TANK 1
REV : SIZE :
1 A4
4 HYDROTASTIC CONDITION
* WATER PH 6 & 8.3
* BERAT FLUIDA 1010 kg/m
* POTABLE WATER MAX 21 hri
* FRESH WATER MAX 7 hri
* TEMP WATER 50 DEG C
120 DEG F
5 WIND LOAD
* WIND SPEED 126 km/hr See atch DWG TANK
* OD SHEEL PLATE 8.490 m
* TINGGI TANK 6100 m
* VERTICAL PLATE = OD X H 51.79 m
6 BUNDWALL & PONDASI TANK (tentativ) See atch DWG civil
* 12.000m x 0.150m x 1.500m
* 9.000m x 1400m x 0.100m
10 SURFACE AREA
*CONE ROOF 58.6 m2
* SHELL 163,9 m2
*BOTTOM 59.61 m2
12 CALCULATION
* WEIGHT OF TANK EMPTY 21.248 kg
* WEIGHT OF TANK FULL OF PRODUCT 345.5 kg
* WEIGHT OF TANK OF WATER 342.04 kg
* NET WORKING WEIGHT FULL OF PRODUCT 324.25 kg
* NET WORKING WEIGHT FULL OF WATER 320.8 kg
CONTRACT NO :
TBA
-
DOCUMENT NO :
XXXXXX
MECHANICAL DATA
REV : SIZE :
1 A4
total 15970.93944 kg
(tentativ)
total
(tentativ)
NOZZLE
1 Pipe 4" A 106 B SML BE sch 40 7.500m 110 kg 110 kg
2 Pipe 3" A 106 B SML BE sch 40 18.000m 204 kg 204 kg
3 24" WN FLG A 105 ASME CL # 150 3 pcs 884 kg 177 kg
4 6"WN FLG A 105 ASME CL # 150 2 pcs 86 kg 172 kg
5 4"WN FLG A 105 ASME CL # 150 2 pcs 23 kg 23 kg
total
(tentativ)
LADDER & HANDRAIL OUT
1 ROUND BAR 19 x 0.500mm ASTM A 36 15pcs
2 FLAT BAR 50 X 6000m x 10mm thk 2pcs
3 FLAT BAR 50 X 5mm thk 40.500mm
4 SUPPORT L 65 X 65 X 8mm 3.200mm
5 BASE PLAT 650mm X 300mm X 8mm 5pcs
1 GENERAL DATA
6 GEOMETRICALHEIGHT 6100 mm
7 CLIMATICDATA
10
11 OPERATING DATA
15 BLANKETINGGAS NO VISCOSITYAT cP
STORAGETE
MP.
16 BLANKETINGGASPRESSURE - kgf/cm²(g)
17 DESIGN DATA
18 CODE CORROSION - mm
BOTTOM/1°C
OURSE
19 DESIGNPRESSURE kgf/cm²(g) CORROSION - mm
OTHERCOUR
SES/ROOF
20 DESIGNTEMPERATURE °C
21 MATERIALS
24 INTERNALPROTECTION YES
25 ACCESSORIES
26 HEATINGCOIL NO COOLINGRING NO
27 ROOFINSULATION NO FOAMCHAMBERS NO
30 SUCTIONHEATER NO JETMIXER NO
31 GAUGINGANDSAMPLINGHATCH NO
32 EXTERNALBOARDLEVELINDICATOR NO
33 REFERENCEDATASHEETS
34 HEATINGCOIL-
35 MIXER -
36 SUCTIONHEATER-
37 JETMIXER -
38 NOTES
42
43
44
45
46
47
48
49
50
2 0F 2
CONTRACT NO :
TBA
-
DOCUMENT NO :
XXXXXX
LINING SYSTEM
REV : SIZE :
1 A4
LINING SYSTEM
NO
EXPOXY RESIN
1 PRIMER
* WORK PLACE WORK SHOP
* MATERIAL EPOXY RESIN ZINC RICH
* COATING METHODE Manual
* DRY FILM THICKNES 30
2 TOP COAT
* WORK PLACE WORK SHOP
* MATERIAL EPOXY RESIN
* COATING METHODE SPRAY
* DRY FILM THICKNES 220
* NUMBER OF COAT 1 or MORE
4 REPAIR
* FIELD
* SURFACE PREPARATION
MATERIAL SURFACE
THICKNES SURFACE
* MATERIAL
* DRY THICKNES
* NUMBER OF COAT
* COATING METHODE
PAINTING SYSTEM
1 SURFACE PREPARERATION
* WORK PLACE MILL SHOP
* GRADE (SSPC) SP 10
* ROUGHNESS 0.17 or
PAINT MANUFACTOR
RECOMMENDATION
2 SHOP PRIMER
* WORK PLACE FIELD
* PAINT IMORGANIC ZINC
* DRY FILM THICKNES 65
* NUMBER OF COAT 1
* APLICATION METHODE SPRAY
4 PRIMER
* WORK PLACE FIELD
* PAINT HIGH SOLID EPOXY
* DRY FILM THICKNES 125
* NUMBER OF COAT 1 or MORE
* APLICATION METHODE SPRAY
5 TOP COAT
* WORK PLACE FIELD
* PAINT ALIPHATIC POLY
URETHANE
* DRY FILM THICKNES 50
* NUMBER COAT 1 or MOER
* APLICATION METHODE SPRAY,BRUSH,ROLLER
* TOTAL DRY FILM THICKNES MIN 175
(M = MICRONS)
7 PRIMER
* PAINT HIGH SOLID EPOXY
* DRY FILM THICKNES 125
* NUMBER COAT 2 or MORE
* APLICATION METHODE BRUSH,ROLLER
8 TOP COAT
* PAINT ALIPHATIC POLYURETHANE
* DRY FILM THICKNES 2 or MORE
* APLICATION METHODE BRUSH,ROLLER
REMAKS =
* THE SHOP PRIMER SHALL BE APPLIED TO ALL SURFACE (NOT ONLY TANK EXTERNALSURFACE,BUT ALSO TANK
INTERNAL & UNDER BOTTOM SURFACE
* THE PURPOSE OF RE SURFACE PREPARATION IS TO REMOVE RUST WHITE RUST,DIRTDUST,CHLORIDE CONT-
AMINATION & OTHER DETRIMENTAL FOREIGN METTER FROM A SHOP PRIMER FILM BY BLAST CLEANING
THE BLAST CLEANING SHALL BE CARRIED OUT AFTER BENDING/ROLLING PLATE
TIME TABLE FOR MOBILIZATION & CONSTRUCTION
MARET APRIL REMAKS
NO JOB DISCRIPTION I II III IV I II III IV
MOBILIZATION
-AKHIR FEBRUARY
2 HYDROTEST
-FILLING WATER FOR TES & CLEANING INSIDE TANK
(FRESH WATER-MAX 7day)
3 PAINTING
-PRIMER
-PAINTING (HANDRIIL & TANK)
* NOTE :
-PROGRESS YELOW COLOUR AS PER CONDITION SITE
CONEROOF - TANK 300KL
N1
N
2
N
3
N N
4 7
6100mm
N N6 N
5 8
DRAIN
DRAIN
DRAIN
DRAIN
8470mm
NOZZLE
N0 ITEM QTY SIZE (NPS) RATING TYPE SERVICE
1 N1 1 3" #150 RF ATMOSPHERIC (VENT)
2 N2 1 24" #150 RF MAINHOLE
3 N3 1 1.5" #150 RF SUCTION / INLET
4 N4 1 4" #150 RF SUCTION / INLET
5 N5 1 3" #150 RF DRAIN
6 N6 2 24" #150 RF MAINHOLE
7 N7 1 4" #150 RF OVERFLOW
8 N8 1 6" #150 RF DISCHARD / OUTLET
NOTES
1 OF 2
NDE MAP - TANK 300 KL
2 SHELL PLATE
* SHELL TO SHELL JOINT VERTICAL SPOT(API 650) OWNER REQS
* SHELL TO SHELL JOINT HORIZONTAL SPOT(API 650) (NOT FULL)
5 PIPE TO PIPE
* PIPE TO PIPE ID FULL
7 ACCESSORIES
* EART LUG TO SHELL FULL
* ACSESSORIES PERMANENT TO MAINHOLE FULL
NOTE :
PT : PENETRANT TEST
1 WELDER
ADDITIONAL 1 RT/TYPE & THK / WELDER FOR VERTICAL JOINT
HYDROTASTIC TEST - TANK 300 KL
NO REMAKS
AT LAST 24 HOURS AFTER TANK HAS BEEN FILLED TO MAX TEST HEIGHT
*THE TANK IS FIST ONE IN THE AREA
*THE LARGE CAPACITY THAN ANY OTHER EXISTING TANK IN THE AREA
*THE LARGER UNIT BEARING LOAD THAN ANY OTHER EXISTING AREA
*THERE IS ANY QUESTION REGARDING THE RATE OR MAGNITUDE OF SETTLEMENT
THAT WILL TAKE PLACE
II TEST ROOF
* FOR THE ROOF OF TANK NOT DESIGNED TO BE GAS-TIGHT (NON PRESS TANK)
SHALL BE RECEVIED ONLY VISUAL INSPECTION OF ITS WELD JOINT
III REPAIR
*THERE ARE ANY LEAKGES OCCORRED DURING THE TEST /SIGNIFICANT PERMANENT
DEFORMATION THIS ARE SHALL BE REPAIR AS PER DISPOSITION PLAN.AND THAN
RE-HYDROTEST SHALL BE PERFORMED AT THE OWNER
IV TANK LEANING
*AFTER TEST WATER HAVE BEEN DRAIN
*USED POTABLE WATER OR FRESH WATER
*CLEANING AREA TANK (SHELL PLATE,ANNULAR PLATE & BOTTOM PLATE)
*CLEANED OTHER EQUIPMENT & SPRAY OR ROORED WITH FRESH WATER
*CLEAN RESIDUAL SLUDGE & WASTE WATER ,RUST IS DONE BY SPRAYING/FLUSHING
USING THE FRESH WATER
*CLEAN OFF EXCESS WATER BY PUMPING UNTIL THEY RUN THROUGH A MANHOLE
OR OTHER OPENING
HYDROTASTIC TEST - TANK 300 KL
NO REMAKS
TOP ANGEL
HLL
WATER FILLING
PI
NOTE :
D = 8470 M KAPASITAS TANGKI = 343.5 M3
T = 6100 M VOLUME AIR = 321,0 M3
L = 5700 M
CATHODIC PROTECTION - TANK 300 KL
NO DESCRIPTION REMAKS
#3 #4 #5 #6 #7 ARRAY 1 *FIRSTANODE RING PLACE 2 1/2'' FEET(3/4)
#8 #9 #10 #11 #12 ARRAY #2 IN FROM OUTSIDE EDGE SUBSEQUENT
ANODE RING PLACED 5 FEET(1 1/2M) IN
FROOM PREVIOUS RING.
ANODE
REFF ELECTRODE S
REFF ELECTRODE WITH ROAD COUPON
1 OF 2
CATHODIC PROTECTION - TANK 300 KL
NO DESCRIPTION REMAKS
*FIRSTANODE RING PLACE 2 1/2'' FEET(3/4)
IN FROM OUTSIDE EDGE SUBSEQUENT
# CELL # 2 ANODE RING PLACED 5 FEET(1 1/2M) IN
#ARRAY # 1 FROOM PREVIOUS RING.