Material SChedule
225

225
1
SECTION 1A-1A Lean ConCrete C-5 10mm ThiCk 9.61
450
450 350 Detail of AnChor Bolt 2 C-30 ConCrete Column 1.7415
105 240 105
300 SCALE 1:1

105 240 105


3 3.6
450

450
300 C-30 ConCrete Footing
L=1150

450
L=1500

450
350
4 BaCkfill Selected Material 14.465
5 Formwork 14.76
225

225
900

900 900 SECTION 1-1 DETAIL D1 ReinforCement Bar SChedule


Total Unit Total
Length
Item Bar Bar Shape Qty Length Weight Weight
(mm)
(mm) (m) (kg/m) (kg)

250
A 16 1550 12 2025 24.3 1.579 35.34

225
1650
FOUNDATION PLAN 450
1200
750 450
350 350

300

300
B 12 2900 2*15 3500 105 0.888 165.795
105 240 105 105 240 105

105 240 105


105 240 105
C 12 2900 2*15 2900 87 0.888 165.795

450
350

450
350
1650
1200
450 750 450 50 50
y

350
D 8 6 1500 11.4 0.395 4.5
50 50 50 50 350
50

50

50

50
150

350

1650
1200
750
x

600
o E 16 12 1300 15.6 1.579 24.63
450 450 350
350 350
800

105 240 105 105 240 105 50 50

105 240 105

105 240 105


1100

800
C' 8 3 3300 10.5 0.395 4.15
800

450

450
350

350
1750

225 225 225 225 50


50

125
G 8 6 1150 7.8 0.395 3.08
300

400

450 300 450


100 400
500

Note:-
C-5 Lean ConCrete
-All dimensions are in mm.
50
50 3000 -ColumnConCrete grade C-30
3100
VIEW 2-2 -Steel grade s-300
SECTION A-A
-ConCrete Cover for footings -50mm
-ConCrete Cover for Columns -25mm

Biniam Shawul
DRAWN BY
ETHIOPIAN ELECTRIC UTILITY BUEE SUBSTATION
DESIGNED BY Biniam Shawul UNIVERSAL ELECTRIC ACCESS PROGRAM POWER TRANSMISSION PROJECT
CHECKED BY DATE Title:- 132KV INCOMING LINE GANTRY SCALE 1:20
Abdulmelik Adem BUTAJIRA-BUEE AND YABELLO PROJECT
FOUNDATION PLAN, BAR & MATERIAL SCHEDULE PAGE 1/1
132KV INCOMING
APPROVED BY Behailu Ayele MAY, 2016 FOR BIDDING PURPOSE ONLY DWG.No ME-GA-01
LINE GANTRY FOUNDATION