2 Providing laying and Compacting open graded Premix carpet 20
mm thick premixed with 60/70 Grade
3 Prime coat using emulsion bitumen at the rate of 6 kg per 10sqm over the WMM
4 Tack coat using emulsion bitumen at the rate of 2.5kg per 10sqm over the
WMM
5 Tack coat using emulsion bitumen at the rate of 3 kg per 10 sqm over the BT
surface
6 Tack coat using emulsion bitumen at the rate of 2.5 kg per 10 sqm over the
BM/DBM
7 Advance patch using 45mm metal with 44 Kg of 80/100 grade bitumen
8 Advance patch using 13.2mm metal with 44 Kg of 80/100 grade bitumen
9 Dense Bituminous macadam of 50 mm thickness premixed with bituminous
binder 60/70 grade at the rate of 3.5 percent by weight
10 Bituminous macadam of 50 mm thickness premixed with bituminous binder
60/70 grade at the rate of 3.5 percent by weight
11 25 mm thick compacted Semi dense bituminous concrete using
60/70 grade bitumen
12 Dense Bituminous macadam of 75 mm thickness premixed with bituminous
binder 60/70 grade at the rate of 3.5 percent by weight
13 Bituminous macadam of 75 mm thickness premixed with bituminous binder
60/70 grade at the rate of 3.5 percent by weight

ABSTRACT

1 Bitumen Emulsion
2 Bitumen 60/70 Grade
3 Bitumen 80/100 Grade
4 Cement
5 Steel
e at Km 22/8-24/8 of Tiruppur - Perumanallur - Kunnathur -Perundurai

mulsion,Bitumen,Cement and Steel

Quantity Adequacy of Cement, Steel and Bitumen

0.45X(1.44/2)X= 0.00 MT

0.45X(1.44/2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/3)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/1.2)X= 0.00 MT

0.45X(1.44/2)X= 0.00 MT

0.45X(1.44/1.5)X= 0.00 MT

0.0408X= 0.00 MT

0.45X(1.44/2)X= 0.00 MT
0.45X(1.44/2)X= 0.00 MT

(4/10)X= 0.00 MT

(24.4/10)X= 0.00 MT

(6/10)X= 0.00 MT
(2.5/10)X= 0.00 MT

(3/10)X= 0.00 MT

(2.5/10)X= 0.00 MT

44X= 0.00 MT
44X= 0.00 MT

99X= 0.00 MT

76X= 0.00 MT

3X= 0.00 MT

99X= 0.00 MT

77.333X= 0.00 MT

0.00 MT
0.00 MT
0.00 MT
0.00 MT
0.00 MT

Potrebbero piacerti anche