BOQ Pekerjaan Piping & Stell Strucure Portable Steel Cooling Tower CA pla
Pekerjaan Persiapan
No Deskripsi
1 Mobilisasi & demobilisasi
2 Tools ( Including Heavy LiGing tools if needed ) & safety
3 Pekerjaan Dismantling Roof water basin
Total
Total
Pengadaan Material Stell Strucure & Pipe Support
No Deskripsi
1 H beam 200x200x12 mm = 12 m
2 UNP 200x80x7.5 mm L= 6 m
3 Equal Angle 75x75x8 L= 6 m
4 WF 300X150X6,5X9 mm = 12 m
5 Plate 4’x 8’ x 9 mm
6 Plate 4’ x 8’ x 20 mm
7 Chemical Anchor M20x200 ( Double Nut )
8 Chemical Anchor M22x200 ( Double Nut )
9 Hexagon Bolt A325M M22X50 Include Bolt & Washer
10 U Bolt 24”
11 U Bolt 16”
12 U Bolt 10”
Fabrication & Erection Stell Strucure & Pipe Support ( Include HotDip Galvanize for Coating All surface
No Deskripsi
1 H beam 200x200x12 mm = 12 m
2 UNP 200x80x7.5 mm L= 6 m
3 Equal Angle 75x75x8 L= 6 m
5 WF 300X150X6,5X9 mm = 12 m
6 Plate 4’x8’x9 mm
7 Plate 8’x8’x20 mm
Total
Pekerjaan painting
No Deskripsi
1 touch up paint Existing Steel Struktur
2 Painting Piping
Total
Note : Type Polyuretane, Thikness 300 micron ( Primer 75
micron, Intermediate 150 micron & Top Coat 75 Micron )
Concrete Work Mutu k300 Semen Tipe V ( Include earth work & Bekisting
No Deskripsi
1 Foundation type 1
2 Foundation type 5
3 Foundation type 6
4 Foundation type 7
Total
Prepare by Check By Approve By
Miko Satria Danang CR Didit S
n Piping
Quantity Satuan Supply By
1497 Kg Contractor
2641 Kg Contractor
1005.12 Kg Contractor
641.28 Kg Contractor
363.6 Kg Contractor
350.4 Kg Contractor
672 Kg Contractor
255.2 Kg Contractor
768 Kg Contractor
12554 Kg Contractor
618 Kg Contractor
928 Kg Contractor
70.5 Kg Contractor
39.06 Kg Contractor
116.3 Kg Contractor
87.4 Kg Contractor
22607 Kg
g Piping
Quantity Satuan Supply By
160 Dia Inch Contractor
120 Dia Inch Contractor
608 Dia Inch Contractor
360 Dia Inch Contractor
alvanize for Coating All surface Stell Strucure & Pipe Support )
ell Strucure
Quantity Satuan Supply By
2750 Kg Contractor
nting
Quantity Satuan Supply By
96 M2 Contractor
102 M2 Contractor
198 M2
Concrete
Quantity Satuan Supply By
5 ea Contractor
8 ea Contractor
1 ea Contractor
idit S