NGCP- BINAN, LAGUNA

Powercity Corporation

Today's Date: 17-Feb-2020 Monday


(vertical red line)
Project Coordinator: NELSON PUNZALAN
Start Date: 25-Oct-2019 Friday
[42] First Day of Week (Mon=2): 2 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

02 - Mar - 20
03 - Feb - 20

10 - Feb - 20

17 - Feb - 20

24 - Feb - 20
13 - Jan - 20

20 - Jan - 20

27 - Jan - 20
Days Remaining
Duration (Days)

Days Complete
% Complete

Worst Case
Workdays
WBS Tasks Start End Notes/Remarks M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F

CIVIL WORKS - Construction of 10/25/2019 12/24/2019 61 90% 52 47 14 -5


1 Footings,shetlter, flooring & Genset pad.
2 Mobilization of materials for Civil Works. 10/25/2019 10/25/2019 1 100% 1 1 0 0 `
Site Clearing (including relocation of existing 10/26/2019 10/27/2019 2 100% 1 1 1 0
3 materials to new temporary stagging area).

Earth works, (excavation, tampering and gravel 10/28/2019 11/3/2019 7 100% 6 6 1 0


bedding for footing of Genset's shelter).
4
Fabrication and Installation of steel bars for 11/4/2019 11/12/2019 9 100% 8 8 1 0
5 footings and columns. 0

Concrete pouring of footings (including concrete 11/13/2019 11/20/2019 8 100% 7 7 1 0


compressive strength @ 28 days for footing).
6

Installation of anchor bolt, form works and


concrete pouring on columns (including concrete 11/21/2019 11/29/2019 9 100% 8 8 1 0
compressive strength @ 28 days for columns).
7
Stripping of form works, backfill and tampering 11/30/2019 12/2/2019 3 100% 2 2 1 0
8
Construction of genset concrete pad, spill catch 12/3/2019 12/9/2019 7 100% 6 6 1 0
9 basin & slabs for the genset house
Mobilization of materials, tools and equipment 12/10/2019 12/12/2019 3 100% 3 3 0 0
10 for fabrication and iron works.

Iron-works (including fabrication of gate, roofing, 12/13/2019 12/24/2019 12 50% 10 5 7 -5


trusses genset's shelter enclosure
11
12
MECHANICAL WORKS - Installation of 12/25/2019 1/5/2020 12 58% 10 6 4 -4
13 Generator set and accessories
Delivery of 150 KVA Genset, 12/25/2019 12/27/2019 3 100% 3 3 0 0
14
Installation of Genset (including muffler
extension, exhaust pipe extension, heat resistant 12/28/2019 12/30/2019 3 100% 2 2 0 0
15 paint)

Installation of 4" dia BI Piping for smoke stack 12/31/2019 12/31/2019 1 100% 1 1 0 0
16
17 Installation of drain including clamps. 1/1/2020 1/1/2020 1 0% 1 0 1 -1
18 Installation of hanger and cover 1/2/2020 1/3/2020 2 0% 2 0 2 -2
19 Painting 1/4/2020 1/5/2020 2 0% 1 0 1 -1
ELECTRICAL WORKS - Installation of
distribution panel, feeder and 1/5/2020 1/20/2020 16 31% 13 4 9 -9
termination.
20
21 Underground excavation for electrical piping 1/5/2020 1/9/2020 5 100% 4 4 0 0
22 Installation of distribution panel 1/10/2020 1/13/2020 4 0% 3 0 3 -3
23 Installation of terminal lugs 1/14/2020 1/16/2020 3 0% 3 0 3 -3
24 Installation of terminal connector 1/17/2020 1/17/2020 1 0% 1 0 1 -1
25 Conduits 1/18/2020 1/19/2020 2 0% 1 0 1 -1
26 Cut- over 1/20/2020 1/20/2020 1 0% 1 0 1 -1
Testing and Commissioning and 2/21/2020 2/21/2020 1 0% 1 0 1 -1
27 Acceptance
28 Final testing 2/21/2020 2/21/2020 1 0% 1 0 1 -1
29
30
31
32
33
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

04 - May - 20

11 - May - 20
02 - Mar - 20

09 - Mar - 20

16 - Mar - 20

23 - Mar - 20

30 - Mar - 20

06 - Apr - 20

13 - Apr - 20

20 - Apr - 20

27 - Apr - 20
S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S SM TWT F S S
Burn

Actual Worked Days


Total Planned Days
Date Task

Plan in Workdays

Days Complete
Duration Days
25-Oct-19 CIVIL WORKS - Construction of Footings,shetlter, flooring & Genset pad. 61 52 47 61 47

25-Oct-19 Mobilization of materials for Civil Works. 1 1 1 1 1

26-Oct-19 Site Clearing (including relocation of existing materials to new temporary 2 1 1 2 1


stagging area).

28-Oct-19 Earth works, (excavation, tampering and gravel bedding for footing of Genset's 7 6 6 7 6
shelter).

4-Nov-19 Fabrication and Installation of steel bars for footings and columns. 9 8 8 9 8

Concrete pouring of footings (including concrete compressive strength @ 28


13-Nov-19 8 7 7 8 7
days for footing).

Installation of anchor bolt, form works and concrete pouring on columns


21-Nov-19 9 8 8 9 8
(including concrete compressive strength @ 28 days for columns).

30-Nov-19 Stripping of form works, backfill and tampering 3 2 2 3 2

3-Dec-19 Construction of genset concrete pad, spill catch basin & slabs for the genset 7 6 6 7 6
house

10-Dec-19 Mobilization of materials, tools and equipment for fabrication and iron works. 3 3 3 3 3

Iron-works (including fabrication of gate, roofing, trusses genset's shelter


13-Dec-19 12 10 5 12 5
enclosure

25-Dec-19 MECHANICAL WORKS - Installation of Generator set and accessories 12 10 6 12 6

25-Dec-19 Delivery of 150 KVA Genset, 3 3 3 3 3

Installation of Genset (including muffler extension, exhaust pipe extension, heat


28-Dec-19 3 2 2 3 2
resistant paint)

31-Dec-19 Installation of 4" dia BI Piping for smoke stack 1 1 1 1 1


1-Jan-20 Installation of drain including clamps. 1 1 0 1 0

2-Jan-20 Installation of hanger and cover 2 2 0 2 0

4-Jan-20 Painting 2 1 0 2 0

ELECTRICAL WORKS - Installation of distribution panel, feeder and


5-Jan-20 16 13 4 16 4
termination.

5-Jan-20 Underground excavation for electrical piping 5 4 4 5 4

10-Jan-20 Installation of distribution panel 4 3 0 4 0

14-Jan-20 Installation of terminal lugs 3 3 0 3 0

17-Jan-20 Installation of terminal connector 1 1 0 1 0

18-Jan-20 Conduits 2 1 0 2 0

21-Feb-20 Testing and Commissioning and Acceptance 1 1 0 1 0


21-Feb-20 Final testing 1 1 0 1 0
Burn Up Chart

Burn Up Chart
60

50

40
Total Number of Workdays

30

20

12

10
9 9
8 8 8
7 7 7
6 6
5

3 3
2 2
1 1
0

Tota l Pla nned Days Actua l Worked Days


9 9
8 8 8
7 7 7
6 6
5

3 3
2 2
1 1
0

Tota l Pla nned Days Actua l Worked Days


12 12

6
5

3 3 3
2 2
1 1
0 0
6
5

3 3 3
2 2
1 1
0 0
Duration (Days)
WBS Tasks Start End

CIVIL WORKS - Construction of Footings,shetlter, 10/25/2019 12/24/2019 61


1 flooring & Genset pad.
MECHANICAL WORKS - Installation of Generator 12/25/2019 1/5/2020 12
2 set and accessories
ELECTRICAL WORKS - Installation of distribution 1/5/2020 1/20/2020 16
3 panel, feeder and termination.

Testing and Commissioning and Acceptance 2/21/2020 2/21/2020 1


4

OVERALL 90
% Complete

0%
31%
58%
90%

45%
1
13
10
52
Workdays

76
0
0
6
47

Days Complete

53