Contents
1 Scope 4
2 Definitions 4
3 Inspection 4
3.1 Safe for traffic 4
3.2 Method of inspection 4
3.3 Basic visual track inspection 4
3.4 Patrolling diagram 5
3.5 Defects to be identified by a patroller 5
4 Defects at fishplated joints 5
4.1 Broken, cracked, incorrect or damaged fishplates 5
4.2 Bolts missing from joints 5
4.3 “Fly-fished” joints 5
Table 1 - Minimum action to be taken for broken, cracked, incorrect or damaged
fishplates in a running line 6
Table 2A –Minimum action to be taken for joints with missing fishbolts 7
Table 2B – Minimum action to be taken for rail joints with all the bolts missing from
either rail end (‘fly-fished’ joint) 7
5 Broken rails 8
5.1 Immediate action 8
5.2 Authority to remove line blockage 8
5.3 Competent person 8
5.4 Broken rail action tables 8
Table 3 – Transverse break through plain rail or weld 9
Table 4 – Any part of the railhead broken away 9
Table 5 – Lower part of the rail broken away 10
Table 6 – Longitudinal split 11
6 Rail head damage (not arc damage) 11
6.1 Immediate action 11
6.2 Authority to remove line blockage 11
6.3 Rail head damage action table 11
7 Rail arc damage 11
Table 7 – Railhead damage 12
8 Loss of rail foot width 12
Table 8 – Minimum action for loss of rail foot width 12
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Page 2 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
9 Adjustment switches 13
Figure 1 – Adjustment switch baseplate detail 13
Table 9 – Adjustment switch setting dimensions 13
Table 10 – Action for sub-standard switch tip support 14
Table 11 – Action for rail foot not fully supported at the end of the machining 14
10 Level Crossings 15
11 Maintenance tolerances and intervention limits 15
12 Priorities for track defects identified during inspection. 15
13 Actions for defective stretcher bars. 16
13.1 Fixed stretcher bars 16
13.2 Adjustable stretcher bars 16
13.3 Lock stretcher bars 16
13.4 Identification of stretcher bars and stretcher bar fastenings 16
13.5 Recording and reporting of stretcher bars defects 16
Appendix A - Maintenance tolerance and Intervention limit tables 17
Table A.1 – Ballast; maintenance tolerance and intervention limit 17
Table A.2 – Maximum number of ineffective sleepers per 60ft length 17
Table A.3 – Fastenings; maintenance tolerance and intervention limit 17
Appendix B - Work Priority Tables 18
Table B.1 Track Geometry 19
Table B.2 Joints 20
Table B.3 Rails 20
Table B 4 Sleepers 21
Table B.5 Rail Fastenings 21
Table B.6 Pads and insulators 22
Table B.7 Longitudinal timbers 22
Table B.8 Ballast 23
Table B.9 Check rails 24
Table B.10 S&C 24
Appendix C - Defective fixed stretcher bar action tables 27
Appendix D – Pictorial guidance for defects on fixed stretcher bar assemblies 29
Appendix E - Defective adjustable stretcher bar action tables 36
Appendix F – Pictorial guidance for defects on adjustable stretcher bar assemblies 38
Appendix G - Defective lock stretcher bar action table 44
Appendix H - Pictorial guidance for defects on lock stretcher bar assemblies 45
Appendix I – Identification of stretcher bars and stretcher bar fastenings 47
Page 3 of 47
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
1 Scope
This module of NR/L2/TRK/001 contains extracts from other modules within this
standard. It also includes additional tables and photographs to provide guidance
when undertaking inspections.
Mandatory requirements are detailed in the module of NR/L2/TRK/001 as referenced
at the end of each section/clause.
This guidance includes:
a) inspection;
b) defects at fishplated joints;
c) broken rails;
d) rail head damage (arc damage and non-arc damage);
e) loss of rail foot width;
f) adjustment switches;
g) level crossings
h) maintenance tolerances and intervention limits;
i) priorities for track faults observed during inspection;
j) actions for defective stretcher bars and missing or loose fastenings.
The reference at the end of the section/clause indicates where full details can be
found.
2 Definitions
See Glossary (NR/L2/TRK/001/mod01).
3 Inspection
3.1 Safe for traffic
If the track is not safe for traffic, apply either a speed restriction or block the line. The
speed restriction or line blockage will remain in place until the necessary repairs have
been completed.
NR/L2/TRK/001/mod02
3.2 Method of inspection
Unless an alternative method has been agreed, track inspections are undertaken in
daylight, on foot, walking within the length of the sleepers.
A maximum of two tracks can be inspected at one time.
NR/L2/TRK/001/mod02
3.3 Basic visual track inspection
Basic visual track inspections, undertaken by competent persons, identify defects
which, if uncorrected, could affect the safety or reliable operation of the railway.
NR/L2/TRK/001/mod02
Page 4 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
The Patroller will either mark and rectify the defect (if the defect is of a minor nature
and can be rectified within their normal duties – e.g. replacing clips, tightening bolts or
keeping flangeways clear) or mark the defect and report it to the Section Manager
[Track] (SM[T]) on TEF3015.
The Patroller may need to take appropriate action to protect trains by reporting the
defect to the Signaller.
The Patroller will also identify, where practical, other defects that require repair. The
patroller is not normally required to carry measuring equipment (track gauges etc) but
can make competent visual assessment of track component conditions and the
amount of movement (voiding, chair / baseplate shuffle etc.).
Because basic visual inspections are carried out frequently, the patroller will be able
to monitor these defects and report any deterioration to the SM[T].
Significant isolated geometry defects (top, alignment and twist) can be observed
visually and will be reported to the SM[T] who will make arrangements to take
measurements.
When measurements have been taken, the SM[T] will determine the timescales for
corrective action to be taken.
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Page 5 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
Table 1 - Minimum action to be taken for broken, cracked, incorrect or damaged fishplates in
a running line
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`--- Page 6 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
All bolts missing from both rail ends Block the line Fit new fishbolts
Table 2B – Minimum action to be taken for rail joints with all the bolts missing from
either rail end (‘fly-fished’ joint)
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Gap between Is a Watchman Immediate action Follow-up action
1, 2
rail ends present?
≤ 50mm Yes Impose a 20mph speed restriction. Fit new bolts within
3, 4
Confirm remaining bolts are tight 48 hours
≤50mm No Impose a 5mph speed restriction. Inspect after 24 hours.
Confirm remaining bolts are tight Fit new bolts within
3, 4
48 hours
51 to 75mm Yes Impose a 5mph speed restriction. Fit new bolts within
3, 4
Confirm remaining bolts are tight 48 hours
> 75mm Not applicable Block the line (until rectified) Fit new bolts
Notes:
1 The watchman, if appointed, shall remain on site throughout the period when trains are running.
2 The watchman shall monitor for any deterioration in the joint (reduced support or gap widening) and action
as advised by the SM[T].
3 If repairs are not completed within 48 hours, the line shall be blocked.
4 Repair may require rail replacement.
Page 7 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
5 Broken rails
5.1 Immediate action
On discovery of a broken rail, block the line (by contacting the signaller).
The line shall remain blocked if either of the following apply:
a) the break is in a switch or crossing rail which is free to move;
b) the break is within 2 metres of heavy or severe rolling contact fatigue (RCF).
NR/L2/TRK/001/mod08
Report the break to the SM[T].
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
5.2 Authority to remove line blockage
To determine whether the line blockage can be lifted, the break has to be inspected
and assessed by a competent person (see below).
NR/L2/TRK/001/mod08
Page 8 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
None >10mm
Block the Block the Block the
and 5mph 5mph
Line Line Line
(but a 50mm
watchman >50mm
shall be Block the 5mph Block the Block the 5mph
and
present) Line Note 2 Line Line Note 2
75mm
>75mm B l o c k t h e L i n e
Notes:
See end of Table 4
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Page 9 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
>50mm 20mph
None 25mm and
Replace rail within 48 hours [3A]
100mm
(but a
watchman Block the 5mph Block the Block the 5mph
>25mm 100mm
shall be
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Notes:
1. Confirm that the two adjacent sleepers, and the fastening systems, on each side of the break (four in total) are
sound, and the ballast beneath them well packed and of equal consolidation.
2. Minimum action code (MAC) shown in brackets [..]. See NR/L2/TRK/001/mod07 for MAC definitions.
3. Replace rail within 24 hours for Category 1A, 1, 2 or 3 lines. Replace within 48 hours for Category 4, 5 or 6 lines.
4. n/a
5. n/a
6. Only the route containing the broken/damaged moving rail need be blocked. Secure the rail to prevent fouling of
the open route or any signalling equipment..
Page 10 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
DETACHED PIECE B
Is the split in the running YES
OF RAIL (FROM A L
edge side of the rail head?
LONGITUDINAL O
SPLIT) C
Is the rail free to move YES
DISCOVERED NO K
YES (i.e. a switch rail)?
T
NO
Is the split in an S&C rail? H
Longitudinal Is the rail bolted to and E
YES
position of split supported by S&C blocks NO
is not NO and another form of L
support? I
significant N
YES
Is the split at a joint? E
NO
5mph ESR
Page 11 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
NO
5mph ESR
Is the rail damaged or distorted YES Clamp if possible
either vertically or laterally by
Longitudinal Appoint Watchman
more than 10mm?
position of Rectify within 48 hours
damage is not
NO
significant 20mph ESR
Clamp if possible
Appoint Watchman
Rectify within 48 hours
Notes:
1. Localised breaking away (e.g. chipping) or lipping on either the running edge or the back edge of a
rail is not classified as rail head damage.
2. Holders of the Rail Defect Nominee (RDN) competency are only permitted to open the line at 5mph.
Action Minimum
Total loss to width
Action Code
of rail foot Immediate (see note 1) Follow up (MAC)
Page 12 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
9 Adjustment switches
Check adjustment switch setting (gap dimension Y). Required gap dimensions are
shown (for various rail temperatures) in Table 9.
Check switch tip support (dimension X). If support is inadequate, take action as
shown in Table 10.
Check that the whole width of the rail foot at the end of the machining (rail foot cut
out) is fully supported.
If support is inadequate, take action as shown in Table 11.
NR/L2/TRK/001/mod16
Baseplate
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Edge of rail head
cut out
Switch tip
X Y
Page 13 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
Table 11 – Action for rail foot not fully supported at the end of the machining
Baseplate Baseplate
Page 14 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
10 Level Crossings
Routine basic visual track inspection will include, at level crossings, checks for the
following:
a) signs of deterioration or defects in any part of the track system concealed by the
crossing surface (e.g. poor top which could be caused by ballast or sleeper
failure);
b) any worsening of the track condition which is affecting, or may affect, the safe use
of the crossing (by rail or road vehicles);
c) deterioration of the level crossing surface system, including loose components,
broken or cracked deck panels and damage;
d) loose deck units which rock or tilt under load from road traffic (which may indicate
incorrect seating/support of the deck panels);
e) gaps and steps between the deck panels likely to be a hazard to the crossing
users (especially cyclists, pedestrians and those on horseback);
f) flangeways (to confirm they are clear and free from silt, rubbish, etc.);
g) damage or deterioration to the trespass guards;
h) correctly functioning telephones at unmanned level crossings.
Report any observed defect which is likely to render the level crossing unsafe.
Take immediate action where necessary to protect rail traffic and the users.
NR/L2/TRK/001/mod02
Page 15 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
Page 16 of 47
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Slurried beds Two consecutive beds/ sleepers. If one site is greater than 5m
(i.e. the ballast surrounding If sites are between 6m and 18m in length or three sites
the sleeper is unable to give apart, rectify before development between 6m and 18m apart
vertical or lateral support) of a third site (which can cause
cyclic top)
voided sleepers 7mm
60ft of track
Number of consecutive rail 2, 3,
seats with any fastenings with each group separated by with each group separated by
missing or ineffective, or with at least two sleepers with all at least two sleepers with all
broken baseplates or chairs fastenings in place fastenings in place
Pads or insulators missing or 0; 0;
ineffective shall meet local signalling shall meet local signalling
requirements, shall be in one requirements, shall be in one
piece and not worn through piece and not worn through
Page 17 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Compliance date: 02 February 2013
The priorities in shaded boxes are normally applied by the Section Manager [Track].
Page 18 of 47
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Check dip angle output from track recording. Shim joint/rail end and straighten,
At any other joint 10mm lift and pack as appropriate
Action as specified in NR/L2/TRK/001/mod11
Voiding
Adjustment
switch, IBJ or Up to 7mm M1 M3 M3 M6
S&C (within 3m of Life and pack.
switch toes or
8mm or more M0 M1 M1 M3
crossing nose)
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Page 19 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Worn or
M1 M3 M3 M6 Monitor and renew.
Insulators and damaged
end posts Broken or
M0 M0 M1 M1 Renew.
missing
Rail adjusting
More than 5
If rail temperature Rail adjust prior to hot weather.
o consecutive Report to SM[T]
is 20 C or less If not completed apply mitigation.
closed joints
More than 5
If rail temperature
o consecutive Report to SM[T] Rail adjust prior to winter.
is 30 C or more
wide joints.
Incorrectly spaced sleepers
At an IBJ M1 M3 M3 M6
At a fishplated or
M3 M6 M6 M12
welded joint
Page 20 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Table B 4 Sleepers
Priority
Parameter Limit Work item description
Cat 1A Cat.1/2 Cat.3/4 Cat.5/6
Ineffective sleepers In any 60ft of track (i.e. unable to provide vertical support or hold gauge)
2 M1 M3 M6
Number of
Ineffective 3 M0 M1 M3 M12 Monitor until sleepers replaced.
sleepers Install temporary restraint if
4 M0 M1 M6 appropriate.
(each group If over a significant distance, put
separated by at 5 M0 M3
Apply ESR or other in place control measures and
least 2 sound 6 mitigation. M3 plan for renewal.
sleepers)
Resleeper ASAP
7 or more M1
Ineffective sleepers at joint (fishplated or weld)
If ineffective
1 M0 M1 M1 M3
sleeper at a joint
Maximum number of consecutive ineffective sleepers (not at a joint or a weld)
2 M1 M1 M1 M3 Replace sleepers.
Consecutive
Impose ESR appropriate to the
Ineffective 3 M0 M0 M0 M1
highest traffic loading on the
sleeper
4 Impose ESR M0 route.
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`--- Page 21 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Consecutive
6 or more M1 M1 M1 M3
sleepers
Pads and Insulators (on steel sleepers)
Missing or Replace as soon as possible to
N/A M1 M1 M1 M1
ineffective avoid track circuit failure.
Worn, damaged or missing ferrules
Badly worn
but M3 M6 M12 N/A
serviceable
Worn/damaged Replace ferrules
Worn right
through or M1 M3 M6 M12
missing
Loose and
Report to Section Manager
unserviceable/
[Track] for immediate gauge
inaccessible or N/A M0 M0 M0
check; tighten or replace within
unable to tighten
24 hrs.
on patrol
Wedges (lateral packing)
Loose or missing N/A M0 M0 M0 Tighten/replace during patrol.
Page 22 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Page 23 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Dimensions
more than Adjust to the correct position to be
Switch tip position M6 M12
15mm in 90mm +/-6.
– switches A-E Switches
(specification
90mm from the Dimensions
centre line of the more than
Adjust to the correct position to be
first slide plate) 20mm in M3 M6 M12
90mm +/-6.
F and longer
switches
When measuring the switch tip positions and these dimensions, the cross gauge must be square to
the rails and the switch tips never more than 12mm out of square.
7mm or more Adjust to the correct position
Switch tip position from (specification 115mm from
M3 M6 M12
– switch diamonds specified knuckle, 90mm for certain BH
position diamonds)
Gauge stops and Sole Plates
Gauge stop
Track gauge Block line until temporary gauge retention
cracked or Replace soleplate
not retained fitted.
missing
Gauge stop
Track gauge
cracked or Fit tie bars Replace soleplate within 4 weeks.
retained
missing
Soleplate Track gauge Block line until temporary gauge retention Replace / repair soleplate within
damaged not retained fitted. 7 days.
Soleplate Track gauge Replace / repair soleplate within
Fit tie bars
damaged retained 4 weeks.
Page 24 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Wear or damage
3mm or more
in wheel transfer See NR/L2/TRK/1054 Weld repair; lift and pack.
deep
area
Timber bearers
Unable to
Rotten timber M1 M3 M6 M12 Renew timber.
retain screws
Concrete Bearers
Broken at
M1 M3 M6 M6 Repair or renew.
housing
Damaged
Badly
M3 M6 M12 M12 Renew.
cracked
Baseplates & chairs
1 M3 M3 M6 M12
2 or more
M1 M1 M3 M6
consecutive
Broken
baseplates/chair/ At switch tips Replace
housing or crossing M1 M3 M6 M6
nose
At IBJ, joint
M1 M3 M6 M6
or weld
Chipped/scor
Nylon slide chairs M1 M3 M6 M12 Renew pads.
ed/ Broken
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Page 25 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix B Compliance date: 02 February 2013
Worn but
M3 M3 M6 M12
serviceable
Worn/ damaged/
Worn right Renew
missing
through / M3 M3 M3 M6
missing
Fastenings
1 broken/
missing or M3 M3 M6 M12
loose
2 consecutive
broken or M1 M1 M3 M6
Stud bolts missing Renew bolts
Isolated
loose stud M3 M3 M6 M12
bolts
More than
M0 M0 M3 M6
25% loose
At 2
consecutive M1 M3 M6 M12 Monitor; renew
Loose, broken or timbers
missing chair
screws/spikes At 3 or more
Renew or fit coils/ maintenance
consecutive M1 M1 M3 M6
fastenings
timbers
Isolated
Patroller replace if safe to do so.
loose, broken M1 M3 M6 M12
Report to SM[T]
Clip/keys or missing
More than For M0, impose 20mph ESR.
M0 M0 M1 M3
25% loose Renew/replace within 24 hours.
Page 26 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix C - Defective fixed stretcher bar action tables Compliance date: 02 February 2013
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=Amey OWR Ltd./1121223024, User=saunders, KARL
Page 27 of 47
No reproduction or networking permitted without license from IHS Not for Resale, 07/30/2018 04:04:37 MDT
Ref: NR/L2/TRK/001/mod19
Issue: 6
Date: 01 December 2012
Appendix C Compliance date: 02 February 2013
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---
--```,,,,`,,,,`,``,``,,,`,,,`,``-`-`,,`,,`,`,,`---