SCHEDULE OF COLUMN SCHEDULE OF FOOTING

FOOTING DIMENSIONS IN MILLIMETERS STEEL REINFORCEMENTS


C1 C3 C4 (mm) (BOTTOM BARS)

FOOTING HEIGHT REMARKS


MARK THICKNESS(T) (H)
2-160
2-160 2-160 LENGTH (L) WIDTH(W) BAR "A" BAR "B"
SIZE : 150 X 400 MM SIZE : 150 X 350 MM SIZE : 150 X 350 MM

F-1 1000 1000 300 1200 PLAN 'B'


2-120 1 @ 50MM, 1 @ 50MM,
1 @ 50MM,
4 @ 100MM & REST 4 @ 100MM & REST
4 @ 100MM & REST
250MMON CENTER 250MMON CENTER
250MMON CENTER
2-160 2-160 2-160 F-2 1200 1200 300 1200 PLAN 'A'

GROUND FLOOR TO ROOF BEAM GROUND FLOOR TO SECOND FLOOR SECOND FLOOR TO ROOF BEAM

"ARCHITECTURE LAW
OF THE PHILIPPINES"
REPUBLIC ACT 9266
ARTICLE 2, SECTION 25:
DRAWINGS & SPECIFICATIONS DULY
SIGNED, STAMPED & OR SEALED AS

Parsons Firm Parsons Design Firm CE-304


INSTRUMENTS OF SERVICE ARE THE
PROPERTIES & DOCUMENTS OF THE
ARCHITECT, WHETHER THE PURPOSE
FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE
UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF
THE ARCHITECT OR AUTHOR OF SAID
DOCUMENTS TO DUPLICATE OR MAKE
09541258254 09541258254 COPIES OF SAID DOCUMENTS FOR USE
IN THE REPITITION OF & FOR OTHER
parsons@gmail.com parsons@gmail.com PROJECTS OR BUILDING, WHETHER
EXECUTED PARTLY OR IN WHOLE

Potrebbero piacerti anche