BUTAJIRA 132kV PTP

SUMMARY OF BOQ FOR BUEI SUBSTATION SWITCHYARD CIVIL WORKS

1 EARTH WORK ………………………………………. Birr

2 DRAINAGE SYSTEM AND CULVERT CONSTRUCTI Birr

3 SWITCHYARD FOUNDATION ……………………… Birr

4 CABLE TRENCHES …………………………………. Birr

5 METAL WORKS ……………………………………… Birr

6 ROAD CONSTRUCTION ……………. Birr

7 FENCE, GATES AND RETAINING WALL………………… Birr

8 SURFACING FINISH WORKS ……………………… Birr

TOTAL………………………….. Birr

GRAND TOTAL Birr

Summary switch yard CW


YARD CIVIL WORKS

2,810,760.00

1,772,456.00

3,123,200.00

1,215,241.58

20,540.00

2,863,131.74

2,462,796.00

1,012,537.50

15,280,662.82

15,280,662.82

Summary switch yard CW


BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

1. EARTH WORK
1.1 Site clearance to a maximum depth of 20cm m2 9054 25.00

Bulk excavation in an ordinary soil to a depth not exceeding the


1.2 m3 2623
design lelvel. 90.00

1.3 Excavation for equipment foundations to a maximum depth of m3 618


1.5m 90.00

1.4 Ditto as item 1.3. but not exceeding 3.0mts m3 160 90.00

Excavate trenches for the stripped masonry retaining wall


1.5 m3 993
foundation in ordinary soil to a depth not exceeding 1.5m. 90.00

1.5.1 Ditto as item No.1.5 but, to the depth of 1.50 -3.00m m3 329 90.00

Backfill with non expansive granular excavated material and


1.6 m3 4250
well ram in layers not exceeding 20cm thick. 385.00

1.7 Ditto as item No.1.6 but, arround foundations m3 629 385.00

1.8 Cartaway surplus excavated material at a distance not m3 3305


exceeding 1 km from the site 85.00

TOTAL CARRIED TO SUMMARY

2. DRAINAGE AND CULVERT SYSTEM

All drainage and culvert works are as per detail attatched detail
drawing specification.

Construct trapezoidal open channel ditches in ordinary soil


made of roughly dressed hard stone massonary, internally
2.1
pointed with cement sand mortar, price includs all necessary
works and materials as per detail technical drawing
specification per unit metre length.
2.1.1 Size 130 x 100 x 100cm for section Y - Y m 370 3,312.00

Page 3 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

Construct open channel made of 1/2 precast concrete pipe,


2.2 50mm sand or red ash bed for switchyard drainage system, unit
price shall include all necessary works and materials
1/2 dim. 300 mm m 56 480.00
1/2 dim. 400 mm m 103 600.00

Page 4 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

2.3 Ditto, but with 200mm mass concrete cover above crown of
PVC pipe. This shall be executed for all road crossing pipes
a . 150mm diameter m 320 1,081.00
b . 300mm diameter m 0

Construct 130 x 100 cm rienforced concrete cover on road


2.4 crossing channel in the switchyard compound with in each 0.5 No.
width, unit price include all civil works and materials 14.00 5,040.00

Construct rectangular rienforced concrete channel for road


2.5 crossing class C30 (minimum cement content of 400kg/m3) with
sizes 115cm heigtht and 130cm width on the main entrance,
unit price includees all civil works and materials. m 6.00 6,976.00

TOTAL CARRIED TO SUMMARY

3.SWITCHYARD FOUNDATION

Supply and pouring of 5 cm. thick lean concrete in concrete


3.1 class C-5 under all switchyard foundation with minimum
cement content of 180 kg/m3including any necessary
formworks.

3.1.1 For Gantries and shield wire foundations m2 107 130.00

3.1.2 For transformer and reactors m2 11 130.00

3.1.3 For other equipment foundations m2 223 130.00


Rienforced concrete class C30 with minimum cement content of
400kg/m3 filled in to formwork & vibrated around steel
3.2 reinforcement for switch yard foundation. Visible part of
foundation (as indicated in the foundation drawings) to be
smooth surface and ste

3.2.1 For Gantries & shield wire foundations m3 129 3,650.00

3.2.2 For transformer foundations and reactor m3 62 3,650.00

Page 5 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

3.2.3 For other Equipment foundations m3 310 3,650.00

Rienforced concrete class C30 with minimum cement content of


3.3 400kg/m3 filled in to formwork & vibrated around steel m3
reinforcement for pits terminal cabinet foundation, form work
and steel reinforcement measured separately. 4.00 3,650.00

Page 6 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

Construct smooth cement-sand screed with (1:3) rich of cement


3.4 on top of foundation surfaces in switchyard keeping gentle m2
slopes as per the drawings , works to be done in the best manner
and first quality requirements. 72.00 225.00

Provide, cut and fix in position 25mm thick swan Zigba wood
3.5 formwork for switchyard foundation with fair faced at top part
(as per the drawings)
3.5.1 For Gantries & shield wire foundations m2 149 385.00

3.5.2 For transformer foundations and reactor m2 43 385.00

3.5.3 For other Equipment foundations m2 546 385.00

3.5.4 For pits and terminal cabinates m2 2 385.00


Steel Reinforcement according to structural drawing, price
includes cutting, bending, placing in position and tying with
3.6
wires.

3.6.1 Diameter 8mm Deformed bar kg 2088 32.00

3.6.2 Diameter 10mm Deformed bar kg 1197 32.00

3.6.3 Diameter 12mm Deformed bar kg 2511 32.00

3.6.4 Diameter 14mm Deformed bar kg 1462 32.00

3.6.5 Diameter 16mm Deformed bar kg 1323 32.00

3.6.6 Diameter 20mm Deformed bar kg 15287 32.00

3.6.7 Diameter 24mm Deformed bar kg 5242 32.00

Supply and Laying of river stone size 50-100mm over


3.7 Transformer and Shunt reactor grids as per detail drawing & m3
technical specification. 2 1,500.00

TOTAL CARRIED TO SUMMARY

4. CABLE TRENCH

Page 7 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

Supply and pouring of 5 cm thick lean concrete in concrete class


4.1 C-5 under all Cable trenches with minimum cement content of m2
150 kg/m3 including any necessary formworks. 282.00 130.00

Construct "U" shape Cable trench in reinforced concrete class


C25(with minimum cement content of 360kg/m3) filled into
4.2 formwork and viberated arround steel reinforcement ,All edges
to be sharp and strictly in line,smooth and uniform. Price
includes excavation. (This unit cost is prepared based on your
cable trench design for Gidaayana S/S.)
4.2.1 Cable trench type CT1 size (400X400)mm mt. 8 1,200.00

4.2.2 Cable trench type CT2 size (600X600)mm mt. 8 2,700.00

4.2.3 Cable trench type CT3size (800X800)mm mt. 96 4,800.00

4.2.4 Cable trench type CT4size (1000X1000)mm mt. 46 7,500.00

Precast 10cm thick reinforced concrete class C25 (with min.


cement of 360kg/m3) filled in to form work & vibrated around
4.3 steel reinforcement for cable channel covers with lifting handles
as per detail drawing, all covers should be sharp edged and
smooth.(Assuming each trench cover has a maximum width of
50cm.)
4.2.1 Cable trench type CT1 size (400X400)mm No. 16 348.00

4.2.2 Cable trench type CT2 size (600X600)mm No. 16 465.00

4.2.3 Cable trench type CT3 size (800X800)mm No. 192 639.00

4.2.4 Cable trench type CT4 size (1000X1000)mm No. 92 814.00

Construction of Duct Banks (Cable passage under road) diamter


4.4 110mm PVC pipes bedded layer by layer in mass concrete class m 300
C25 (with min. cement content of 360kg/m3) lay the PVC pipes
in three raws 4 pipes in a raw for all Ducts unless specified and
for reinforcement as per drawing technical specication

Page 8 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

4.4.1 Duct bank for road width 4m No. 3 13,055.06


4.4.2 Duct bank for road width 5m No. 3 15,680.00

Construct concrete man hole with connecting pipes as per No. 1


4.5 specified technical drawing. 9,500.00
Supply and lay diameter 50 mm PVC pipe for earthing
conductor where the earthing conductor crosses the road. Price
4.6 includes excavation of trench to an depth of 70 cm, backfilling m
and compacting.
143.00 246.80

TOTAL CARRIED TO SUMMARY

5. METAL WORK
Only fixing of rails and grouting with concrete C-30 (as
5.1 specified in item 3.3) complete with anchors according to detail m2 3
drawing. Materials includes rail, connection or bed plates,
anchor etc., shall be supplied by others. 1,200.00

Supply and erection where necessary works 50 x50 x5 mm


kg
5.2 profiles complete with anchor according to detail drawing. 43.00 55.00

Supply and laying of steel grating of movable type made of


5.3 diameter 16 mm steel bars c/c 20cm both side as per the detail kg
drawing. 265.00 55.00

TOTAL CARRIED TO SUMMARY

6. ROAD
6.1 Bulk Excavation for average depth of 600mm m3 1233 90.00

Remove and spread surplus excavated materials to a distance of m3 1233


6.2 1km 85.00

6.3 Hard core


250mm thick hard core filling m3 1551 780.00

6.4 crushed aggregate


60mm thick crushed aggregate above the hard core m3 1551 97.50

Page 9 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

6.5 Road concrete slab


150mm thick concrete slab with cement sand mortar (1:3) ratio m3
(c-25) 218.4192 3,650.00

Construction of Curb Stone


Curb stone constructed from a well vibrated plain concrete of C- m 568
6.6 25 as per the drawing., 369.00

Form work
wooden or metal sheet form work in two directions.The price m2 568
includes transporting, fixing and handling of formwork. 385.00

6.7 Road Reinforcement Bars


Total Reinforcement weight for 8 mm dia. bar kg 634 32.00
Total Reinforcement weight for 10 mm dia. bar kg 1267.63 32.00

TOTAL CARRIED TO SUMMARY

7. FENCE, GATES AND RETAINING WALL

As per the technical specification, design and the Engineers


requirement, the substation fence and gates will be erected
around substation as per the corresponding drawings.

Construction of main gate posts made of well dressed and


7.1 pointed masonary stone column with the crossection of 80X80
cm, Price includes excavation, backfill, Removal of the excess
excavated material and grouting with concrete, and carrying
out all the ne No. 2.00 13,140.00

Supply and erect galvanized circular tube posts with


7.2 Ø76mmX2.5mm (length 3,0 mt the top 50cm cranced at 45°)
around the substation fence on the retaining wall every 2.5
mts, Price includes C-20 mass concrete base casting. No. 138.00 1,000.00

Page 10 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

Supply and construct fence out of (40x40x3mm) galvanized


7.3 wire mesh fasten with the post by steel plate (40 x 3mm)
according to the detail drawing m2 679.00 642.00
Supply & fix galvanized barbed wire on inclined
7.4 arms(length0.50 m) of the fence'posts of substation switchyard
four rows as per the design drawing. m 138.00 96.00

Page 11 of 22
BUEI - BUTAJIRA132kV PTP
BUEI 132kv SUBSTATION SWITCHYARD CIVIL WORKS

ITEM DESCRIPTION UNIT QTY UNIT RATE

Main gate as per to the corresponding detail drawings and


7.5 width:
a) width 5m No. 1.00 40,000.00
b) width 1m No. 1.00 10,000.00

7.6 RETAINING WALL

Stone masonry retaining wall as a fence around the switchyard,


as per corresponding drawings and construct a weep hole for
every 10 m length of the wall and expansion joints every 25 mts
as per detailed attatched drawing specification.
for 1.5m height
a) below ground level m3 292.00 2,650.00
b) above ground level m3 57.00 2,650.00

for 3.0m height


a) below ground level m3 280.00 2,650.00
b) above ground level m3 50.00 2,650.00

TOTAL CARRIED TO SUMMARY

8. SURFACING FINISH WORKS


Setting and trimming of slopes of any grade for drainage
8.1 system, including any necessary leveling, compaction as per
drawing over all switchyard area.(Site Levelling Work)
m2 7,215.00 35.00

8.2 Spread gravel size of 10 -30 mm finishing all over switchyard


area minimum of 10 cm thick m2 7,795.00 97.50

TOTAL CARRIED TO SUMMARY

Page 12 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

226,350.00

236,070.00

55,620.00

14,400.00

89,370.00

29,610.00

1,636,250.00

242,165.00

280,925.00

2,810,760.00

1,225,440.00

Page 13 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

26,880.00
61,800.00

Page 14 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

345,920.00

70,560.00

41,856.00

1,772,456.00

13,910.00

1,430.00

28,990.00

470,850.00

226,300.00

Page 15 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

1,131,500.00

14,600.00

Page 16 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

16,200.00

57,365.00

16,555.00

210,210.00

770.00

66,816.00

38,304.00

80,352.00

46,784.00

42,336.00

489,184.00

167,744.00

3,000.00

3,123,200.00

Page 17 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

36,660.00

9,600.00

21,600.00

460,800.00

345,000.00

5,568.00

7,440.00

122,688.00

74,888.00

Page 18 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

39,165.18
47,040.00

9,500.00

35,292.40

1,215,241.58

3,600.00

2,365.00

14,575.00

20,540.00

110,970.00

104,805.00

1,209,780.00

151,222.50

Page 19 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

797,230.08

209,592.00

218,680.00

20,288.00
40,564.16

2,863,131.74

26,280.00

138,000.00

Page 20 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

435,918.00

13,248.00

Page 21 of 22
UTAJIRA132kV PTP
ON SWITCHYARD CIVIL WORKS

TOTAL PRICE

40,000.00
10,000.00

773,800.00
151,050.00

742,000.00
132,500.00

2,462,796.00

252,525.00

760,012.50

1,012,537.50

Page 22 of 22