1 PRELIMINARIES 1 LOT
6,982,305.29
2 LAYOUT / STAKE OUT 1 LOT
3,331,698.09
3 EXCAVATION 1 LOT
4,973,356.80
4 BACKFILL AND COMPACTION 1 LOT
2,531,769.23
5 HAULING AND DISPOSAL 1 LOT
1,823,564.16
6 GRAVEL BEDDING 1 LOT
1,525,890.52
7 CONCRETING 1 LOT
11,987,482.50
8 FORMWORKS 1 LOT
1,706,511.83
9 REINFORCEMENT BARS 1 LOT
5,338,220.12
10 150 MM THK CHB WALL 1 LOT
12,325,045.33
11 PLASTERING 1 LOT
12,152,055.83
12 SAND BLASTING 1 LOT
5,951,783.37
13 100MM X 100MM WEEPHOLES 1 LOT
3,169,320.84
14 GRILL FENCE 1 LOT
3,200,996.09
TOTAL CONSTRUCTION COST
TOTAL % ACCOMPLISHMENT