Corporate Contract Services,
Power Grid Corporation of India Ltd.,
`Saudamini’, Plot No.-2, Sector-29,
Gurgaon, Haryana – 122001.
India
Gentlemen,
………………………………………………………………………………………………
3.2 We are aware that the Schedules and the Bill of Quantities given
in the Bidding Documents do not generally give a full description
of the equipment and materials to be supplied and services to be
performed under each item and we shall be deemed to have read
the Technical Specifications and other sections of the Bidding
Documents and reviewed the Drawings to ascertain the full
scope of the requirements included in each item prior to filling in
the rates and prices in relevant price schedules. We agree that
the rates and prices to be quoted in these schedules shall be
deemed to include and account for the full scope as aforesaid,
including overheads and profit.
6. We agree to abide by this Bid for a period of 180 days after the
date fixed for Bid opening (i.e., excluding the date of bid opening)
under ITB Clause 15, Section-II: ITB, Conditions of Contract, Vol.-I
of the Bidding Documents, and it shall remain binding upon us
and may be accepted at any time before the expiration of that
period.
7. *We are making this proposal with a stipulation that you shall
award us three separate Contracts viz. ‘First Contract’ for all
works to be performed in countries outside India covering, inter-
alia, the Off-Shore Supply of equipment & materials including
mandatory spares (CIF Supply); ‘Second Contract’ for Supply of
equipment & materials including mandatory spares (Ex-works
Supply) and testing to be conducted within India; and ‘Third
Contract’ for providing all services i.e. port handling and custom
clearance of the imported goods; further loading and inland
transportation for delivery at site, unloading, storage, handling at
site, installation, testing and commissioning in respect of all
equipment & materials supplied under both ‘First Contract’ and
‘Second Contract’ and any other services specified in the Bidding
Documents. We declare that the award of three contracts, will
not, in any way, dilute the responsibility for successful operation
of Plant/Equipment and fulfilment of all obligations as per Bidding
Documents and that all the three Contracts will have a cross-fall
breach clause i.e., a breach in one Contract will automatically be
classified as a breach of the remaining contracts which will
confer on you the right to terminate the other contracts at our
risk and cost and/or recover damages under any or all the
Contracts.
Specification No.: C-14405-S162-3 BID FORM
Page 4 of 8
@@
Further, pursuant to Clause 24, Section-IV : SCC, Conditions of
Contract, Vol.-I of the Bidding Documents, we propose M/s
____________, whose capacity and experience are enclosed with
our Bid (at Attachment – I to the Bid Form), as our Assignee for
the purpose of executing the ‘Second Contract’ and/ or the ‘Third
Contract’. The written unequivocal consent of the above
mentioned proposed Assignee to work as your independent
Contractor, on the same terms and conditions as offered by us to
you in this bid, is also enclosed with the Bid (at Attachment – II
to the Bid Form##).
@@
In case the Assignee, despite his written consent fails to enter
into the ‘Second Contract’ and / or ‘Third Contract’ with you, or if
the Purchaser in his judgement does not find acceptance of the
proposed Assignee as its Contractor, then we undertake to enter
into and execute all the Contracts, inter-alia, containing the
aforesaid cross-fall breach clause. In such an event, the over-all
financial liability of the Purchaser, under the Contract shall,
however, not exceed that envisaged in our this bid.
[## For Attachments 1 & 2, Foreign Bidders may use their own
proformae for furnishing the required information with the Bid].
8.1 We confirm that, in our Bid Price, we have considered Service Tax
in line with provision of Clause 34.6 of GCC, Section-III, Vol.I of
the Bidding Documents.
9. Deviations
9.3 * In line with Clause No. 25.5, Section-ITB, Conditions of Contract, Vol.-I of the
Bidding Documents, we have declared the withdrawal price in Schedule-8A for
the deviations taken again the clauses mentioned above at 9.2 and we undertake
to execute the contract in line with the provisions of these clauses in case
Purchaser agrees to bear the withdrawal cost.
11. @We, the partners of the Joint Venture whose Signatures are
appended below, shall be liable jointly and severally for the
execution of the Contract(s), in the event of Award, in accordance
with the terms of Contract(s). The Lead Partner for this bid -
M/s ........................................., on behalf of the Joint Venture, is
submitting this bid. The Power of Attorney in favour of
M/s ................................... is enclosed.
13. We understand that you are not bound to accept the lowest, or
any bid you may receive.
Yours
faithfully,
(Signature of
authorised
Date : signatory)
(Printed
Place : Name)
(Designation)
(Common Seal)
Business Address
& Country of Incorporation
(State or Province to be
indicated)
[to be signed by Lead Partner in case of Joint
Venture]
(Signature of authorised
signatory)
(Printed Name)
(Designation)
(Common Seal)
Business Address
& Country of Incorporation
(State or Province to be
indicated)
Note :