OBRA “CONSTRUCCION DE LA I.E ANDRES AVELINO CACERES DEL DISTRITO DE OYOLO, PROVINCIA DE PAUCAR DEL SARA SARA DEPARTAMENTO DE AYACUCHO”
13.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR 1.00 5.00 5.00 25.00 25.00 M2
13.01.03 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR DURANTE EL PROCESO 1.00 5.00 5.00 25.00 25.00 M2
13.02.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO TOTAL x F. COMPACTACION 1.25 10.09 12.61 M3
CISTERNA 2.00 3.40 0.45 1.90 5.81
2.00 2.50 0.45 1.90 4.28
13.02.01.04 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML 1.25 14.55 18.19 18.19 M3
13.02.01.05 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO PESADO CARGUIO A MANO 1.00 18.19 18.19 18.19 M3
13.04.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 VER CUADRO DE METRADOS 494.12 KG
13.04.02 COLUMNAS
13.04.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 1.65 M3
COLUMNA ( C - 1 ) 4.00 0.25 0.25 6.60 1.65
13.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/COLUMNAS VER CUADRO DE METRADOS 389.41 KG
13.04.03 VIGAS
13.04.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 1.50 M3
13.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/TANQUE ELEVA VER CUADRO DE METRADOS 201.37 KG
METRADO ACEROS
OBRA “CONSTRUCCION DE LA I.E ANDRES AVELINO CACERES DEL DISTRITO DE OYOLO, PROVINCIA DE PAUCAR DEL SARA SARA DEPARTAMENTO DE AYACUCHO”
DEPARTAMENT : AYACUCHO
PROVINCIA : PAUCAR DEL SARA SARA
DISTRITO : OYOLO
C. POBLADO : OYOLO
FECHA -
UBICACIÓN DE ANCHO ALTO PARCI
ITEM PARTIDA DESCRIPCION CANT. LARGO TOTAL UND
ELEMENTO (m) (m) AL
(m)
14.01.02 TARRAJEO EN VIGAS MEZC. C:A - 1:5 E=1.5 CM INCL. VESTIDURA DE ARISTAS 20.90 M2
VA (25 x 30) 8.00 2.00 0.25 4.00
VA arriotre 8.00 2.00 0.25 4.00
VA (25 x 30),intermedio 8.00 2.00 0.25 4.00
VA arriotre 8.00 2.00 0.25 4.00
Viga VA - TE 4.00 2.50 0.25 2.50
4.00 2.00 0.05 0.40
4.00 2.00 0.25 2.00
14.01.03 TARRAJEO EN MUROS EXTERIORES CON C:A - 1:5 E=1.5 CM TANQUE ELEVADO 26.68 M2
Muros 4.00 2.50 1.15 11.50
Losa superior exterior 1.00 2.50 2.50 6.25
Tapa 4.00 0.80 0.15 0.48
4.00 0.60 0.10 0.24
CASETA CISTERNA
Muros 2.00 1.00 1.70 3.40
1.00 1.30 1.70 2.21
2.00 0.30 1.70 1.02
1.00 0.70 0.40 0.28
Losa superior 1.00 1.30 1.00 1.30
14.01.04 TARRAJEO EN MUROS INTERIORES CON C:A - 1:5 E=1.5 CM CASETA CISTERNA 6.62 M2
Muros 2.00 0.80 1.50 2.40
1.00 1.10 1.50 1.65
2.00 0.20 1.50 0.60
1.00 0.70 0.30 0.21
Losa fondo 1.00 1.10 0.80 0.88
Losa superior 1.00 1.10 0.80 0.88
UBICACIÓN DE ANCHO ALTO PARCI
ITEM PARTIDA DESCRIPCION CANT. LARGO TOTAL UND
ELEMENTO (m) (m) AL
(m)
CIELO RASOS
14.01.06 CIELORRASOS CON MEZCLA C:A 1:5 CINTAS E=1.5 CM TANQUE ELEVADO 4.00 M2
Losa fondo exterior 1.00 2.00 2.00 4.00
14.03.03 ESCALERA METALICA TIPO GATO CON BARANDAS SEGUN DISEÑO 1.00 UND
SEGUN DISEÑO, INCL INSTALACION TANQUE ELEVADO 1.00 1.00 1.00
14.04 CERRAJERIA
14.04.01 CHAPA DE PARCHE 3 GOLPES Puerta caseta electrobomba 1.00 1.00 1.00 PZA
golpes
14.04.02 PICAPORTE DE FIERRO REDONDO DE 1/2" X 8" Puerta caseta electrobomba 2.00 2.00 2.00 UND
14.05 PINTURA
14.05.01 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE C-1 4.00 0.25 6.60 6.60 26.40 M2
4.00 0.25 6.60 6.60
4.00 0.25 6.60 6.60
4.00 0.25 6.60 6.60
UBICACIÓN DE ANCHO ALTO PARCI
ITEM PARTIDA DESCRIPCION CANT. LARGO TOTAL UND
ELEMENTO (m) (m) AL
(m)
14.05.03 PINTURA EN MUROS INTERIORES C/ LATEX SATINADO LAVABLE TANQUE ELEVADO 26.68 M2
Muros 4.00 2.50 1.15 11.50
Losa superior exterior 1.00 2.50 2.50 6.25
Tapa 4.00 0.80 0.15 0.48
4.00 0.60 0.10 0.24
CASETA CISTERNA
Muros 2.00 1.00 1.70 3.40
1.00 1.30 1.70 2.21
2.00 0.30 1.70 1.02
1.00 0.70 0.40 0.28
Losa superior 1.00 1.30 1.00 1.30
14.05.04 PINTURA EN MUROS EXTERIORES C/ LATEX SATINADO LAVABLE CASETA CISTERNA 6.62 M2
Muros 2.00 0.80 1.50 2.40
1.00 1.10 1.50 1.65
2.00 0.20 1.50 0.60
1.00 0.70 0.30 0.21
Losa fondo 1.00 1.10 0.80 0.88
Losa superior 1.00 1.10 0.80 0.88
14.05.06 PINTURA EN CIELO RASO C/ LATEX SATINADO LAVABLE TANQUE ELEVADO 4.00 M2
Losa fondo exterior 1.00 2.00 2.00 4.00
14.05.07 PINTURA ESMALTE SINTETICO EN ZOCALOS 2 MANOS 4.00 1.00 0.40 1.60 1.60 M2
METRADO ACEROS
OBRA “CONSTRUCCION DE LA I.E ANDRES AVELINO CACERES DEL DISTRITO DE OYOLO, PROVINCIA DE PAUCAR DEL SARA SARA DEPARTAMENTO DE AYACUCHO”
Alimentador al T. E.
15.02.02 TUBERIA PVC SAP DE 3/4" 1.00 9.00 9.00 9.45 ML
edificaciones
15.02.03 TUBERIA PVC SAP DE 1" Tuberia de impulsion 1.00 14.00 14.00 14.70 ML
15.02.04 TUBERIA PVC SAP DE 1 1/2" Tuberia de succión 1.00 5.00 5.00 5.25 ML
15.03.01.02 TEE PVC SAP 3/4" 1.00 2.00 2.00 2.00 UND
15.02.01.03 CODO PVC SAP DE 1/2" 1.00 1.00 1.00 1.00 UND
15.03.02.02 TEE PVC SAP DE 1/2" 1.00 1.00 1.00 1.00 UND
15.03.02.03 CODO PVC SAP 1" X 90º 1.00 4.00 4.00 4.00 UND
15.04.02 ABRAZADERA DE 1" X 1/2" FºGº 1.00 4.00 4.00 4.00 PZA
15.04.03 ABRAZADERA DE 2" X 1/2" FºGº 1.00 4.00 4.00 4.00 PZA
METRADO ACEROS
OBRA “CONSTRUCCION DE LA I.E ANDRES AVELINO CACERES DEL DISTRITO DE OYOLO, PROVINCIA DE PAUCAR DEL SARA SARA DEPARTAMENTO DE AYACUCHO”
FECHA -
UBICACIÓN DE ANCHO ALTO PARCI
ITEM PARTIDA DESCRIPCION CANT. LARGO TOTAL UND
ELEMENTO (m) (m) AL
(m)
16.01.01 TABLERO DE DISTRIBUCION PARA LLAVES TIPO RIEL 12 POLOS 2.00 Und.
2.00 2.00
DISPOSITIVOS DE MANIOBRA Y PROTECCION
16.01.02 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X60 AMP. 3.00 3.00 Und.
C. POBLADO : OYOLO
FECHA -
CANT. DE
LONG Nº DE
ITEM DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
13.04.01.03 ACERO DE REFUERZO FY=4200kG/CM2 PARA CISTERNA
Losa fondo
ambos lados Ø 1/2" 3.80 11.00 2.00 83.60
ambos lados Ø 1/2" 2.75 12.00 2.00 66.00
Muros
vertical Ø 1/2" 3.20 8.00 4.00 102.40
Ø 1/2" 2.80 8.00 4.00 89.60
horizontal Ø 3/8" 2.85 8.00 4.00 91.20
Ø 3/8" 2.50 8.00 4.00 80.00
Losa superior (Tapa)
Ø 3/8" 2.70 10.00 2.00 54.00
Ø 3/8" 2.05 4.00 1.00 8.20
Ø 3/8" 1.30 4.00 2.00 10.40
Ø 1/2" 1.40 1.00 3.00 4.20
C-1 (0.25x0.25)
TANQUE ELEVADO TIPO
Ø 5/8" 10.10 4.00 4.00 161.60
Estribos TIPO
Ø 3/8" 0.94 60.00 4.00 225.60
Muro
acero vertical Ø 3/8" 1.65 12.00 4.00 79.20
Ø 1/2" 1.65 1.00 4.00 6.60
acero horizontal Ø 3/8" 2.70 7.00 4.00 75.60
Losa superior
Ø 3/8" 2.70 10.00 2.00 54.00
Ø 3/8" 2.05 4.00 1.00 8.20
Ø 3/8" 1.30 4.00 2.00 10.40
Ø 1/2" 1.40 1.00 3.00 4.20