Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
0 1/23/2018 one
REV. DATE NAME CHANGES
SMK N 1 BEJI REVISION
SISWA SMK N 1 BEJI JL. WICAKSANA NO 22B GN. GANGSIR
BEJI - PASURUAN 0
CONTRACT : User data 1 SCHEME
SISWA SMK N 1 BEJI
1 User data 2 01
Document realized with version : 2014.0.5.8
1
Drawing Function Location Revision Date Created by Designation Folder mark Folder designation
REVISION
SMK N 1 BEJI PUTAR MOTOR 3 FASA SATU ARAH
JL. WICAKSANA NO 22B GN. GANGSIR 0
0 1/23/2018 one
BEJI - PASURUAN
REV. DATE NAME CHANGES SCHEME
CONTRACT: 1
LOCATION:
+L1 LAB CONTROL DAN INSTRUMENTASI
User data 1
SISWA SMK N 1 BEJI
User data 2
02
Document realized with version :2014.0.5.8
1 2 3 4 5 6 7 8 9 10
In = 6 A In = 4 A
-KONTAKTOR1
In =
-EMERGENCY1 -L21
-SW PB STOP1
-RT1
In =
-MOTOR 3 FASA1
P=
-SW PB STAR1
SolidWorks Electrical
REVISION
SMK N 1 BEJI PUTAR MOTOR 3 FASA SATU ARAH
JL. WICAKSANA NO 22B GN. GANGSIR 0
0 1/23/2018 one
BEJI - PASURUAN
REV. DATE NAME CHANGES SCHEME
CONTRACT: 1
LOCATION:
+L1 LAB CONTROL DAN INSTRUMENTASI
User data 1
SISWA SMK N 1 BEJI
User data 2
03
Document realized with version :2014.0.5.8
1 2 3 4 5 6 7 8 9 10
N L1-0
R
L2-0
S
T L3-0
L1-0
L1-0
-MCB 1 FASA2
2A
-MCB 3 FASA2
L1-0
-PB EMERGENCY1
L1-0 L1-0
1
2 95
-OVER LOAD1
1 3 5
96 -KONTAKTO2
3A
14 98
2 4 5
1 1 1
-SW PB STOP1 -U1 -V1 -W1
3HP
-MOTOR 3 FASA2
A1 M
-KONTAKTOR2
-LAMP11 -LAMP12
A2
SolidWorks Electrical
N
E
REVISION
SMK N 1 BEJI PUTAR MOTOR 3 FASA SATU ARAH
JL. WICAKSANA NO 22B GN. GANGSIR 0
0 1/23/2018 one
BEJI - PASURUAN
REV. DATE NAME CHANGES SCHEME
CONTRACT: 1
LOCATION:
+L1 LAB CONTROL DAN INSTRUMENTASI
User data 1
SISWA SMK N 1 BEJI
User data 2
04
Document realized with version :2014.0.5.8