ORIGEN DESTINO DV (km)

HUANCAYO TAYACAJA 70
TAYACAJA QUISHUAR 40

DISTANCIA HYO QUISHUAR 110


CALCULO DEL FLETE

A - POR PESO EN MATERIALES


A.1.- EN MATERIALES DE CONSTRUCCION
MATERIALES UNIDAD CANTIDAD
Materiales de Construcciòn
ASFALTO RC-250 gal 831.72
ALAMBRE NEGRO N° 16 kg 463.03
ACERO fy = 4200 kg/cm2 GRADO 60 DE 5/8" kg 11,451.61
CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.16
CLAVOS PARA MADERA CON CABEZA DE 3" kg 1,078.48
CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.68
ABRAZADERA PARA TUBERIA MATRIZ und 226.00
MARCO DE FIERRO FUNDIDO PARA BUZON pza 28.00
MARCO y TAPA DE FIERRO GALVANIZADO PARA MEDIDOR 1/2" - 3/4" und 226.00
TAPA CON MARCO FIERRO FUNDIDO PARA DESAGUE 12" X 24" pza 226.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 24,341.63
YESO BOLSA 20 kg bol 567.46
TACHO DE BASURA METALICO S/DISEÑO und 18.00
CAJA DE CONCRETO PREFABRICADA DE DESAGUE DE 12" X 24" und 226.00
PEGAMENTO PARA PVC gal 30.90
LUBRICANTE PARA PVC gal 15.45
MADERA TORNILLO p2 47,054.75
PINTURA PARA TRAFICO gal 167.16
DISOLVENTE XILOL gal 33.41
LLAVE CORPORATION DE 1/2" und 226.00
CAJA MEDIDOR DE CONCRETO PARA AGUA POTABLE und 226.00

Pag: 2
IMPRESION DE BANER DE OBRA und 1.00
CORDEL ROLLO 50 M pza 1,815.89
OTROS MATERIALES glb. 1.00
HERRAMIENTAS
pala, pico, Barreta, rastrillo, etc kg. 50.00
PESO TOTAL

TRANSPORTE VEHICULAR M
CAPACIDAD DEL CAMION (M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
Nº DE VUELTAS
FLETE POR M3
FLETE POR KG

FLETE POR PESO


A.1.- MATERIALES DE CONSTRUCION

CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR, DISTRITO DE QUISHUAR – TAYACAJA - HUAN
 

Pag: 3
B - POR VOLUMEN
B.1.- EN AGREGADOS
DESCRIPION UNIDAD CANTIDAD
PIEDRA CHANCADA 1/2" m3 1,262.0100
PIEDRA GRANDE DE 6" m4 308.4500
HORMIGON m5 533.3700
ARENA FINA m3 79.6700
ARENA GRUESA m3 1,238.3800
MATERIAL GRANULAR PARA SUB-BASE m3 1,741.2700
TIERRA CERNIDA m3 1,993.0400
VOLUMEN TOTAL 7,156.19
CAPACIDAD DEL CAMION (M3) 15.00
NUMERO DE VIAJES 477.08
REDONDEO 477.00

B.2.- EN TUBERIA
UNIDAD DE (2.00 M. x 6.00 M.) DE CARROCERIA, CON H= 2.00 M.
DESCRIPION CANTIDAD UNIDAD
TUBERIA UF S-25 ISO 4435 DN 200 MM INC. ANILLO 1,622.24 m
TUBO PVC - SAP 3/4" 3,452.40 m

TRANSPORTE VEHICULAR VOLUMEN AGREGADOS TRANSPORTE VEHICULAR VOLU


UNIDAD QUE DA COMPROBANTE - COSTO DE AGREGADOS PUESTO EN OBRA UNID
CAPACIDAD DEL CAMION (M3 ) volumen 15.00 CAPACIDAD DEL CAMION (M3 ) vo

Pag: 4
COSTO POR VIAJE S/. 1,800.00 COSTO POR VIAJE S/.
Nº DE VUELTAS 477.00 CAPACIDAD DEL CAMION (KG)
Nº DE VUELTAS
FLETE POR ( M3) volumen
FLETE POR M3 120.00 FLETE POR KG

FLETE POR VOLUMEN


B.1.- EN AGREGADOS
B.2.- EN TUEBERIA
T O T A L

CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR, DISTRITO DE QUISHUAR – TAYACAJA - HUAN
 

Pag: 5
CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR, DISTRITO DE QUISHUAR – TAYACAJA - HUAN
 

2- FLETE TERRESTRE

DESCRIPCION AFECTO IGV


A.- FLETE POR PESO
A.1.- MATERIALES DE CONSTRUCCION 225,226.91
B.- FLETE POR VOLUMEN
B.1.- EN AGREGADOS 0.00
B.2.- EN TUBERIA 52,000.00
COSTO TOTAL FLETE TERRESTRE S/. 277,226.91

Pag: 6
CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR, DISTRITO DE QUISHUAR – TAYACAJA - HUAN
 

Pag: 7
LETE

PESO.UNIT. PESO.TOTAL

3.66 3,044.10
1.00 463.03
1.00 11,451.61
1.00 0.16
1.00 1,078.48
1.00 0.68
1.00 226.00
65.00 1,820.00
0.50 113.00
4.00 904.00
42.50 1,034,519.28
20.00 11,349.20
10.00 180.00
60.00 13,560.00
3.78 116.80
3.78 58.40
0.65 30,585.59
3.78 631.86
3.78 126.29
0.20 45.20
40.00 9,040.00

Pag: 8
5.00 5.00
1.00 1,815.89
6,500.00 2,500.00

50.00 2,500.00
1,126,134.57

TRANSPORTE VEHICULAR MATERIALES


15
1,800.00
9,000.00
125.13
120.00
0.20

AFECTO IGV SIN IGV


S/. 225,226.91 S/. 190,870.27

RITO DE QUISHUAR – TAYACAJA - HUANCAVELICA

Pag: 9
FACTOR TOTAL
1.0000 1,262.01
1.0000 308.45
1.0000 533.37
1.0000 79.67
1.0000 1,238.38
1.0000 1,741.27
1.0000 1,993.04

26.00 m3
VOL. UNITARIO Nº de tubos VOL. TOTAL
0.018 540.75 29.20
0.011 1,150.80 37.98
VOLUMEN TOTAL 67.18
CAPACIDAD DEL CAMION (M3) 26.00
NUMERO DE VIAJES 2.58
REDONDEO 3.00

TRANSPORTE VEHICULAR VOLUMEN TUBERIAS


UNIDAD QUE DA COMPROBANTE
CAPACIDAD DEL CAMION (M3 ) volumen 26.00

Pag: 10
COSTO POR VIAJE S/. 2,000.00
CAPACIDAD DEL CAMION (KG) 9,000.00
Nº DE VUELTAS 26.00
FLETE POR ( M3) volumen 76.92
FLETE POR KG 0.22

AFECTO IGV SIN IGV


0.00 0.00
52,000.00 44,067.80
S/. 52,000.00 S/. 44,067.80

ITO DE QUISHUAR – TAYACAJA - HUANCAVELICA

Pag: 11
ITO DE QUISHUAR – TAYACAJA - HUANCAVELICA

STRE

SIN IGV

190,870.27

0.00
44,067.80
S/. 234,938.06

Pag: 12
TO DE QUISHUAR – TAYACAJA - HUANCAVELICA

Pag: 13
MOVILIZACION Y DESMOVILIZACION DE EQUIPO

A) Maquinarias pesadas trasladadas sin plataforma (equipo autotransportado)

Numero Peso
Descripción
Unidades (Tn)
1 CAMION VOLQUETE DE 15 m3 26
2 Camión Cisterna 4 x 2 (agua) 122 HP 2,000 gal
TOTAL
1
Se considera el 100% del costo de la H.M. incluido operador, combustible, lubricantes y mantenimiento

B) Maquinarias pesadas trasladadas sobre plataforma (equipo transportado)

Numero Peso
Descripción
Unidades (Tn)
1 CARGADOR SOBRE LLANTAS DE 110-115 HP 2.0-2.35 YD3 10.3
3 TRACTOR DE ORUGAS DE 190-240 HP 61.56
4 MOTONIVELADORA 130 - 135 HP 49.46
4 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 40
TOTAL 161.3
2
Se considera el 40% del costo de la H.M. por no incluir operador, combustible, lubricantes y mantenimiento

C) Maquinarias livianas (trasladadas sobre el equipo autotransportado)

Numero Peso
Descripción
Unidades (Tn)
5 ENCOFRADO METALICO STANDARD 4
1 COMPACTADORA VIBRATORIA TIPO PLANCHA 2 HP 0.1
1 BOMBA MANUAL PARA PRUEBA DE TUBERIA 0.01
2 VIBRADOR DE CONCRETO 4 HP 1.25" 0.2
1 CIZALLA ELECTRICA DE FIERRO 0.01
1 PISON DE MANO DE 25 KG 0.025
4 MEZCLADORA DE CONCRETO 11 P3 (23 HP) 20
TOTAL 24.345
3
Se considera el 40% del costo de la H.M. por no incluir operador, combustible, lubricantes y mantenimiento

CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR,


DISTRITO DE QUISHUAR – TAYACAJA - HUANCAVELICA
 
MOVILIZACION Y DESMOVILIZACION DE EQUIPO

Calculo del Costo Unitario

Distancia desde la Huancayo a la Obra :


99.0 Km
Velocidad de Transporte :
35.0 Km/h

Tiempo necesario para el transporte (Ida y Vuelta ) T= 5.7 Horas

Costo de Alquiler de Plataforma (20 Tn) = 1500.00 S/.

Peso total (ton) = 185.67

N° de Viajes (ida y vuelta) = 20.00

Costo Total Movilización y Desmovilización = 30,000.00 Nuevos Soles

CREACIÓN DE PISTAS Y VEREDAS DEL CIRCUITO PRINCIPAL DE QUISHUAR,


DISTRITO DE QUISHUAR – TAYACAJA - HUANCAVELICA
 