Submittal for Approval

Section: Date: 12-02-2020 New Submittal Resubmittal

To: From: Transmittal No:(SD#0145) Previous Transmittal NO:


Contractor: AL SHAMS Items to be submitted:
DEGLA PROJECT MANAGEMENT Contract No.: NG-NH07-01- AL SHAMS Shop Dwg. Samples
New Giza Project (NH-07)
Certificate Colored Brochure

RB-13 Specification Sec No: Method Statement Calculation Sheet

Others Others
RB-13-22,27

Contract Reference Documents


No. of Action
ITEM Description Specs. NOTES
Copies DWG No. Code
No.
01  Slab On Grade Concrete Dimensions ‐ PART 1 SD‐07‐RB‐13‐22,27‐ST101‐00‐298
02  Slab On Grade Concrete Dimensions ‐ PART 2 SD‐07‐RB‐13‐22,27‐ST101‐00‐299
03  Slab On Grade Concrete Dimensions ‐ PART 3 SD‐07‐RB‐13‐22,27‐ST101‐00‐300
04  Slab On Grade Concrete Sections  SD‐07‐RB‐13‐22,27‐ST101‐00‐301
Consultant Remarks:

Degla CFM Remarks: The Following Action Code Are Given to Item Submitted: Approval of Item Does not Relieve the Contractor from complying with
A Approved as Submitted requirements of Contract documents Specifications and applicable Codes.
B Approved as Noted
C Revise & Resubmission Required.

Degla CFM: Author: ................................................ Degla CFM Project Manager: .................................................


It's not intended by the aforementioned response to constitute Engineer's Instruction for variation. In case the Contractor believes that this reply includes variation affecting the Time for Completion or the
Contract Price, the Contractor shall immediately notify the Engineer with the time & cost implications, if any

.
X‐K
Y‐2 Y‐3

Y‐1

01 02 03 04 05 06 07 08 09 10 11
GENERAL NOTES :-
3090 1230 4120 2800 4540 4800 4910 4540 2800 2000
Y‐3
1.  ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS INDICATED OTHERWISE.
34830 M‐2 X‐J
2. ALL SHOWN LEVELS IN MILLIMETERS, UNLESS INDICATED OTHERWISE.
M‐1 3. STANDARDISED R.C CONCRETE CUBE SHOULD BE SUBJECTED TO
2 LABORATORY CRASH TEST AFTER 28 DAYS TO INDICATE COMPRESSIVE
SD165 STRENGTH EQUAL AND NOT LESS TO 30 N/MM2.
320 4. THE MAXIMUM AGGREGATE SIZE DOES NOT EXCEED 20 MM.
5. ALL FOOTINGS ARE CONCENTRIC WITH COLUMNS UNQ.
6. THE FOUNDATION LEVEL(FNL) IS THE BOTTOM OF PC FOOTINGS.
7. ALL FOUNDATION ARE DESIGNED ON A MINIMUM SAFE BEARING CAPACITY 

70
0
OF 200  KN/M2 AT THE FOUNDATION LEVEL.

15
8. FOR THE LOCATION AND LEVELS OF OPENING AND SLEEVES IN ALL
EL -3.570

00
1620
9 X‐H MEMBERS REFER TO GENERAL ARRANGEMENT DRAWING IN CONJUNCTION 

17
150 SD165 WITH ALL OTHER ENGINEERING DRAWINGS.
9.         ALL DATA ARE ACCORDING TO FOUNDATION TYPE FOR EACH UNIT

0
Y‐2

15
DWG   NO . SB101

70 150
14

70
K 1 5 & DWG NO. SX601 .
70 150 1700 150 70 X‐K EL -3.570
15 & DWG NO. SA101
EL -3.570 EL -3.570 0
70

215150 1415
COVER:-
1850

1850

1850
EL -3.570 150 150
- UNLESS OTHERWISE NOTED , THE CONCRETE COVER OVER THE REINFORCING BARS SHALL BE AS
150
13 FOLLOWS:

70
1 SD165
70150 1200 150 70 X‐GA)CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH =
J
SD165 75 MM
X‐J B) FOUNDATION NOT EXPOSED TO EARTH OR WEATHER =50 MM
70 150 1700 150 70
Y‐1C) CONCRETE NOT EXPOSED TO EARTH OR WEATHER

980

980
2130 150 70 EL -3.500
150 70 1. BEAMS =25 MM
2. SLABS =25 MM
5

70 150

70 150
2270

150 3. COLUMNS & WALLS =30 MM


EL -3.570 SD165
6 MM CONSTRUCTION
JOINT
1200

150

H
KEY PLAN
70150

X‐H
50
50 150 9330 150 50 15
0
1850

REFER TO SUMP PIT DRAWING


48
480 150 50

480 150 50

480 150 50
480 150 50
0

G
50 150 3950 2800 2000 4275 150 50 X‐G

150 70 1130

1130
4 6

220
SD165 SD165
EL -3.570

4820

900
70150 1140 150 1080150 70

1500
EL -3.550 EL -3.550
70
4820

220
REFER TO SAND TRAP DRAWING
150 X‐F
150 250

70 150

STAIR STARTER WALL
F
X‐F

7 12
SD165 SD165
Drawing Schedule

3500
3500

SD Number Building Number Revision Number Revision Description Revision Date


25380

0145 RB-13-22,27 00 12-02-2020

EL -3.400

150
8 150 50 1150 EL -3.550 REFERENCES SCHEDULE

1150
SD165
10 150

1200
RFI Number Description
Number
SD165

150 50
150 50 910 4800 3360 1550 740 M‐2
EL -3.700
14 EL -3.700
1462

SD165 150 14 DESIGN DRAWN :


283 2740 150 3025
5220

SD165
M‐1

1358 150 150 150 150


1358 150 150 150 150

300
300

Owner:
300

300

900

900

300

300
300

1358 300
1058

1358

1358
Supervision Consultant:
300

D
www.ecgsa.com

Contractor:
3750

50 150 210 EL -3.550 EL -3.550


150
150
Contractor - Sub Consultant :

C
670

B
Architectural Designer:
1450

A
Structural Designer:

3
SD165

EL -3.500
150
RB13-27 RB13-22 www.ecgsa.com
MEP Designer:

-3.70 159.30 166.80 www.ecgsa.com

-3.57 159.43 166.93 Client Name: NEWGIZA


3090 1230 4120 2800 4540 4800 4910 4540 2800 2000

-3.55 159.45 166.95 Project Name: NH07-RB-13-(22&27)

34830
-3.50 159.50 167.00 DRAWING
TITLE:
Slab On Grade Concrete Dimensions - PART 1

-3.40 159.60 167.10 Extracted from BIM model: 2457-RB-13-S-TYP-(22-27)-R00

DWG.No: SD-07-RB-13-22,27-ST101-00-298 Sheet No: SD162 Revision NO. 00

01 02 03 04 05 06 07 08 09 10 11 SCALE 1 : 50 DATE: 2020-02-05

DESIGNED: ECG CHECKED: ECG


BASEMENT FLOOR CONCRETE DIMENSION PLAN part 1-3 BASEMENT LEVELS
1 1 : 50
2 1 : 50 DRAWN BY: FS REVIEWED BY: MT
Y‐4 X‐K Y‐5 X‐J X‐H Y‐6 X‐G Y‐7 X‐F Y‐8 X‐E Y‐9 Y‐10 X‐D X‐C X‐B X‐A
30
0
30 30
0 0
10 GENERAL NOTES :-
14 5

IN N
8

JO TIO
T
11

C
SD165

U
3

R
0 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS INDICATED OTHERWISE.

ST
N
70

O
2. ALL SHOWN LEVELS IN MILLIMETERS, UNLESS INDICATED OTHERWISE.

C
15

M
M
0 3. STANDARDISED R.C CONCRETE CUBE SHOULD BE SUBJECTED TO

6
Y‐3 15 LABORATORY CRASH TEST AFTER 28 DAYS TO INDICATE COMPRESSIVE

50
0 0

0
STRENGTH EQUAL AND NOT LESS TO 30 N/MM2.

07

15
EL -3.700

15
4. THE MAXIMUM AGGREGATE SIZE DOES NOT EXCEED 20 MM.

0
15

21
0 150

40
EL -3.570 70 5. ALL FOOTINGS ARE CONCENTRIC WITH COLUMNS UNQ.

11
0
EL -3.570

G
07
6. THE FOUNDATION LEVEL(FNL) IS THE BOTTOM OF PC FOOTINGS.

IN
15

AW
150

0
R
11 7. ALL FOUNDATION ARE DESIGNED ON A MINIMUM SAFE BEARING CAPACITY 

15
D
150
3

T
00

PI
0 OF 200  KN/M2 AT THE FOUNDATION LEVEL.

80
18

12

70
M

0
5

SU
22

01
0 8. FOR THE LOCATION AND LEVELS OF OPENING AND SLEEVES IN ALL
9 0

TO

15
15
MEMBERS REFER TO GENERAL ARRANGEMENT DRAWING IN CONJUNCTION 

ER

70
18 90

70

EF
SD165 5
Y‐2 0 0

R
WITH ALL OTHER ENGINEERING DRAWINGS.
98 22
0 0 9. ALL DATA ARE ACCORDING TO FOUNDATION TYPE FOR EACH UNIT
15

70
15 0 DWG   NO . SB101

0
Y‐1 15

15
98 0 & DWG NO. SX601 .
0 70 0
15

0
15 30 & DWG NO. SA101

15
0

ST
0

00
0 15

AI
EL -3.550

50
17
0


EL -3.570 70
13

ST
50 COVER:-

0
150

AR
5

91
15 8 - UNLESS OTHERWISE NOTED , THE CONCRETE COVER OVER THE REINFORCING BARS SHALL BE AS

TE
15
150 0 FOLLOWS:


50
48

W
70
0 A)CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH =

AL
15

L
12 75 MM

30
B) FOUNDATION NOT EXPOSED TO EARTH OR WEATHER =50 MM

12
SD165
C) CONCRETE NOT EXPOSED TO EARTH OR WEATHER
M‐2 90 1. BEAMS =25 MM
0 2. SLABS =25 MM

00
50
3. COLUMNS & WALLS =30 MM

48
39
Y‐10
13
M‐1 5 8
70
0

20
15

41
Y‐9
KEY PLAN
00

EL -3.550
17

EL -3.570
150
150
0
15

10
00
14
70

28

1 5 SD165

60
15

33
0
70 15

00
0

28
EL -3.550 12
0 0
150 Y‐8
00
20

J 150

50
EL -3.400

15
EL -3.550

0
74

40
Y‐7

45
EL -3.700
75
42

150
H
90
50 0
15
0 48
480 150 50

0
0
15

13
58
50

G
G
IN
AW

150 50
R
D
AP

Y‐6 Drawing Schedule

00
14
TR

48
D
N

SD Number Building Number Revision Number Revision Description Revision Date


SA

SD165 0145 RB-13-22,27 00 12-02-2020


EL -3.550
TO
ER
EF

150
R

REFER TO SAND TRAP DRAWING

15
0
15 3 REFERENCES SCHEDULE
0 SD165
15
30 0 RFI Number Description
0 15 Number
0
Y‐5
13

10
58

49
11
F 5 0
DESIGN DRAWN :
50
15
0

30 Owner:
0
30 EL -3.500
0
30 150
0
13 Supervision Consultant:
5

40
8 Y‐4

45
E www.ecgsa.com
1150

Contractor:
150 50

00
28

11 Y‐3 Contractor - Sub Consultant :

RB13-27 RB13-22
SD165
00
20

Y‐2 Architectural Designer:


-3.70 159.30 166.80
D
Y‐1 Structural Designer:

-3.57 159.43 166.93


www.ecgsa.com
MEP Designer:

-3.55 159.45 166.95 www.ecgsa.com

C Client Name: NEWGIZA

B
-3.50 159.50 167.00 Project Name: NH07-RB-13-(22&27)

DRAWING Slab On Grade Concrete Dimensions - PART 2


TITLE:
A
-3.40 159.60 167.10 Extracted from BIM model: 2457-RB-13-S-TYP-(22-27)-R00

320 DWG.No: SD-07-RB-13-22,27-ST101-00-299 Sheet No: SD163 Revision NO. 00

SCALE 1 : 50 DATE: 2020-02-05

BASEMENT LEVELS. DESIGNED: ECG CHECKED: ECG


2 1 : 50
M‐2 DRAWN BY: FS REVIEWED BY: MT
M‐1

BASEMENT FLOOR CONCRETE DIMENSION PLAN part 2-3


1 1 : 50
Y‐11 X‐K

RB13-27 RB13-22 X‐J GENERAL NOTES :-

90
30
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS INDICATED OTHERWISE.
Y‐10 2. ALL SHOWN LEVELS IN MILLIMETERS, UNLESS INDICATED OTHERWISE.
3. STANDARDISED R.C CONCRETE CUBE SHOULD BE SUBJECTED TO
-3.70 159.30 166.80 X‐H LABORATORY CRASH TEST AFTER 28 DAYS TO INDICATE COMPRESSIVE

30
Y‐9 STRENGTH EQUAL AND NOT LESS TO 30 N/MM2.

12
4. THE MAXIMUM AGGREGATE SIZE DOES NOT EXCEED 20 MM.
5. ALL FOOTINGS ARE CONCENTRIC WITH COLUMNS UNQ.
6. THE FOUNDATION LEVEL(FNL) IS THE BOTTOM OF PC FOOTINGS.
X‐G 7. ALL FOUNDATION ARE DESIGNED ON A MINIMUM SAFE BEARING CAPACITY 
-3.57 159.43 166.93 OF 200  KN/M2 AT THE FOUNDATION LEVEL.

20
8. FOR THE LOCATION AND LEVELS OF OPENING AND SLEEVES IN ALL

41
16 MEMBERS REFER TO GENERAL ARRANGEMENT DRAWING IN CONJUNCTION 
2 0 1 WITH ALL OTHER ENGINEERING DRAWINGS.
SD165
15 9. ALL DATA ARE ACCORDING TO FOUNDATION TYPE FOR EACH UNIT
Y‐8 0 DWG   NO . SB101
70
-3.55 159.45 166.95

30
& DWG NO. SX601 .

21
& DWG NO. SA101

COVER:-
EL -3.570

0
00
- UNLESS OTHERWISE NOTED , THE CONCRETE COVER OVER THE REINFORCING BARS SHALL BE AS

15
28
70

70
150 X‐F FOLLOWS:
15 A)CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH =
Y‐7 0
-3.50 159.50 167.00 12
0
75 MM
B) FOUNDATION NOT EXPOSED TO EARTH OR WEATHER =50 MM
0
C) CONCRETE NOT EXPOSED TO EARTH OR WEATHER
15
0 1. BEAMS =25 MM
70
2. SLABS =25 MM
3. COLUMNS & WALLS =30 MM

-3.40 4
159.60 167.10

40
45
SD165
X‐E
50

50
15
KEY PLAN

0
0

15
48
2 0
6
Y‐6 SD165
13 SD165

BASEMENT LEVELS .
2

00
SD165

31
1 : 50

5
SD165

0
83
00

34
48

00
28
X‐D

Y‐5 7
SD165

30
EL -3.550

34
EL -3.570 SD165
150
10

150
49

0
15
50

50
15
Y‐4 0
48
0 14 X‐C Drawing Schedule
6 2
SD Number Building Number Revision Number Revision Description Revision Date
0145 RB-13-22,27 00 12-02-2020
30
0
30 X‐B
30 0
0
10
14
40

5
IN N

48
45

8
JO TIO
T

11 2
C

0 SD165
U

3
R

0
ST
N

70
O
C

REFERENCES SCHEDULE
15
M
M

0
6

Y‐3 15
RFI Number Description
Number

50
0 0 EL -3.700 Y‐11

0
07

15
15
150 X‐A

0
15

21
0

40
70

11
0

EL -3.570
G
07
00

IN
15

AW

0
28

15
R

11 150 DESIGN DRAWN :


D

3
T
00

PI

18 0 80
12

70
M

46
0
5
SU

22
01

0 EL -3.570 5
9 0
0

0
TO

15
15

ER

70

18 90
70

150
EF

SD165 Owner:
Y‐2 5 0 0
R

98 22
00

0 0 15
70
20

Y‐1 15 0
0

15
15

98 0
0 70 50 0 Supervision Consultant:
15

0
15 15 30

15
0
ST

0 0
00

0 15
AI

50
17

0

70
13
ST

50

0
AR

91
EL -3.570 15 8 Y‐10
0

TE

www.ecgsa.com
15

0

50

M‐2 150 48
W
70

0
0

AL
15

M‐1
L

12 Contractor:

SD165

90
320 0 EL -3.550 Y‐9

00
50

48
39

150
13
5 8
70

Contractor - Sub Consultant :


0
15
00
17

150
0
15

10
00

14
70

EL -3.570
28

K 1 5 SD165 Architectural Designer:


60

15
33

0 EL -3.550
150 70 70 15
0
215150 1415

150
12
0 0
70

Y‐8
00

Structural Designer:
EL -3.550
20

J 150
50

EL -3.400
15

www.ecgsa.com
0
74

MEP Designer:

Y‐7
75
42

www.ecgsa.com
H
90
50 0
15
Client Name: NEWGIZA
0 48
150 50

0
0
15

13

Project Name: NH07-RB-13-(22&27)


58
50

150 50 Slab On Grade Concrete Dimensions - PART 3


DRAWING
Y‐6 TITLE:

Extracted from BIM model: 2457-RB-13-S-TYP-(22-27)-R00


M‐2 Y‐1 Y‐2 Y‐3 Y‐4 Y‐5
M‐1
DWG.No: SD-07-RB-13-22,27-ST101-00-300 Sheet No: SD164 Revision NO. 00

SCALE 1 : 50 DATE: 2020-02-05


BASEMENT FLOOR CONCRETE DIMENSION PLAN part 3-3
1 1 : 50 DESIGNED: ECG CHECKED: ECG

DRAWN BY: FS REVIEWED BY: MT


05

ISOLATION JOINT 20 300 20 ISOLATION JOINT GENERAL NOTES :-


EL -3.550 150 150 300 150150

150 50
150 50
EL -3.500 EL -3.500 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS INDICATED OTHERWISE.

150

150

150 200
BAS BAS 2. ALL SHOWN LEVELS IN MILLIMETERS, UNLESS INDICATED OTHERWISE.
3. STANDARDISED R.C CONCRETE CUBE SHOULD BE SUBJECTED TO
EL -3.700 LABORATORY CRASH TEST AFTER 28 DAYS TO INDICATE COMPRESSIVE
STRENGTH EQUAL AND NOT LESS TO 30 N/MM2.
4. THE MAXIMUM AGGREGATE SIZE DOES NOT EXCEED 20 MM.
5. ALL FOOTINGS ARE CONCENTRIC WITH COLUMNS UNQ.
6. THE FOUNDATION LEVEL(FNL) IS THE BOTTOM OF PC FOOTINGS.
7. ALL FOUNDATION ARE DESIGNED ON A MINIMUM SAFE BEARING CAPACITY 
OF 200  KN/M2 AT THE FOUNDATION LEVEL.
8. FOR THE LOCATION AND LEVELS OF OPENING AND SLEEVES IN ALL
MEMBERS REFER TO GENERAL ARRANGEMENT DRAWING IN CONJUNCTION 
SECTION 13-13 SECTION 14-14 WITH ALL OTHER ENGINEERING DRAWINGS.
13 1 : 25
14 1 : 25 9. ALL DATA ARE ACCORDING TO FOUNDATION TYPE FOR EACH UNIT
DWG   NO . SB101
& DWG NO. SX601 .
& DWG NO. SA101

COVER:-
- UNLESS OTHERWISE NOTED , THE CONCRETE COVER OVER THE REINFORCING BARS SHALL BE AS
FOLLOWS:
A)CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH =
75 MM
B) FOUNDATION NOT EXPOSED TO EARTH OR WEATHER =50 MM
C) CONCRETE NOT EXPOSED TO EARTH OR WEATHER
1. BEAMS =25 MM
07 2. SLABS =25 MM
M‐1 M‐2 280 600
3. COLUMNS & WALLS =30 MM
08
EL -3.400 1550 740 20 CONSTRUCTION JOINT
EL -3.550

170
EL -3.550

0
150 150

18

210
150 50
150100

EL -3.500 EL -3.500 EL -3.500

150 50

150 50
150

KEY PLAN

150

150
BAS BAS BAS

ISOLATION JOINT 20 300 20 ISOLATION JOINT

SECTION 10-10 SECTION 11-11 SECTION 12-12


10 1 : 25
11 1 : 25
12 1 : 25

G H J K
1850 2270 1850
03
480 150 50 1170 1070 70150 980 1830
EL -3.400 ISOLATION JOINT 20
ISOLATION JOINT EL -3.400
300 20 ISOLATION JOINT 420 20 740 50150
6 CONSTRUCTION JOINT EL -3.550 EL -3.570

100
EL -3.550 6 CONSTRUCTION JOINT
100

Drawing Schedule
EL -3.400

50 150100
150 50
EL -3.500 EL -3.500 EL -3.500

150 70
150 50
100

SD Number Building Number Revision Number Revision Description Revision Date

50

70 150
200

50
BAS BAS BAS 0145 00 12-02-2020
150

RB-13-22,27

50
50
50

150
50

6 CONSTRUCTION JOINT

REFERENCES SCHEDULE

RFI Number Description


Number

SECTION 7-7 SECTION 8-8 SECTION 9-9 DESIGN DRAWN :


7 1 : 25
8 1 : 25
9 1 : 25

Owner:

Supervision Consultant:

EL -3.400 EL -3.400 www.ecgsa.com


G H 03 04 05 EL -3.400
1850 4120 2800
Contractor:
300 20 ISOLATION JOINT 820 50 150 3100 2800 3430 150 50
100

EL -3.550 480 150 50 1170 6 CONSTRUCTION JOINT

50 150 100
50 150 100
EL -3.550

50 150
150 100
50

EL -3.500 EL -3.500 EL -3.500

150 50

150
50
150

50 150

50
BAS BAS BAS
6 CONSTRUCTION JOINT CONSTRUCTION JOINT 6

Contractor - Sub Consultant :

Architectural Designer:

SECTION 4-4 SECTION 5-5 SECTION 6-6


4 1 : 25
5 1 : 25
6 1 : 25 Structural Designer:

www.ecgsa.com
MEP Designer:
08 09 10 11
4540 2800 2000
K
www.ecgsa.com
H
10 70 150 1600 300 300 9120 300
70 150 30 1170 150 70
20 ISOLATION JOINT ISOLATION JOINT 20 Client Name: NEWGIZA
EL -3.570 ISOLATION JOINT 20 6 CONSTRUCTION JOINT CONSTRUCTION JOINT 6
EL -3.570

100 50
EL -3.500 EL -3.500 EL -3.500
50
150 70
150 70

Project Name: NH07-RB-13-(22&27)


70 150

70 150

70 150

150

BAS BAS BAS


50

100

6 CONSTRUCTION JOINT
DRAWING Slab On Grade Concrete Sections
TITLE:

Extracted from BIM model: 2457-RB-13-S-TYP-(22-27)-R00

DWG.No: SD-07-RB-13-22,27-ST101-00-301 Sheet No: SD165 Revision NO. 00

SCALE 1 : 25 DATE: 2020-02-05

SECTION 1-1 SECTION 2-2 SECTION 3-3 DESIGNED: ECG CHECKED: ECG
1 1 : 25
2 1 : 25
3 1 : 25
DRAWN BY: FS REVIEWED BY: MT