Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TOTAL………………………….. Birr
2,810,760.00
1,772,456.00
3,123,200.00
1,215,241.58
20,540.00
2,863,131.74
2,462,796.00
1,012,537.50
15,280,662.82
15,280,662.82
1. EARTH WORK
1.1 Site clearance to a maximum depth of 20cm m2 9054 25.00
1.4 Ditto as item 1.3. but not exceeding 3.0mts m3 160 90.00
1.5.1 Ditto as item No.1.5 but, to the depth of 1.50 -3.00m m3 329 90.00
All drainage and culvert works are as per detail attatched detail
drawing specification.
Page 3 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Page 4 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
2.3 Ditto, but with 200mm mass concrete cover above crown of
PVC pipe. This shall be executed for all road crossing pipes
a . 150mm diameter m 320 1,081.00
b . 300mm diameter m 0
3.SWITCHYARD FOUNDATION
Page 5 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Page 6 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Provide, cut and fix in position 25mm thick swan Zigba wood
3.5 formwork for switchyard foundation with fair faced at top part
(as per the drawings)
3.5.1 For Gantries & shield wire foundations m2 149 385.00
4. CABLE TRENCH
Page 7 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
4.2.3 Cable trench type CT3 size (800X800)mm No. 192 639.00
Page 8 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
5. METAL WORK
Only fixing of rails and grouting with concrete C-30 (as
5.1 specified in item 3.3) complete with anchors according to detail m2 3
drawing. Materials includes rail, connection or bed plates,
anchor etc., shall be supplied by others. 1,200.00
6. ROAD
6.1 Bulk Excavation for average depth of 600mm m3 1233 90.00
Page 9 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Form work
wooden or metal sheet form work in two directions.The price m2 568
includes transporting, fixing and handling of formwork. 385.00
Page 10 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Page 11 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS
Page 12 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
226,350.00
236,070.00
55,620.00
14,400.00
89,370.00
29,610.00
1,636,250.00
242,165.00
280,925.00
2,810,760.00
1,225,440.00
Page 13 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
26,880.00
61,800.00
Page 14 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
345,920.00
70,560.00
41,856.00
1,772,456.00
13,910.00
1,430.00
28,990.00
470,850.00
226,300.00
Page 15 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
1,131,500.00
14,600.00
Page 16 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
16,200.00
57,365.00
16,555.00
210,210.00
770.00
66,816.00
38,304.00
80,352.00
46,784.00
42,336.00
489,184.00
167,744.00
3,000.00
3,123,200.00
Page 17 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
36,660.00
9,600.00
21,600.00
460,800.00
345,000.00
5,568.00
7,440.00
122,688.00
74,888.00
Page 18 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
39,165.18
47,040.00
9,500.00
35,292.40
1,215,241.58
3,600.00
2,365.00
14,575.00
20,540.00
110,970.00
104,805.00
1,209,780.00
151,222.50
Page 19 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
797,230.08
209,592.00
218,680.00
20,288.00
40,564.16
2,863,131.74
26,280.00
138,000.00
Page 20 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
435,918.00
13,248.00
Page 21 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS
TOTAL PRICE
40,000.00
10,000.00
773,800.00
151,050.00
742,000.00
132,500.00
2,462,796.00
252,525.00
760,012.50
1,012,537.50
Page 22 of 22